Zhang Yanjie

Dr. Zhang Yanjie


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 December 2024 in Pure and Applied Geophysics
Verified
Journal Article
Closed access
PDF file
YWYizhe Wu
Yizhe Wu
HWHuanling Wang
Huanling Wang
ZYZhang Yanjie
Zhang Yanjie
CLChanghao Lyu
Changhao Lyu
YLYuxuan Liu
Yuxuan Liu
WWWenxiu Wang
Wenxiu Wang

13 June 2025 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
QSQi Shen
Qi Shen
HYHaiqiao Yang
Haiqiao Yang
ZZZhifang Zhou
Zhifang Zhou
ZCZhou Chen
Zhou Chen
ZYZhang Yanjie
Zhang Yanjie

10 April 2024 in Water
Verified
Journal Article
Open access
PDF file
zhou chenzhou chen
zhou chen
ZSZhaoqiang Su
Zhaoqiang Su
MLMei Li
Mei Li
QSQi Shen
Qi Shen
LFLufei Fan
Lufei Fan
ZYZhang Yanjie
Zhang Yanjie
The precise prediction of water inflow in tunnels is a key aspect of civil engineering. It is directly related to the progress of construction, the stability of caverns and the safety of construction personnel. Currently widely used calculation methods include the empirical formula method, the analytical method and the numerical simulation method. In situations where the geological conditions are complex and the boundary conditions are irregular, numerical simulation methods have clear advantages. However, there are still discussions about the rationality, accuracy and applicability of the definition of tunnel boundary conditions in numerical simulation methods. Based on the Groundwater Model System (GMS10.7) software, we investigate the feasibility of using the DRAIN module to describe tunnel boundaries and calculate water inflow. By comparing it with traditional empirical formulas, the feasibility of the method is verified, and the error is about 8%. In addition, this method is applied to predict the water inflow in the construction of an underground pumping station under complex geological conditions and the prediction is compared with the measured water inflow, and the error is about 20%. This article explains the physical meaning and the value method of the relevant parameters of the DRAIN module, providing basic support for the prediction of water inflow in tunnels.

29 March 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DDDenghui Dai
Denghui Dai
ZYZhang Yanjie
Zhang Yanjie
YZYunfei Zhang
Yunfei Zhang
ZWZhanbin Wang
Zhanbin Wang
ZLZhenya Li
Zhenya Li
Under most engineering conditions, soil disturbance due to pile installation may cause soil properties to vary within the region adjacent to the pile in the radial direction. This paper derives a rigorous solution to investigate the kinematic response of end-bearing piles under the excitation of vertical P-waves considering the construction effect. The displacement responses of piles and soil, governed by the dynamic equilibrium equation, are theoretically derived with the separation of variables method. The scattered waves induced by the pile–soil system, which is the key factor of the problem, are decoupled from the total wavefields. Moreover, the friction occurring at the interface of the soil and pile shaft are directly obtained. Thus, the present solution can accurately account for the pile–soil interaction. Comparisons between the numerical results of the present method and the available results are performed. A detailed discussion on the kinematic response coefficient, amplification factor, and soil motion is provided.

22 October 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ZYZhang Yanjie
Zhang Yanjie
HZHoule Zhang
Houle Zhang
YWYongxin Wu
Yongxin Wu
This study investigated the seismic response of rectangular tunnels with various embedment depths considering the spatial variability of soil shear modulus. The spectral representation method was adopted to simulate the anisotropic random field of soil. The excess pore water pressure, the liquefied zone, the ground displacement and the uplift displacement of the tunnel were obtained through the random finite difference method to analyze the seismic response. It was observed that the soil excess pore water pressure ratio under the tunnel gradually decreased and the liquefaction degree reduced with depth increase. The peak value of the liquefied zone range increased with the increase in embedment depth. The mean response of stochastic analysis was smaller than the deterministic calculation results when the tunnel embedment depth was less than 10 m. The maximum tunnel floating displacement obtained from random analyses had the probability of 67.3%, exceeding the value calculated by deterministic analyses when H = 12 m.

15 May 2023 in Remote Sensing
Verified
Journal Article
Open access
PDF file
XWXueliang Wang
Xueliang Wang
ZYZhang Yanjie
Zhang Yanjie
John J. ClagueJohn J. Clague
John J. Clague
SGSongfeng Guo
Songfeng Guo
QJQisong Jiao
Qisong Jiao
SQShengwen Qi
Shengwen Qi
The current limited approaches to calculating hillslope erosion rate hamper the study of the relationships among the rates of hillslope erosion, river incision, and tectonic uplift and hence the discussion of steady-state landscape evolution. In this paper, we use remote sensing and geochronological methods to calculate the upper and lower bounding hillslope erosion rates in the Qilian Shan range, Tibet. Our analysis focuses on five convex landslide sediment units derived from the weathered hillslopes at Qingyang Mountain on the tectonically active northeastern Tibetan Plateau. These sediment units range in thickness from 5.5 to 12.8 m and in volume from 119 × 103 to 260 × 103 m3. Based on field observations, measurements extracted from high-resolution DEMs, and optical stimulated luminescence (OSL) ages on fluvial terraces, we obtain lower and upper bounding rates of 0.13 ± 0.03 and 0.21 ± 0.04 mm/yr, respectively. Finally, we calculate incision rates, ranging from 0.21 ± 0.02 to 0.39 ± 0.01 mm/yr, from heights of a dated fluvial terrace above the present river and the time of abandonment of the associated bedrock strath estimated from OSL ages. The rates of hillslope erosion and river incision at Qingyang Mountain and the tectonic uplift of the Qilian Mountains are estimated to be within a factor of two over the past 117 ka, suggesting that a state of dynamic equilibrium has likely existed on this timescale.