30 April 2021 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
ABAlexis Andrés Barrientos
Alexis Andrés Barrientos
PBPablo Ballesteros-Perez
Pablo Ballesteros-Perez
DMDaniel Mora-Melia
Daniel Mora-Melia
MGMaria Carmen González-Cruz
Maria Carmen González-Cruz
MVMario Vanhoucke
Mario Vanhoucke
Purpose: Earned Value Management (EVM) is a project monitoring and control technique that enables the forecasting of a project's duration. Many EVM metrics and project duration forecasting methods have been proposed. However, very few studies have compared their accuracy and stability. Design/methodology/approach: This paper presents an exhaustive stability and accuracy analysis of 27 deterministic EVM project duration forecasting methods. Stability is measured via Pearson's, Spearman's and Kendall's correlation coefficients while accuracy is measured by Mean Squared and Mean Absolute Percentage Errors. These parameters are determined at ten percentile intervals to track a given project's progress across 4,100 artificial project networks with varied topologies. Findings: Findings support that stability and accuracy are inversely correlated for most forecasting methods, and also suggest that both significantly worsen as project networks become increasingly parallel. However, the AT + PD-ESmin forecasting method stands out as being the most accurate and reliable. Practical implications: Implications of this study will allow construction project managers to resort to the simplest, most accurate and most stable EVM metrics when forecasting project duration. They will also be able to anticipate how the project topology (i.e., the network of activity predecessors) and the stage of project progress can condition their accuracy and stability. Originality/value: Unlike previous research comparing EVM forecasting methods, this one includes all deterministic methods (classical and recent alike) and measures their performance in accordance with several parameters. Activity durations and costs are also modelled akin to those of construction projects.

2 May 2023 in Buildings
Verified
Journal Article
Open access
PDF file
ABAlexis Andrés Barrientos
Alexis Andrés Barrientos
PBPablo Ballesteros-Perez
Pablo Ballesteros-Perez
DMDaniel Mora-Melia
Daniel Mora-Melia
Alberto Cerezo-NarváezAlberto Cerezo-Narváez
Alberto Cerezo-Narváez
JGJimmy Gutierrez
Jimmy Gutierrez
Completing a project on time and on budget are essential factors for the success of any project. One technique that allows predicting the final cost of a project is earned value management (EVM). In this technique, different mathematical methods for predicting the final project cost have been proposed over the last 30 years. These formulas make use of activities’ actual costs and durations as the project progresses. EVM is a technique widely used by many project management professionals. However, very few studies have compared the stability and accuracy of the multiple existing methods for predicting the final cost of the project (commonly abbreviated as estimated cost at completion, EAC). This study compares the stability and accuracy of 30 deterministic cost prediction methods (EAC) in EVM. For this purpose, a representative database of 4100 simulated projects of various topological structures is used. Our results suggest that the methods with the simplest mathematical configurations achieve better stability and accuracy performance. Knowing which EVM methods are the most stable and accurate for predicting the final cost of the project will help project practitioners choose the most reliable cost prediction techniques when they are managing their own projects in real contexts.