Pablo Ballesteros-Perez

Dr. Pablo Ballesteros-Perez

orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2020 in Sustainable Cities and Society
Verified
Journal Article
Closed access
JZJingxiao Zhang
Jingxiao Zhang
LKLe Kang
Le Kang
HLHui Li
Hui Li
PBPablo Ballesteros-Perez
Pablo Ballesteros-Perez
MSMartin Skitmore
Martin Skitmore
JZJian Zuo
Jian Zuo

20 May 2021 in Environmental Science and Pollution Research
Verified
Journal Article
Closed access
PDF file
Jingxiao ZhangJingxiao Zhang
Jingxiao Zhang
GLGuanyang Lu
Guanyang Lu
MSMartin Skitmore
Martin Skitmore
PBPablo Ballesteros-Perez
Pablo Ballesteros-Perez

1 November 2016 in Computers & Operations Research
Verified
Journal Article
Open access
JGJimmy H. Gutiérrez
Jimmy H. Gutiérrez
CACésar A. Astudillo
César A. Astudillo
PBPablo Ballesteros-Perez
Pablo Ballesteros-Perez
DMDaniel Mora-Melia
Daniel Mora-Melia
ACAlfredo Candia-Véjar
Alfredo Candia-Véjar
The Team Formation problem (TFP) has become a well-known problem in the OR literature over the last few years. In this problem, the allocation of multiple individuals that match a required set of skills as a group must be chosen to maximise one or several social positive attributes.Specifically, the aim of the current research is two-fold. First, two new dimensions of the TFP are added by considering multiple projects and fractions of people's dedication. This new problem is named the Multiple Team Formation Problem (MTFP).Second, an optimisation model consisting in a quadratic objective function, linear constraints and integer variables is proposed for the problem. The optimisation model is solved by three algorithms: a Constraint Programming approach provided by a commercial solver, a Local Search heuristic and a Variable Neighbourhood Search metaheuristic. These three algorithms constitute the first attempt to solve the MTFP, being a variable neighbourhood local search metaheuristic the most efficient in almost all cases.Applications of this problem commonly appear in real-life situations, particularly with the current and ongoing development of social network analysis. Therefore, this work opens multiple paths for future research


2 February 2022 in Environment, Development and Sustainability
Verified
Journal Article
Closed access
PDF file
Jingxiao ZhangJingxiao Zhang
Jingxiao Zhang
JCJia-Wei Cheng
Jia-Wei Cheng
Simon P PhilbinSimon P Philbin
Simon P Philbin
PBPablo Ballesteros-Perez
Pablo Ballesteros-Perez
MSMartin Skitmore
Martin Skitmore
GWGe Wang
Ge Wang

19 February 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Alberto Cerezo-NarváezAlberto Cerezo-Narváez
Alberto Cerezo-Narváez
Andres Pastor-FernandezAndres Pastor-Fernandez
Andres Pastor-Fernandez
Manuel Otero-MateoManuel Otero-Mateo
Manuel Otero-Mateo
PBPablo Ballesteros-Perez
Pablo Ballesteros-Perez
Scope management allows project managers to react when a project underperforms regarding schedule, budget, and/or quality at the execution stage. Scope management can also minimize project changes and budget omissions, as well as improve the accuracy of project cost estimates and risk responses. For scope management to be effective, though, it needs to rely on a robust work breakdown structure (WBS). A robust WBS hierarchically and faithfully reflects all project tasks and work packages so that projects are easier to manage. If done properly, the WBS also allows meeting the project objectives while delivering the project on time, on budget, and with the required quality. This paper analyzes whether the integration of a cost breakdown structure (CBS) can lead to the generation of more robust WBSs in construction projects. Over the last years, some international organizations have standardized and harmonized different cost classification systems (e.g., ISO 12006-2, ISO 81346-12, OmniClass, CoClass, UniClass). These cost databases have also been introduced into building information modeling (BIM) frameworks. We hypothesize that in BIM environments, if these CBSs are used to generate the project WBS, several advantages are gained such as sharper project definition. This enhanced project definition reduces project contradictions at both planning and execution stages, anticipates potential schedule and budget deviations, improves resource allocation, and overall it allows a better response to potential project risks. The hypothesis that the use of CBSs can generate more robust WBSs is tested by the response analysis of a questionnaire survey distributed among construction practitioners and project managers. By means of structural equation modeling (SEM), the correlation (agreement) and perception differences between two 250-respondent subsamples (technical project staff vs. project management staff) are also discussed. Results of this research support the use of CBSs by construction professionals as a basis to generate WBSs for enhanced project management (PM).