Dieimys Santos Ribeiro

Dr. Dieimys Santos Ribeiro

Instituto de Engenharia Mecânica, Federal University of Itajubá, Itajubá, Brazil
orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 April 2023 in Energies
Verified
Journal Article
Open access
PDF file
ABAdriano Silva Bastos
Adriano Silva Bastos
TSTâmara Costa Souza
Tâmara Costa Souza
Dieimys Santos RibeiroDieimys Santos Ribeiro
Dieimys Santos Ribeiro
MMMirian Melo
Mirian Melo
CMCarlos Barreira Martinez
Carlos Barreira Martinez
Seas and oceans offer great potential as a widely available source of clean and renewable energy near high energy consumption centers. This source of energy is a valuable option in the energy transition and in energy matrix decarbonization. Wave energy and an oscillating water column (OWC) device stand out as the types of ocean energy with the most potential. An onshore OWC requires locations with rocky outcrops and steeper slopes as the device needs to be physically installed and has lower energy dissipation due to friction with the seabed. However, Brazil has approximately 7490 km of coastlines, with various shoreline geometries and geomorphologies, some of which are very suitable for OWC implementation. Some authors have estimated that the Brazilian coast has a total potential of 114 GW, distributed between wave and tidal energy, with a great possibility of contributing to global decarbonization efforts. This study aimed to identify and quantify the potential of locations suitable for implementing wave energy farms equipped with onshore OWC. For this, a prospect was carried out using the georeferencing software QGIS, resulting in a georeferenced map with a dataset of 319 locations, and determining a power capacity of exploitation of 9.84 GW and an estimated energy of 83,689 GWh/year in ten of the seventeen coastal states. This energy corresponds to twice the energy consumption of the state of Rio de Janeiro, which has a population of approximately 17.5 million people. If the same amount of wave energy as gas-fired thermal generation energy were to be consumed, the use of wave energy would reduce emissions by approximately 44.52 million tons of CO2 annually. This result suggests that wave energy generation should be included in future studies on the expansion of Brazilian electric systems as an accelerating factor in the energy transition.

6 July 2026 in Water
Verified
Journal Article
Open access
PDF file
GFGuilherme Ferraz
Guilherme Ferraz
CMCarlos Barreira Martinez
Carlos Barreira Martinez
Dieimys Santos RibeiroDieimys Santos Ribeiro
Dieimys Santos Ribeiro
Guilherme Sousa BastosGuilherme Sousa Bastos
Guilherme Sousa Bastos
ACAndrey LF Castro
Andrey LF Castro
RCRamon Rodrigues Vieira de Carvalho
Ramon Rodrigues Vieira de Carvalho
The increasing contribution of non-dispatchable renewable energy sources has changed the operating patterns of hydropower plants, especially in run-of-river schemes with limited storage capacity. Under intermittent dispatch, turbine shutdowns may occur while environmental-flow requirements must still be maintained. In these situations, spillway releases become more frequent, creating hydraulic conditions that can lead to total dissolved gas (TDG) supersaturation downstream. This study evaluates TDG supersaturation as an operational constraint in an Amazonian run-of-river hydropower plant. This assessment combines field measurements with controlled laboratory exposure tests using representative native fish species. Total gas pressure (TGP) was measured in both field and laboratory settings and converted into TDG saturation percentages. A laboratory-scale TDG generation system was developed to reproduce supersaturation conditions associated with spillway operation. Field measurements recorded TDG levels above 130% during spillway-activation events associated with dispatch decisions. In the laboratory, exposure tests showed rapid loss of viability in native Amazonian fish at TDG levels of 115% and above. These results indicate operational warning ranges for sustained spillway use. The findings suggest that TDG supersaturation should not be treated solely as an environmental issue. Rather, it represents a technical constraint on hydropower dispatch in systems with increasing renewable penetration. Incorporating TDG-related limits into operational planning and spillway management may help preserve hydropower flexibility while supporting environmental compliance.

21 August 2026 in Energies
Verified
Journal Article
Open access
PDF file
GFGuilherme Ferraz
Guilherme Ferraz
Dieimys Santos RibeiroDieimys Santos Ribeiro
Dieimys Santos Ribeiro
Guilherme Sousa BastosGuilherme Sousa Bastos
Guilherme Sousa Bastos
Walker Matheus Ferreira da SilvaWalker Matheus Ferreira da Silva
Walker Matheus Ferreira da Silva
ACAndrey LF Castro
Andrey LF Castro
CMCarlos Barreira Martinez
Carlos Barreira Martinez
As variable renewable generation grows, intermittent dispatch of run-of-river hydropower plants may transfer required environmental-flow releases from turbines to spillways, creating conditions that favor total dissolved gas (TDG) supersaturation and may constrain hydropower flexibility. This study presents a reproducible basin-scale screening assessment for 24 selected hydropower plants in the Brazilian Amazon and Tocantins–Araguaia basins. The analysis combines a plant inventory, spillway typology, standardized environmental-flow scenarios, and two configuration-specific linear relationships between unit discharge and the increase in TDG saturation (ΔTDG), derived from digitized Pubugou and Gongzui observations. Two release configurations were examined: flow distributed among all available bays and flow concentrated in a single bay as a theoretical hydraulic bounding case. The Pubugou-based relationship was applied only to broadly comparable ski-jump configurations within 9.1 ≤ UD ≤ 72.3 m3 m−1 s−1, whereas the Gongzui-based relationship was provisionally assigned, as an inventory-level first-order analog, to controlled spillways discharging into stilling basins within 34.6 ≤ UD ≤ 234.6 m3 m−1 s−1. Hydraulically dissimilar cases were classified as NE-H, and cases outside the applicable empirical domain as NE-UD. Digitization sensitivity, regression uncertainty, and model-form selection were explicitly evaluated and documented. None of the distributed-flow scenarios produced a numerical estimate: cases assigned to the Pubugou- or Gongzui-based relationships were classified as NE-UD, whereas hydraulically dissimilar free-surface cases were classified as NE-H. Four single-bay scenarios produced configuration-specific ΔTDG increments: 22.5–33.4 percentage points for three Gongzui-based cases and 13.6 percentage points for one Pubugou-based case. Upstream TDG was not added, and no plant-specific final concentration or universal ranking was reported. Sinop and Colíder observations were retained as qualitative contextual evidence of limited transferability and the importance of site-specific hydraulics. The outputs support conditional monitoring prioritization under standardized assumptions, not compliance prediction, ecological-risk assessment, or gate-operation recommendations. Synchronized monitoring and plant-specific rating curves are required before TDG-related variables can be incorporated into operational planning.