Juan Carlos Salas

Prof. Dr. Juan Carlos Salas

orcid

Research Focus & Metrics

Academic Career Length

33Years (1994-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 November 2019 in IEEE Transactions on Industrial Informatics
Verified
Journal Article
Closed access
FNFelipe Nunez
Felipe Nunez
SLSaul Langarica
Saul Langarica
PDPablo Diaz
Pablo Diaz
MTMario Torres
Mario Torres
JSJuan Carlos Salas
Juan Carlos Salas
This article presents a real implementation of a neural network-based model predictive control scheme (NNMPC) to control an industrial paste thickener. The implementation is done over an Industrial Internet of Things (IIoT) platform designed using the seven layer reference model for IIoT systems. Modeling is achieved using an encoder-decoder with attention recurrent neural network, while MPC search is done using particle swarm optimization. An industrial evaluation is presented, which highlights the set-point tracking and disturbance rejection capabilities of the proposed NNMPC technique.

1 February 1997 in Metallurgical and Materials Transactions B
Verified
Journal Article
Closed access
PDF file
JSJuan Carlos Salas
Juan Carlos Salas
JEJames Evans
James Evans
ONO. M. G. Newman
O. M. G. Newman
PAP. A. Adcock
P. A. Adcock

19 October 2020 in IEEE Access
Verified
Journal Article
Open access
JGjuan sebastian gomez
juan sebastian gomez
Jose RodriguezJose Rodriguez
Jose Rodriguez
Cristian GarciaCristian Garcia
Cristian Garcia
LTLuca Tarisciotti
Luca Tarisciotti
Freddy Flores-BahamondeFreddy Flores-Bahamonde
Freddy Flores-Bahamonde
JSJuan Carlos Salas
Juan Carlos Salas
The transition from fossil fuels to renewable energies as power sources in the heavy industries is one of the main climate change mitigation strategies. The carbon footprint in mining is related to its inherent extraction process, its high demand of electric power and water, and the use of diesel. However, considering its particular power requirements, the integration of microgrids throughout the whole control hierarchy of mining industry is an emergent topic. This paper provides an overview of the opportunities and challenges derived from the synergy between microgrids and the mining industry. Bidirectional and optimal power flow, as well as the integration of power quality have been identified as microgrid features that could potentially enhance mining processes. Recommendations pertaining to the technological transition and the improvement of energy issues in mining environments are also highlighted in this work.

1 February 1997 in Metallurgical and Materials Transactions B
Verified
Journal Article
Closed access
PDF file
AVA. Verma
A. Verma
JEJ. W. Evans
J. W. Evans
JSJuan Carlos Salas
Juan Carlos Salas

10 June 2023 in Processes
Verified
Journal Article
Open access
PDF file
YMYUYANG MU
YUYANG MU
JSJuan Carlos Salas
Juan Carlos Salas
Geometallurgy integrates aspects of geology, metallurgy, and mine planning in order to improve decision making in mining schedules. A geometallurgical model is a 3D space that is typically synthesized from early-stage small-scale samples and is composed of several metallurgical units, or domains. This work explores the synthesis of a geometallurgical model for a copper deposit using a purely data-driven unsupervised approach. To this end, a dataset of 1112 drill samples is used, which are clustered using different methods, namely, k-means, hierarchical clustering (AGG), self-organizing maps (SOM), and DBSCAN. Two cluster validity indices (Silhouette and Calinski–Harabasz) are used to select the final model. To validate the potential of the proposed approach, a simulated economic evaluation is conducted. Results demonstrate that k-means exhibits a better performance in terms of modeling and that using the obtained geometallurgical model for mining scheduling increases the project’s Net Present Value (NPV) by as much as 4%. Based on these results, the proposed methodology is an appealing alternative for generating geometallurgical models within greenfield, brownfield and ongoing operations.

1 September 1994 in Journal of Applied Electrochemistry
Verified
Journal Article
Closed access
PDF file
JSJuan Carlos Salas
Juan Carlos Salas
JEJ. W. Evans
J. W. Evans