Cheng Qian

Dr. Cheng Qian


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 March 2023 in Structures
Verified
Journal Article
Closed access
ZWZhangMing Wang
ZhangMing Wang
Nan ZhangNan Zhang
Nan Zhang
CQCheng Qian
Cheng Qian

13 July 2023 in Buildings
Verified
Journal Article
Open access
PDF file
CQCheng Qian
Cheng Qian
ZYZhian Yao
Zhian Yao
HCHuanyong Chen
Huanyong Chen
DLDewei Liu
Dewei Liu
MLMingyi Lin
Mingyi Lin
BZBin Zhang
Bin Zhang
With the development of the economy and transportation, more and more cross-sea bridges are appearing in people’s view. However, cross-sea bridges are not only subjected to repeated traffic loads but also to corrosion from the marine environment. In addition, the steel box girder deck plate is directly subjected to repeated vehicle loads, and its welded details are highly susceptible to fatigue damage and destruction, resulting in fatigue or corrosion damage to the welded top plate-U rib of the cross-sea steel box girder. This paper is based on fracture mechanics analysis methods and finite element simulation analysis, in order to establish the numerical analysis method of the welded top plate-U rib of the steel box girder deck plate fatigue, which is to take into account the coupling of the marine corrosive environment and fatigue cyclic loading, explore the welded top plate-U rib of the stress intensity factor, crack expansion, crack expansion life and total fatigue life of the welded details. Furthermore, the establishment of the welded top plate-U rib corrosion fatigue life assessment model is to explore the fatigue life of different top plate thicknesses. The results show that: the stress intensity factor along the crack front is symmetrically distributed, and with the increase in the crack expansion step, the corresponding stress intensity factor amplitude is also increasing; in addition, with the increase in the top plate thickness, fatigue crack expansion rate significantly reduced.

29 April 2022 in Applied Mathematics and Nonlinear Sciences
Verified
Journal Article
Open access
PDF file
BZBai Zhiping
Bai Zhiping
CQCheng Qian
Cheng Qian
WZWang Zhangming
Wang Zhangming
LTLiu Tiancheng
Liu Tiancheng
AJAn Jin
An Jin
Rapid construction of ripple web (RW) is a new construction technology that can be applied to the prestressed concrete (PC) box girder bridge with corrugated steel webs (CSWs). In order to analyse the mechanical behaviour in the construction process when the RW method is applied, the main bridge of Zhao-Jun Yellow River Super Large Bridge was adapted as the engineering background, and a three-dimensional simulation finite element model was established. Thereafter, detailed mechanical analyses were carried out for CSWs, top concrete and bottom concrete, lining concrete, temporary support and other structures in the construction process when the RW method was used. The results reveal the excellent quality of the mechanical properties of the structure, thus indicating the structure’s safety and reliability. This study can provide a reference for similar research and have a positive impact on the further promotion of the RW method for application in the continuous girder bridge with CSWs.