Aidin Nobahar Sadeghifam

Aidin Nobahar Sadeghifam

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2015 in Energy and Buildings
Verified
Journal Article
Closed access
ASAidin Nobahar Sadeghifam
Aidin Nobahar Sadeghifam
Seyed Mojib ZahraeeSeyed Mojib Zahraee
Seyed Mojib Zahraee
MMMahdi Moharrami Meynagh
Mahdi Moharrami Meynagh
IKIman Kiani
Iman Kiani

1 December 2016 in Urban Forestry & Urban Greening
Verified
Journal Article
Closed access
Amir MahdiyarAmir Mahdiyar
Amir Mahdiyar
STSanaz Tabatabaee
Sanaz Tabatabaee
ASAidin Nobahar Sadeghifam
Aidin Nobahar Sadeghifam
Saeed Reza MohandesSaeed Reza Mohandes
Saeed Reza Mohandes
AAArham Abdullah
Arham Abdullah
MMMahdi Moharrami Meynagh
Mahdi Moharrami Meynagh

1 December 2019 in Energy
Verified
Journal Article
Closed access
ASAidin Nobahar Sadeghifam
Aidin Nobahar Sadeghifam
MMMahdi Moharrami Meynagh
Mahdi Moharrami Meynagh
STSanaz Tabatabaee
Sanaz Tabatabaee
Amir MahdiyarAmir Mahdiyar
Amir Mahdiyar
AMAshkan Memari
Ashkan Memari
SISyuhaida Ismail
Syuhaida Ismail

1 January 2016 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
HGHamed Golizadeh
Hamed Golizadeh
ASAidin Nobahar Sadeghifam
Aidin Nobahar Sadeghifam
HAHamid Aadal
Hamid Aadal
MMMuhd Zaimi Abd Majid
Muhd Zaimi Abd Majid
Proper and accurate estimating of construction activities’ duration is a key factor, as it can cause the success or failure of a project. The common methods of duration estimating have shown some inaccuracies according to previous studies. This study aims to develop a tool for estimating the duration of construction’s major activities regarding to the structural elements of concrete frame buildings. This tool is appropriate for tropical regions. In order to reach this purpose, Artificial Neural Network (ANN) is employed as the core calculating engine of the tool. Through literature survey and experts interviewing, the factors which can critically influence the activity duration have been identified. By means of the collected data from actual cases, four ANN models have been trained and tested for estimating the duration of installing column reinforcements, installing beam reinforcements, column concreting and beam concreting activities. Finally, a web-based program was designed and tested as an automated tool for suiting engineers to estimate the duration of scoped activities based on ANN method. Engineers and decision makers in the tropical regions can utilize the developed tool in the planning phase of their projects to produce more accurate estimations of activity durations.

29 September 2016 in Jurnal Teknologi (Sciences & Engineering)
Verified
Journal Article
Closed access
PDF file
ASAidin Nobahar Sadeghifam
Aidin Nobahar Sadeghifam
AMAbdul Kadir Marsono
Abdul Kadir Marsono
IKIman Kiani
Iman Kiani
Umit IsikdagUmit Isikdag
Umit Isikdag
ABAli Asghar Bavafa
Ali Asghar Bavafa
STSanaz Tabatabaee
Sanaz Tabatabaee
During the previous two decades, the energy saving potential using systematic building management is considered to be important which should be considered through the building lifecycle. Among the wide range types of different buildings, Public buildings are considered as one of the biggest energy-consuming sector in the world and major part of this amount is used by the air conditioning system especially in tropical climates. The most effective decisions related to sustainable design of a building facility are made in the feasibility and early design stages. Building Information Modeling (BIM) can expedite this process and provide the opportunity of testing and assessing different design alternatives and materials selection that may impact on energy performance of buildings. This paper aims at evaluating the efficiency of various types of wall materials with regard to theirs properties on energy saving. The case study in this paper is modeled by means of BIM application and then simulated by software, which is appropriate for energy analysis. The current energy consumption patterns of this case identified and shifted to the optimized level of energy usages by changing the walls materials to find most optimized of walls materials. Modification most optimized wall materials and energy analysis indicated 9347 Wh in Per meter square of electrical energy saving.

23 June 2016 in International Journal of Construction Management
Verified
Journal Article
Closed access
HGHamed Golizadeh
Hamed Golizadeh
Saeed BanihashemiSaeed Banihashemi
Saeed Banihashemi
ASAidin Nobahar Sadeghifam
Aidin Nobahar Sadeghifam
Christopher Nigel PreeceChristopher Nigel Preece
Christopher Nigel Preece
An accurate estimation of construction duration for the successful completion of infrastructure projects is as important a task as keeping a project within the stipulated budget and quality. This research aims at developing an automated approach for estimating the duration of construction for dam projects by virtue of artificial neural network (ANN). Through literature searches and expert interviews, variables that critically influence the construction of dam projects were identified. A wide range of data on Iranian dam projects was used to develop seven ANN models. Different datasets were used to achieve the best performance by assessing the RMSE and R2 values as the reliability and validity indicators. Finally, a web-based automated prototype was developed and validated in order for stakeholders to estimate the duration of dam projects based on the ANN method and benefit from better infrastructure project management practices.