Weiqiang Guo

Dr. Weiqiang Guo


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 May 2023 in Scientific Reports
Verified
Journal Article
Open access
PDF file
GLGuangwei Liu
Guangwei Liu
WGWeiqiang Guo
Weiqiang Guo
SCSenlin Chai
Senlin Chai
JLJiaming Li
Jiaming Li
Reasonable production capacity is related to the economic benefits of an open-pit coal mine. This study analyzes the relationship between the working face length, the annual advancing speed and the production capacity. It constructs a production capacity function relationship model. Take the Baorixile open-pit coal mine as an example. The remaining unmined parts are divided into four regions, and the range of production capacity in each region is analyzed by the established model and the determined respectively. On this basis, three mining district division plans are proposed. By analyzing and comparing the stripping ratio, mining life of the district, fault influence, difficulty of transition connection in the mining districts, the convenience of transportation system layout and other indexes of each plan, Plan 3 is determined to be the optimal plan. The production capacity planning results of each mining district in this plan are as follows: the production capacity of the 3rd mining district is 30–35 Mt/a; the production capacity of the 4th mining district in Region 1 is 20–31 Mt/a, and the production capacity in Region 2 is 24–33 Mt/a; the production capacity of the 5th mining district is 20–27 Mt/a.

13 January 2023 in Frontiers in Earth Science
Verified
Journal Article
Open access
GLGuangwei Liu
Guangwei Liu
WGWeiqiang Guo
Weiqiang Guo
EFEnsan Fu
Ensan Fu
CYChuanda Yang
Chuanda Yang
JLJiaming Li
Jiaming Li
A dynamic optimization method was created to address the production schedule issue in an open-pit coal mine while taking into account the characteristics of the fuzzy structured element. The fuzzy mining capacities of all “geologically optimal push-back bodies” were then examined using the moving cove method. One of the most crucial elements in the process of open-pit coal mine production scheduling optimization is coal pricing. As a result, this work also presents a dynamic optimization technique for production scheduling that incorporates the prediction of economic time series and the generation of dynamic economic indices. An appropriate time series model is created to forecast the future coal price based on previous data on coal prices. The prediction results are used in the calculation of optimal mining body generation to dynamically obtain the optimal production scheduling model. The Baorixile Open-pit Coal Mine in China’s Inner Mongolia Autonomous Region is using this method. The Autoregressive Integrated Moving Average Model ARIMA is constructed to anticipate the coal price in the future 23 years by evaluating and processing the coal price from 2009 to 2022, and the ideal production scheduling scheme of the mine economics is afterwards identified. The ideal fuzzy coal mining volume, the potential production life, and the fuzzy total net present value (NPV) of the annual production scheduling are all provided at the same time. The optimization findings can better give fundamental support for mine design and future production since the fuzzy problem is accurately expressed by correct formulations.

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
BCBo Cao
Bo Cao
SWShuai Wang
Shuai Wang
Danqing SongDanqing Song
Danqing Song
HDHan Du
Han Du
WGWeiqiang Guo
Weiqiang Guo
The settlement and deformation of an open‐pit mine waste dump were investigated by using field monitoring and numerical methods. The creep parameters of fine soil sand in the dump fill were inverted using the steady Burgers creep model, and FLAC3D software was used to simulate the dumping soil construction and development program. The results show that the settlement displacement of the dump increases with the time of dumping soil and tends to be stable after 4 years. In the creep attenuation stage of the creep process, there is a big difference between the numerical calculation and the field monitoring results in the inversion process of fine‐grained soil sand parameters. In the steady‐state creep stage, the numerical calculation is consistent with the field monitoring value. The height of the fill has an influence on the settlement of the fill body of the dump and the time to reach the stability. The higher the filling height is, the greater the postconstruction settlement will be, and the longer it will take to reach stability. The pushing position of the fill body has a great influence on the settlement displacement of the dump. The time and efficiency of soil discharge can be shortened by optimizing the safe distance between the filling body and the river. Based on the numerical calculation results and the empirical settlement function, an analytical method for river channel location selection of internal dump is proposed.

1 July 2025 in Scientific Reports
Verified
Journal Article
Open access
PDF file
JYJie Yuan
Jie Yuan
GLGuangwei Liu
Guangwei Liu
SCSenlin Chai
Senlin Chai
WGWeiqiang Guo
Weiqiang Guo
YHYunlong Huang
Yunlong Huang
High-precision 3D coal seam models are crucial for refined mining design and precise production in open-pit coal mining. However, due to limitations like sparse initial data and challenges in obtaining geological realism data, these models are often static with insufficient spatial resolution. We propose a UAV coal-rock recognition and 3D coal seam model dynamic correction technology, which generates a UAV color point cloud and applies an improved region-growing algorithm and Alpha-shape algorithm for coal-rock identification and boundary points extraction. During the ongoing mining process in open-pit mines, the latest geological realistic data is dynamically integrated, and the spatial interpolation correction technique is used to calculate the correction values of the spatial interpolation points. The model is then dynamically corrected through a TIN update and growth reconstruction algorithm, continuously improving the accuracy of the coal seam 3D model. Application results show that the coal-rock recognition and boundary points extraction are highly effective, with accuracies of 97.44% and 91.85%, respectively. The standard deviation of the 3D coal seam model before and after correction is 0.32 m. Field measurements reveal that the average elevation error of the corrected model is 0.34 m, representing a 78.76% reduction in error compared to the initial model.

2 May 2024 in Scientific Reports
Verified
Journal Article
Open access
PDF file
WGWeiqiang Guo
Weiqiang Guo
GLGuangwei Liu
Guangwei Liu
JLJiaming Li
Jiaming Li
SCSenlin Chai
Senlin Chai
SGShupeng Guo
Shupeng Guo
The production plan of an open-pit mine depends on the block model, so it's crucial to determine the appropriate method and size for partitioning it. This study proposes a new method based on a closed shell three-dimensional geological model for determining block model size in open-pit mines. Instead of using regular block models, the shell model is directly cut, and the discrete geological body is referred to as the "mining model." Mining parameters and the shovel-truck's performance are integrated into the method. Bench height determines the Z-axis size, bench slope angle determines the inclination angle, and shovel width determines the X-axis size of the block model. The operation efficiency of the shovel-truck considers the probability distribution of simultaneous operations, allowing the determination of the Y-axis size of block models for different types of shovels. The developed "Mining Model" module in the software "Life Cycle Mining System" is used for practical implementation. By comparing the results with traditional block models, the superiority of the proposed method is demonstrated. This study provides a more accurate model for optimizing the production plan of open-pit mines throughout their life cycle.

6 January 2023 in Research Square
Verified
Preprint
Open access
PDF file
GLGuangwei Liu
Guangwei Liu
WGWeiqiang Guo
Weiqiang Guo
SCSenlin Chai
Senlin Chai
JLJiaming Li
Jiaming Li
The production capacity of open-pit coal mines is an important parameter of mine design and development. Production capacity planning is closely related to the economic benefits of mining enterprises. Therefore, it is greatly significant for open-pit coal mines to determine a reasonable production capacity. Determining reasonable production capacity is a complex system engineering problem. Involving the resource conditions of the mining area and various technical and economic factors inside and outside the mining area, it’s of great necessary for open-pit coal mines to combine the shape of the mining boundary to make a reasonable plan for the mining district division and the mining procedure. To rationally plan the production capacity of open-pit coal mines, this study analyzes the relationship among the working face length, the annual advancing speed and the production capacity for the first time, constructs a production capacity function relationship model, and determines the influence of coal seam thickness and working face length on production capacity under the constraints of mining range. The Baorixile open-pit coal mine as an example to illustrate an engineering application in detail. According to the distribution and mining situation of coal seams in the mining area, the remaining unmined parts are divided into four regions. The established function model is used to analyze each region's production capacity, and the four regions' production capacity ranges are determined respectively. On this basis, three mining district division plans for the Baorixile open-pit coal mine are proposed. By analyzing and comparing the stripping ratio, service life of the mining district, fault influence, difficulty of transition connection in the mining districts, the convenience of transportation system layout and other indexes and influencing factors of each plan. Plan 3 is determined to be the technically and economically feasible optimal plan for the mining district division and the mining procedure. According to the capacity relationship of each region, the production capacity planning results of each mining district in Plan 3 is determined as follows: the production capacity of the 3rd mining district is determined to be 30 ~ 35 million t/a, the production capacity of the 4th mining district in Region 1 is 20 ~ 31 million t/a, and the production capacity in Region 2 is 24 ~ 33 million t/a, the production capacity of the 5th mining district is 20 ~ 27 million t/a. The practical performance of the relationship model of production capacity in open-pit coal mines is proved.