Amirhossein Javaherikhah

Amirhossein Javaherikhah

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 March 2025 in CivilEng
Verified
Journal Article
Open access
PDF file
Amirhossein JavaherikhahAmirhossein Javaherikhah
Amirhossein Javaherikhah
Hadi SarvariHadi Sarvari
Hadi Sarvari
Airport facility management requires innovative and coordinated techniques due to the infrastructure’s complexity, stakeholders’ diversity, and the necessity of safety. Adopting building information management (BIM) as an advanced technology has several benefits, including increased productivity, lower cost, and higher quality of service. This study seeks to determine the strategies for using BIM in airport facility management. In this vein, two questionnaires were developed to collect data based on a literature review. The first questionnaire was used to collect data for identifying and ranking the main criteria, and the second questionnaire was used to identify the practical strategies. The experts of this study answered five strengths, four weaknesses, five opportunities, and five threats using a standardized questionnaire. An integrated AHP-SWOT approach was used to identify and examine the practical strategies. Furthermore, a sensitivity analysis was used to ensure the results were correct. The findings showed that smart maintenance management, with a weight of 0.363, was the most important strength in the SWOT analysis. Resistance to change was the most important weakness, with a weight of 0.455. The increasing need for smart airports with a weight of 0.358 was the most important opportunity, while cybersecurity issues with a weight of 0.385 were the most important threat. Integrating BIM into the aviation sector can enhance efficiency and sustainability in airport facility management while addressing potential opportunities and shared hazards that extend beyond airport operations.

5 February 2025 in Buildings
Verified
Journal Article
Open access
PDF file
Amirhossein JavaherikhahAmirhossein Javaherikhah
Amirhossein Javaherikhah
MLMERCEDES VALIENTE LOPEZ
MERCEDES VALIENTE LOPEZ
Hadi SarvariHadi Sarvari
Hadi Sarvari
This research investigates integrating Building Information Modeling (BIM) and blockchain technology to enhance building information’s security, reliability, and accuracy in Martian environments. Given the unique challenges posed by extraterrestrial construction, this study evaluates the feasibility of this hybrid approach through a structured SWOT (Strengths, Weaknesses, Opportunities, and Threats) analysis. Expert inputs were collected through a comprehensive questionnaire identifying nine strengths, eight weaknesses, eight opportunities, and six threats to implementing BIM and blockchain technology in space projects. The Analytical Hierarchy Process (AHP) was used to prioritize these factors. Findings indicate that the strengths are cost calculation and budgeting (26.21), and the weaknesses are technology complexity (25.488). Increased productivity (19.16) is the most important criterion at the opportunity point, and defects in data security (20.68) are the most important at the threat point. The SWOT analysis places BIM and blockchain integration in a conservative strategy quadrant, indicating that the technology holds significant promise but requires further development and refinement. Ultimately, this research contributes to the growing knowledge about extraterrestrial construction technologies and provides a foundation for developing flexible and autonomous building systems for Martian habitats.

30 November 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Amirhossein JavaherikhahAmirhossein Javaherikhah
Amirhossein Javaherikhah
MLMERCEDES VALIENTE LOPEZ
MERCEDES VALIENTE LOPEZ
Ever since mankind has known the world around him and space, he has been trying to find a suitable alternative for his current residence, the Earth. In this research, two main criteria for buildings on Mars and their information management were extracted by checking the library of studies on Mars. These two main criteria are the components of the building and the internal components of the building. The criteria for building components include the health of walls, the health of roofs, meteor protection, the health of facilities, and the health of windows (air exchange), and the internal components of the building, including air temperature, air pressure, ambient oxygen, ambient carbon dioxide, humidity, and the amount of light. These criteria, which were extracted from the library materials, were screened using the fuzzy Delphi method, which is one of the most accurate criteria screening methods and is completed by experts. After the opinions of experts, the criteria of health of walls, health of roofs, health of facilities, rejection, air exchange, ambient temperature, and oxygen content were extracted as final criteria. The results of the experts’ paired questionnaire were analyzed using the fuzzy AHP method, and the health criteria of the walls, the health of the ceilings, and air exchange have the first priority; the criteria of the ambient temperature and oxygen level are the second priority; and the criteria of the facilities are the last priority. These were placed as a suggestion, and it can be stated to the researchers that these priorities should be implemented in the blockchain platform so that the building information management system (BIM) works well in buildings on Mars and against any intrusion or damage. Being resistant, but it seems that the experts considered the components of the building separately from its protective components and put components such as the health of the window as a guarantee of the architecture of Martian buildings and did not include them as part of the main criteria of the research. Also, this research can be used as background for other research in this field.

27 June 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Daniel W.M. CHANDaniel W.M. CHAN
Daniel W.M. CHAN
DSDher Abdulhadi Sadeq
Dher Abdulhadi Sadeq
Hadi SarvariHadi Sarvari
Hadi Sarvari
David John EdwardsDavid John Edwards
David John Edwards
APAlireza Parsaei
Alireza Parsaei
Amirhossein JavaherikhahAmirhossein Javaherikhah
Amirhossein Javaherikhah
Today, building maintenance and repair (M&R) is a neglected aspect of the construction business throughout a building’s entire life cycle. Selecting appropriate M&R strategies is crucial, particularly for emerging economies like Iraq with severely constrained resources. This study seeks to identify the primary selection criteria for M&R methods of healthcare building facilities (HBFs) in Iraq. A comprehensive desktop literature analysis was undertaken to extract and determine the essential selection criteria for the most suited M&R approaches to buildings in general. Then, two rounds of the Delphi survey were conducted to consolidate the specific selection criteria to suit the circumstances of Iraq and HBFs. A total of 21 sub-criteria were identified and divided into six main groups. The main criteria and the associated sub-criteria were then analyzed and ranked using the fuzzy analytic hierarchy process (FAHP) technique. The ranking of the various main criteria revealed that the “cost” criterion was ranked first in terms of importance, followed by the “human resources” and “quality” criteria. The fourth, fifth, and sixth main criteria are “reliability/flexibility”, “safety/risk/environment”, and “facilities/technology”, respectively. The overall ranking of the sub-criteria placed “optimization and cost reduction” in the first position and “extending the life of the equipment and preserving their initial quality” in the bottom place. It is anticipated that the key findings and effective recommendations of this study will considerably contribute to the improvement of building maintenance and repair management practices in developing nations while enhancing different stakeholders’ understanding of the most important selection criteria for M&R methods, particularly with regard to healthcare building facilities in Iraq.

27 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
Amirhossein JavaherikhahAmirhossein Javaherikhah
Amirhossein Javaherikhah
PAPayman Alimohammadi
Payman Alimohammadi
Hadi SarvariHadi Sarvari
Hadi Sarvari
David John EdwardsDavid John Edwards
David John Edwards
Daniel W.M. CHANDaniel W.M. CHAN
Daniel W.M. CHAN
CCClara Cheung
Clara Cheung
As the foundation of national development, the construction industry is one of the most hazardous industries in the world, facing safety challenges and high rates of work-related accidents, especially in developing countries such as Iran, where 35% of all industrial accidents are related to construction accidents. In the meantime, construction site layout (CSL) design is vital in improving safety and cost efficiency, but the lack of comprehensive frameworks has limited its effective application. Traditional methods also create inefficiencies and additional costs due to the lack of flexibility in the face of project-specific constraints and unpredictable conditions. Significant research gaps exist, especially in Iran, where socioeconomic and cultural factors affect construction methods. This study aims to identify and analyze the critical factors affecting CSL in developing countries and provides a comprehensive framework that integrates regional constraints with global best practices. The main criteria identified in order of priority are hiring skilled professionals (weight: 0.32), hazardous materials management (weight: 0.25), and using advanced technologies (weight: 0.18). We first conducted a Delphi survey with domain experts using a hybrid approach to identify and refine key factors. Next, we utilized the Decision-Making Trial and Evaluation Laboratory (DEMATEL) and fuzzy logic to examine causal relationships among the factors. Additionally, we prioritized the factors based on their relative importance using the fuzzy analytic network process (FANP). This research provides a practical framework for CSL optimization that helps improve safety and reduce costs in construction projects.

15 November 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Amirhossein JavaherikhahAmirhossein Javaherikhah
Amirhossein Javaherikhah
MLMERCEDES VALIENTE LOPEZ
MERCEDES VALIENTE LOPEZ
Saeed Reza MohandesSaeed Reza Mohandes
Saeed Reza Mohandes
Due to the unique atmospheric conditions on Mars, the management of essential information in Mars buildings is of great importance. Even the smallest error or manipulation of data can create irreparable risks for residents. Martian buildings require a strong security shield to ensure accurate and unaltered data processing. In this article, the factors affecting the buildings of Mars and the lives of the inhabitants of Mars were identified and analyzed, and seven key factors were identified. These factors were then integrated into Mars building information systems using blockchain technology, defining four distinct alert levels for specific building conditions. This research is based on the simulation of Martian buildings, and there has been no laboratory case to test the proposed method until now. The findings showed that the proposed framework for Martian buildings was better than similar studies based on Earth, and there was no similar case to compare the results in Martian buildings. The ground-breaking integration of blockchain and building information modeling (BIM) on Mars opens up new opportunities for extraterrestrial building control methods and marks the beginning of the evolution of this field, but given that there is still no construction in the field of buildings on Mars, organizations and bodies that work in this field can use the results of this research to check the compatibility of the proposed method with Martian buildings.