Phuong Nguyen

Dr. Phuong Nguyen


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 January 2026 in Buildings
Verified
Journal Article
Open access
PDF file
Mohamed Abdelsalam MohamedMohamed Abdelsalam Mohamed
Mohamed Abdelsalam Mohamed
AMR ASHMAWIAMR ASHMAWI
AMR ASHMAWI
PNPhuong Nguyen
Phuong Nguyen
The construction industry faces challenges in estimating costs because the processes are time-consuming and involve a high likelihood of making errors. For instance, quantity take-offs are often inaccurate, and there is not a simple way to integrate data from Building Information Modeling (BIM) platforms and cost databases. This study introduces a framework that utilizes the Model Context Protocol (MCP) to ensure seamless integration between large language models (LLMs) and BIM models through Autodesk Revit in order to enable fully automated cost estimation workflows. The developed system combines an AI-powered MCP server with cost databases that are standard in the industry, such as the 2025 Craftsman National Building Cost Manual and the ZIP code-based location modifiers. This system enables LLMs to automatically obtain quantities from BIM models, match components to cost items, make regional changes, and make professional cost estimates. A case study of estimating the cost of an electrical system shows that the framework can reduce estimation time from 2.5–3.5 h (manual baseline) to 42.3 ± 3.7 s (n = 5 runs, warm start), representing a 98.6% efficiency gain, while being more accurate with respect to industry standards. The system processed 187 BIM elements in three component groups (receptacles, conduits, and panels). It automatically matched them to the right cost database items, used location-specific modifiers for ZIP code 01003, and made a full cost estimate of USD 13,945.81 with detailed breakdowns and a percent difference of %5.1 of the manual estimation. This research enhances automation in construction by developing a methodology for AI-BIM integration using standardized protocols, shows the practical application of AI in construction workflows, and provides empirical evidence of the advantages of automation in cost estimation processes. The results indicate that MCP-based AI integration presents a novel approach for construction automation, delivering improvements while applying professional standards of accuracy and availability.

11 October 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
LNLuke Nichols
Luke Nichols
AMR ASHMAWIAMR ASHMAWI
AMR ASHMAWI
PNPhuong Nguyen
Phuong Nguyen
State Departments of Transportation (DOTs) face challenges with traditional bridge inspections that are time-consuming, inconsistent, and paper-based. This study focused on an existing research gap regarding automated methods that streamline the bridge inspection process, prioritize maintenance effectively, and allocate resources efficiently. Thus, this paper introduces a digitalized bridge inspection framework by integrating Building Information Modeling (BIM) and Business Intelligence (BI) to enable near-real-time monitoring and digital documentation. This study adopts a Design Science Research (DSR) methodology, a recognized paradigm for developing and evaluating the innovative SmartBridge to address pressing bridge inspection problems. The method involved designing an Autodesk Revit-based plugin for data synchronization, element-specific comments, and interactive dashboards, demonstrated through an illustrative 3D bridge model. An illustrative example of the digitalized bridge inspection with the proposed framework is provided. The results show that SmartBridge streamlines data collection, reduces manual documentation, and enhances decision-making compared to conventional methods. This paper contributes to this body of knowledge by combining BIM and BI for digital visualization and predictive analytics in bridge inspections. The proposed framework has high potential for hybridizing digital technologies into bridge infrastructure engineering and management to assist transportation agencies in establishing a safer and efficient bridge inspection approach.

25 February 2026 in Structure and Infrastructure Engineering
Verified
Journal Article
Closed access
MBMinsoo Baek
Minsoo Baek
PNPhuong Nguyen
Phuong Nguyen
1. Bridges are critical components of infrastructure, serving as vital links in transportation networks and supporting economic growth (Neves et al., 2017). With over 617,000 bridges in the United ...

1 December 2025 in Journal of Engineering, Project, and Production Management
Verified
Journal Article
Open access
PDF file
PNPhuong Nguyen
Phuong Nguyen
MSMd Nazmus Sakib
Md Nazmus Sakib

31 July 2026 in International Journal of Construction Management
Verified
Journal Article
Closed access
NLNhien D. Le
Nhien D. Le
PNPhuong Nguyen
Phuong Nguyen
DTDaniel Tran
Daniel Tran
Quality assurance (QA) and quality control (QC) are foundational to the safety, durability, and performance of highway infrastructure (Mostafavi et al. 2013; Philips-Ryder et al. 2013; Aichouni et ...

Verified
Journal Article
Open access
PDF file
PNPhuong Nguyen
Phuong Nguyen
MMMohammadreza Mehrabian
Mohammadreza Mehrabian
LRLisa Rebenitsch
Lisa Rebenitsch
Rudrajit MitraRudrajit Mitra
Rudrajit Mitra
Wearable systems promise real-time detection of workers’ acute physiological stress in underground mining and construction, yet whether existing detectors are trained on the stressors that injure and kill workers has not been examined. This simulation-based methodological study introduces a framework that (1) harmonizes U.S. Mine Safety and Health Administration and Occupational Safety and Health Administration incident narratives into a cross-industry hazard taxonomy and a severity-weighted acute stressor burden, (2) benchmarks five shallow classifiers on heart rate variability and electrodermal features under leave-one-subject-out and leave-one-dataset-out protocols, and (3) composes the two through a severity-weighted Hazard–Stressor Coverage Gap Index built on an explicitly documented assumed coverage matrix. The framework is demonstrated on literature-calibrated simulated inputs that reproduce the documented structure of 13,000 narratives and four public wearable datasets (WESAD, SWELL-KW, Nurse-Stress, and Exam-Stress). In this instantiation, the most lethal hazards were not the most frequent, detector performance degraded from within- to cross-dataset evaluation mainly in threshold-dependent metrics, and existing benchmark paradigms represented roughly one-fifth of the severity-weighted stressor burden (0.17 to 0.35 under ±0.20 perturbation of every coverage entry). Sudden physical threat and near-miss stress accounted for about two-thirds of the uncovered burden and ranked first under every perturbation tested. The reported numbers characterize the pipeline on simulated inputs. The released pipeline runs unchanged on the public files. The contribution is a reproducible, severity-weighted method for prioritizing where new physiological data collection would most improve worker safety monitoring.