Mohamed Abdelsalam Mohamed

Mr. Mohamed Abdelsalam Mohamed

Research and Development, Noviqore Technology, Cairo, Al Qāhirah, Egypt
orcid
New Core of AEC Automation

Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 January 2026 in Buildings
Verified
Journal Article
Open access
PDF file
Mohamed Abdelsalam MohamedMohamed Abdelsalam Mohamed
Mohamed Abdelsalam Mohamed
AMR ASHMAWIAMR ASHMAWI
AMR ASHMAWI
PNPhuong Nguyen
Phuong Nguyen
The construction industry faces challenges in estimating costs because the processes are time-consuming and involve a high likelihood of making errors. For instance, quantity take-offs are often inaccurate, and there is not a simple way to integrate data from Building Information Modeling (BIM) platforms and cost databases. This study introduces a framework that utilizes the Model Context Protocol (MCP) to ensure seamless integration between large language models (LLMs) and BIM models through Autodesk Revit in order to enable fully automated cost estimation workflows. The developed system combines an AI-powered MCP server with cost databases that are standard in the industry, such as the 2025 Craftsman National Building Cost Manual and the ZIP code-based location modifiers. This system enables LLMs to automatically obtain quantities from BIM models, match components to cost items, make regional changes, and make professional cost estimates. A case study of estimating the cost of an electrical system shows that the framework can reduce estimation time from 2.5–3.5 h (manual baseline) to 42.3 ± 3.7 s (n = 5 runs, warm start), representing a 98.6% efficiency gain, while being more accurate with respect to industry standards. The system processed 187 BIM elements in three component groups (receptacles, conduits, and panels). It automatically matched them to the right cost database items, used location-specific modifiers for ZIP code 01003, and made a full cost estimate of USD 13,945.81 with detailed breakdowns and a percent difference of %5.1 of the manual estimation. This research enhances automation in construction by developing a methodology for AI-BIM integration using standardized protocols, shows the practical application of AI in construction workflows, and provides empirical evidence of the advantages of automation in cost estimation processes. The results indicate that MCP-based AI integration presents a novel approach for construction automation, delivering improvements while applying professional standards of accuracy and availability.

22 October 2026 in Buildings
Verified
Journal Article
Open access
PDF file
Mohamed Abdelsalam MohamedMohamed Abdelsalam Mohamed
Mohamed Abdelsalam Mohamed
AMR ASHMAWIAMR ASHMAWI
AMR ASHMAWI
PNPhuong Nguyen
Phuong Nguyen
Large language models (LLMs) are increasingly proposed for Building Information Modeling (BIM) work, yet published evaluations test one or two models on a single task using simplified inputs, leaving practitioners without an evidence base for choosing between them. This paper’s contribution is a four-track benchmark of ten current models run inside one commercial Revit add-in suite on the production workloads of a working BIM department: requirement extraction from a live ISO 19650 BIM Execution Plan; rule extraction from an 88-page scanned Arabic building code; multimodal drawing review with live application programming interface (API) access, adjudicated and reconciled by two practitioners; and ten colloquial prompts executed in Revit, each carrying an adversarial probe. Scoring combines itemized rubrics, human verification, cross-model consensus and file forensics with telemetry from 218 logged calls. Three models form a leading group, Claude Opus 5 at 88.7 of 100, GPT 5.6 Sol at 86.2 and Claude Fable 5 at 84.7. Neither re-weighting the composite 20,000 times nor repeating the agentic track displaces that group or moves a composite by more than 1.8 points, but the separation inside it is smaller than that variation, so no ordering inside the group is claimed. On these prompts fuzzy name resolution, not code generation, accounts for 60 percent of agentic points lost, which argues for guardrails enforced in the tool layer rather than assumed from model behavior.

17 October 2026 in Journal of Architectural Engineering
Verified
Journal Article
Closed access
PDF file
AMR ASHMAWIAMR ASHMAWI
AMR ASHMAWI
PNPhuong Nguyen
Phuong Nguyen
Mohamed Abdelsalam MohamedMohamed Abdelsalam Mohamed
Mohamed Abdelsalam Mohamed
On-site construction data management often relies on manual data entry, two-dimensional drawings, paper-based systems, and fragmented scheduling and costing workflows, leading to transcription errors, data duplication, and information latency. This paper presents SmartAEC, an automated data pipeline implemented as a custom C# plugin that extracts geometric and parametric data (volumes, material types, levels, dimensions) from 48 Building Information Modeling (BIM) element types in Autodesk Revit. The framework employs extract-transform-load logic to synchronize data with a Microsoft structured query language Server database via ADO.NET, in which BIM-derived quantities are transformed into four-dimensional (4D) (schedule) and five-dimensional (5D) (cost) analytics by linking them to user-defined labor productivity rates and material costs through automated C# calculations. The framework was validated through a retrospective paired-comparison case study of the concrete construction phase of a fast-track three-story building in Egypt, against audited as-built records. SmartAEC estimated the concrete phase duration at 55 days versus the 60-day actual (accuracy: 91.7%), compared with the traditional contractor estimate of 40 days (accuracy: 66.7%). For quantity takeoff, SmartAEC estimated 745.1 m 3 versus 748.2 m 3 actual (accuracy: 99.6%), compared with 735 m 3 traditional (accuracy: 98.2%). For total concrete cost, SmartAEC estimated 3,092,006 EGP versus 3,107,377 EGP actual (accuracy: 99.5%), compared with 3,057,519 EGP traditional (accuracy: 98.4%). The overall mean absolute percentage error was 3.1% for SmartAEC versus 12.2% for traditional methods, representing a 74.6% reduction in average estimation error. This study contributes a reproducible, validated BIM-to-Business Intelligence (BI) pipeline to automated 4D/5D project control, supported by preliminary single-case evidence. Limitations include the retrospective single-project design and dependence on user-defined productivity inputs.