1 January 2023 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
JWJinpeng Wang
Jinpeng Wang
SZShang Zhang
Shang Zhang
PFPeter Fenn
Peter Fenn
Xiaowei LuoXiaowei Luo
Xiaowei Luo
Yan LiuYan Liu
Yan Liu
LZLilin Zhao
Lilin Zhao
Previous studies revealed that Building Information Modeling (BIM) has the potential to reduce project uncertainties, design errors, change orders, and delays, which might facilitate achieving effective dispute management in the construction industry. However, research into the adoption of BIM to holistically enhance effective dispute management is limited compared with the plentiful BIM research in the construction management field. This study explored whether and how BIM adoption can help minimize the chronic problem of dispute in the industry. A structured critical literature review method was employed in this study which involved 102 papers in the fields of BIM and construction disputes. Nine main common causes of disputes (e.g., change order, design error, site problem, contractual problem, payment problem, and delay) and eight primary benefits of BIM application (e.g., improved visual management, design optimization, improved information management, and enhanced collaboration) were identified. A conceptual framework was developed illustrating the mechanism of adopting BIM to facilitate dispute management in the overall life cycle of construction projects. The framework indicates that design error, delay, and change order can be reduced most significantly by most of the BIM benefits, whereas improved visual management, improved information management, and enhanced collaboration are three of the most frequently adopted BIM benefits that can settle the majority of dispute causes. This study contributes to dispute management with a more holistic view of adopting BIM in the life cycle of construction projects, as illustrated in the conceptual framework. In addition, the identified common causes of disputes and primary benefits of BIM application are valuable for on future research in these two areas. The research findings are valuable for practitioners to obtain a holistic understanding of the two topics of dispute causes and BIM benefits, both independently and integrally. First, the identified common causes of disputes can be used by project managers to develop more-targeted strategies for reducing potential disputes in their projects. Second, the identified BIM benefits provide a comprehensive view of the advantages of BIM application for the clients, which will enable them to use BIM in their projects more proactively. Finally, and more importantly, the research findings indicated that BIM could be used to manage disputes in the global construction industry more effectively. The identified BIM features and other technologies or tools in dispute management present comprehensive results illustrating how to use BIM directly or indirectly for dispute management. In addition, the proposed framework is valuable for practitioners to find better solutions to prevent and control construction disputes via the application of BIM throughout the project life cycle.

1 March 2023 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PDF file
JWJinpeng Wang
Jinpeng Wang
SZShang Zhang
Shang Zhang
RJRuoyu Jin
Ruoyu Jin
PFPeter Fenn
Peter Fenn
DYDongwen Yu
Dongwen Yu
LZLilin Zhao
Lilin Zhao
Construction disputes have long been identified as epidemics in the construction industry worldwide, which has become a more serious problem due to the impact of the COVID-19 pandemic. Previous studies on the dispute causes have primarily focused on country- or region-specific contexts and hence the results cannot be generalized in solving this chronic problem in a broader construction project worldwide. This study aims to explore and evaluate the critical dispute causes in construction projects through a comparative study between China and the United Kingdom. A total of 33 common dispute causes were identified through a comprehensive literature review and further consolidated by pilot surveys in the two countries. An online questionnaire survey was administered among construction professionals in China and the United Kingdom, with 170 valid responses returned for data analysis. Principal component factor analysis, mean score ranking approach, quartile analysis, and Mann-Whitney U testing were employed to identify the most critical dispute causes. Similarities and differences were mapped between the two countries. It was found that the five most critical categories of dispute causes in the two territories are: delay-related problems, lack of communication, contractual problems, site conditions, and design problems. The importance of variation in quantities, breach of contract, misinterpretation of contractual terms and conditions, and poor contract management was perceived significantly differently by the respondents in China and the United Kingdom, whereas design defects and failure to make compensation for additional work were the most critical common dispute causes in both countries. The research provides important findings for both academics and practitioners to holistically understand the similarities and differences of dispute causes in China and the United Kingdom and aids in preventing disputes more effectively in the global construction industry.

5 February 2025 in Buildings
Verified
Journal Article
Open access
PDF file
CMChen Min
Chen Min
QZQian Zhang
Qian Zhang
YJYu Jiang
Yu Jiang
JWJinpeng Wang
Jinpeng Wang
SZShiyao Zhu
Shiyao Zhu
Natural and man-made disasters significantly challenge the safety and stability of urban infrastructure (UI), disrupting daily operations and impeding economic development. However, existing research on urban infrastructure resilience (UIR) lacks comprehensive categorization of critical infrastructure, insufficiently considers the impacts of natural disasters, and offers limited empirical analysis of the interactions among the pressure, state, and response (PSR) dimensions. This study aims to establish a comprehensive UIR assessment index and examine the coupling coordination (CC) levels and critical obstacle indicators of PSR resilience across four Chinese municipalities. The results reveal that (1) response resilience is most influential on overall coupling and is more amenable to artificial interventions than pressure and state resilience; (2) generally, the CC levels of PSR in the four municipalities were relatively high, advancing from an inferiorly to an intermediately balanced development stage over the study period, highlighting effective strategies such as enhanced resource allocation and post-disaster recovery initiatives are recommended for adoption by similar cities; and (3) critical obstacle indicators impeding UIR development were identified, and targeted interventions were proposed based on each municipality’s unique characteristics. The research findings offer theoretical insights and practical implications for enhancing UIR from the perspective of utilizing CC and PSR models.

30 August 2023 in Buildings
Verified
Journal Article
Open access
PDF file
JZJun Zhang
Jun Zhang
YZYing Zhang
Ying Zhang
YCYunjie Chen
Yunjie Chen
JWJinpeng Wang
Jinpeng Wang
LZLilin Zhao
Lilin Zhao
CMChen Min
Chen Min
Rapid urbanization and an increasing carbon footprint have underscored the need for sustainable practices in the construction industry. With the aim of prioritizing global sustainable development, the measurement of carbon emission efficiency in the construction industry (CEECI) has emerged as a critical indicator. Nevertheless, a comprehensive exploration of carbon emission efficiency within the Chinese construction sector remains limited, despite the pressing demand to mitigate carbon emissions. To address this research gap, this study aims to provide valuable policy recommendations for effectively reducing carbon emissions. We conducted a thorough assessment of both the total carbon emissions and the carbon emission intensity in 30 provinces and cities across China from 2010 to 2020. Utilizing the slacks-based measure (SBM) model with non-desired outputs, we evaluated the static CEECI, including the spatial correlation analysis and the evaluation of the carbon reduction potential in the construction industry (CRPCI). Additionally, the dynamic CEECI was quantified using the Malmquist–Luenberger (ML) index model, followed by an index decomposition analysis. The findings reveal several noteworthy insights: (1) There exists a positive correlation between carbon emissions in the construction industry and the economic scale. Generally, less developed areas (e.g., central and western regions of China) exhibit higher levels of carbon emission intensity (CEICI), while more developed areas (e.g., eastern regions of China) demonstrate lower levels of CEICI. (2) The CEECI across various provinces and cities demonstrates a clear spatial positive autocorrelation, while the CRPCI exhibits a negative correlation with the CEECI, with larger CRPCI values observed predominantly in western China. (3) Technological progress (MLTC) emerges as a crucial factor influencing the CEECI in our dynamic analysis. These findings offer valuable insights for policymakers to develop focused strategies to effectively mitigate carbon emissions nationwide.

10 September 2024 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
SZShang Zhang
Shang Zhang
JWJinpeng Wang
Jinpeng Wang
Yongjian KeYongjian Ke
Yongjian Ke
NLNan Li
Nan Li
ZSZhenwen Su
Zhenwen Su
Purpose: Turnover intention is a critical predictor of an employee’s turnover behaviour. A high level of turnover rate significantly affects the productivity and morale of an enterprise. Previous research has indicated that job satisfaction plays a critical role in influencing an employee's turnover intention, but the underlying factors related to job satisfaction remain under-explored, which impedes the development of effective strategies for reducing turnover intention. In addition, little research examined job satisfaction and turnover intention in the context of the COVID-19 pandemic, specifically in the Chinese construction industry. This study aims to investigate the impact of job satisfaction on turnover intention among professionals in the construction industry. Design/methodology/approach: A questionnaire survey was employed to collect viewpoints from 449 professionals in the Chinese construction industry, followed by descriptive analysis, correlation analysis and structural equation modelling analysis to derive results. Findings: The findings indicate that professionals in the industry generally have a slightly high level of job satisfaction while a slightly low level of turnover intention in the special period of the pandemic outbreak. Leadership and management, training and career development and interpersonal relationships are critical underlying factors leading to their turnover intention. Although demographic factors have no moderating effect between job satisfaction and turnover intention, among them, age, marital status and years of working experience have strongly positive relationships with job satisfaction while significantly negative relationships with turnover intention. Originality/value: The findings provide valuable insights to fully understand the critical factors leading to turnover intention from the perspective of job satisfaction, which is helpful in developing effective measures to address the turnover problems for enterprises in the Chinese construction industry and those industries with similar characteristics in other regions.

16 December 2024 in PLOS ONE
Verified
Journal Article
Open access
PDF file
LZLilin Zhao
Lilin Zhao
JWJinpeng Wang
Jinpeng Wang
SZShang Zhang
Shang Zhang
Unforeseen additional costs are major sources of cost overruns for the UK’s highway projects. General contractors normally allocate cost contingencies in their tender prices to cover these costs, primarily based on the judgements of their cost estimators. However, cost contingencies allocated to the same risk by different cost estimators can vary significantly. Although objective factors influencing the estimation of cost contingencies have been extensively investigated, subjective factors remain underexplored. Therefore, this paper aims to address this gap by investigating the subjective factors influencing cost estimators’ judgements through a qualitative study. Twelve semi-structured interviews were conducted with experienced cost estimators working for general contractors in the UK’s construction industry. A follow-up focus group study was also conducted with seven experienced cost estimators in the UK’s construction industry to validate the interview results. The findings reveal that there are thirteen influencing factors affecting cost estimators’ judgements on cost contingencies in highway construction projects. Seven of them, namely cost estimators’ ability to effectively communicate with stakeholders, self-reflection on previous practice, open-mindedness to project uniqueness, previous project experiences, risk attitude, assumption of the controllability of risks, and perceived quality of tender documents were identified as critical ones. They were grouped into two categories, including expertise-related factors and personal factors. The findings contribute to the lack of research on the subjective factors influencing cost estimators’ judgement-making process in highway construction projects in developed countries. The results also provide new practical insights for general contractors to develop more focused strategies and training programs to enhance the reliability of cost estimators’ judgements on cost contingencies, which can effectively reduce the probability of cost overruns.