Purpose: The risks associated with digital innovation increasingly challenge value co-creation among stakeholders within the innovation ecosystem. Stakeholder collaboration is helpful in preventing risk occurrence. This study intends to explore the effects of different stakeholder collaboration strategies on risk prevention performance in a digital innovation ecosystem context.Design/methodology/approach: A systematic literature analysis was first conducted to identify risk factors of digital innovation based on the technology–organization–environment (TOE) framework. Then, a bidimensional network model was constructed to visualize the collaborative relationships among stakeholders and the identified risks by focusing on a digital innovation case. The social network analysis method was applied to design stakeholder collaboration strategies from the ego and global network perspectives, and a simulation approach was conducted to evaluate the effects of the strategies on risk prevention performance.Findings: The results validate the positive effect of stakeholder collaboration on risk prevention performance and reveal the important role of network reachability in formulating collaboration strategies. The strategy of strong–strong collaboration strategy can best enhance risk prevention performance like a “Matthew effect” in the digital innovation ecosystem.Originality/value: First, risk identification based on the TOE framework provides a systematic list of risk factors for future digital innovation risk management research. Second, this study designs stakeholder collaboration strategies from a network perspective to enhance the understanding of the network status of each stakeholder and the network structure of the digital innovation ecosystem. Third, the simulation results reveal the effects of different collaboration strategies on risk prevention performance.
The risks found in project management have a spatio-temporal effect and can interact with each other. Such interactions can be presented as a risk interaction network (RIN), with the nodes as the risks and the edges as the interaction. This article devises a twofold process to assess the RIN, namely, 1) a three-step procedure for the division, weight elicitation, and aggregation to assess the edges, and 2) a two-step procedure comprising the node classification and weight elicitation to qualify the nodes. The RIN evaluation takes the assessed RIN as the input, including an index accommodating the project manager's level of risk-aversion and a simulation-based network model for computing the index. A graphical user interface is developed to highlight the data collection and processing. An international construction project is provided to validate the proposed approach of RIN assessment and evaluation. The results inform that the proposed index provides more accurate information for risk analysis.
18 December 2018 in Mathematical Problems in Engineering
Electronic waste recycle (e-recycling) is gaining increasing importance due to greater environmental concerns, legislation, and corporate social responsibility. A novel approach is explored for designing the e-recycling reverse logistics network (RLN) under uncertainty. The goal is to obtain a solution, i.e., increasing the storage capacity of the logistics node, to achieve optimal or near-optimal profit under the collection requirement set by the government and the investment from the enterprise. The approach comprises two parts: a matrix-based simulation model of RLN formed for the uncertainty of demand and reverse logistics collection which calculates the profit under a given candidate solution and simulated annealing (SA) algorithm that is tailored to generating solution using the output of RLN model. To increase the efficiency of the SA algorithm, network static analysis is proposed for getting the quantitative importance of each node in RLN, including the static network generation process and index design. Accordingly, the quantitative importance is applied to increase the likelihood of generating a better candidate solution in the neighborhood search of SA. Numerical experimentation is conducted to validate the RLN model as well as the efficiency of the improved SA.
Traditional off-the-job training is becoming ineffective in high-end equipment research and development (R&D) projects due to the contradiction between rapid technological progress and the slow growth of newcomers, calling for “on-the-job mentoring” to enable synchronized advancement of project execution and newcomer cultivation. For this, we propose the multi-skilled project scheduling problem with newcomer cultivation under uncertain durations (MSPSP-NCU) and abstract it as a stochastic programming model. The model aims to minimize expected makespan and maximize newcomers’ skill efficiency by optimizing workforce assignment that enables experienced workers to mentor newcomers while simultaneously optimizing task scheduling. Solving the model is blocked by the inherently NP-hard nature of the project scheduling problem and the stochasticity of the durations. Therefore, we put forward an adaptive simulation–optimization approach featuring two-fold: a simulation module capable of dynamically adjusting sample sizes based on convergence feedback and evaluating solutions with improved efficiency and stable accuracy; a tailored non-dominated sorting genetic algorithm II (NSGA-II) with adaptive evolutionary operators that enhance search effectiveness and ensure the identification of a well-distributed Pareto front. By using data from an aerospace component R&D project, the proposed approach is validated for its performance in identifying Pareto-optimal solutions. Several personalized rules are designed by integrating workforce development strategies into the selection process, providing actionable guidelines for cultivating newcomers in technology-intensive projects.