The bag of words (BoW) model is an efficient image representation technique for image categorization and annotation tasks. Building good feature vocabularies from automatically extracted image feature vectors produces discriminative feature words, which can improve the accuracy of image categorization tasks. In this paper we use feature vocabularies based biometric characteristic for identification on student ID and classification of students’ papers and various exam documents used at the University of Mostar. We demonstrated an experiment in which we used OpenCV as an image processing tool and tool for feature extraction. As regards to classification method, we used Neural Network for Recognition of Handwritten Digits (student ID). We tested out proposed method on MNIST test database and achieved recognition rate of 94,76% accuracy. The model is tested on digits which are extracted from the handwritten student exams and the accuracy of 82% is achieved (92% correctly classified digits)
Effort estimation is always quite a challenge, especially for agile software development projects. This paper describes the process of building a Bayesian network model for effort prediction in agile development. Very few studies have addressed the application of Bayesian networks to assess agile development efforts. Some research has not been validated in practice, and some has been validated on one or two projects. This paper aims to bring the implementation and use of Bayesian networks for effort prediction closer to the practitioners. This process consists of two phases. The Bayesian network model for task effort estimation is constructed and validated in the first phase on real agile projects. A relatively small model showed satisfactory estimation accuracy, but only five output intervals were used. The model was proven to be useful in daily work, but the project manager wanted to obtain more output intervals, although increasing the number of output intervals reduces the prediction accuracy. In the second phase, the focus is on increasing the number of output intervals while maintaining satisfactory accuracy. The advanced model for task effort estimation is developed and tested on real projects of two software firms.