Di Sun

Dr. Di Sun


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

2 April 2021 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
BZBaoping Zou
Baoping Zou
DSDi Sun
Di Sun
JMJundong Mu
Jundong Mu
ZXZhipeng Xu
Zhipeng Xu
The reasonable risk evaluation in the long-term operation of urban subway systems is of importance to the public safety and maintenance work of the subway. At present, the risk assessment always depends on a specified single factor which might result in a biased risk result. In order to take more influential factors into account, the multiple indices system is developed for the total risk evaluation in this work. The proposed multiple indices system is established on the basis of the logical structure of the analytic hierarchy process (AHP). It is based on the 7 selected factors in which the value of each factor is defined by its risk level and the corresponding weight is determined by the AHP calculation. The result obtained from the case study showed that the total risk levelgot from the proposed method is more reasonable than the traditional single index-based methods.

4 April 2025 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
DSDi Sun
Di Sun
ZTZhi-gang Tao
Zhi-gang Tao
HYHong Yang
Hong Yang
XLXiaotian Lei
Xiaotian Lei
MCMingjiu Cai
Mingjiu Cai
MHManchao He
Manchao He

28 December 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XLXiaotian Lei
Xiaotian Lei
DSDi Sun
Di Sun
KLKeyuan Liu
Keyuan Liu
QJQiqi Jia
Qiqi Jia
DLDewu Li
Dewu Li
YFYuxiang Feng
Yuxiang Feng
With the rapid development of China’s economy and the increasing demand for resources in various regions, the speed and volume of railway operations are increasing, and diseases such as mud pumping and mud pumping in railway tunnels are becoming more and more serious. Although various construction units have taken diverse measures to rectify the diseases, they often have poor results, repeated rectification, and repeated failure, which consumes a lot of financial and material resources but cannot cure the mud pumping disease, allowing the disease to seriously endanger the driving safety of the line. This paper is based on the long-established loess tunnel base mud pumping disease treatment project in the Lanzhou Railway Bureau of the China Railway. Firstly, the influence of train load, structural fracture, and tunnel drainage systems on the mechanism of disease is expounded. Then, the key technologies and processes of the commonly used disease treatment schemes are sorted out and summarized, and the advantages and disadvantages of the commonly used schemes and the additional drainage tunnel and self-priming pump technology proposed in this paper are compared in detail. The analysis shows that the universally used treatment technology applies to the treatment of local mud pumping disease in the tunnel, and there are shortcomings in these measures for the long-established tunnel. The drainage tunnel and self-priming pump technology can reduce and maintain the small content of groundwater in the surrounding rock of the tunnel basement and can resolve the mud pumping disease of the loess tunnel basement from the root. At present, this technology has been applied to many tunnel projects and has achieved certain comprehensive benefits, which could provide a reference for similar projects.