Zhipeng Xu

Dr. Zhipeng Xu


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
BZBaoping Zou
Baoping Zou
ZXZhipeng Xu
Zhipeng Xu
JWJianxiu Wang
Jianxiu Wang
ZLZhanyou Luo
Zhanyou Luo
LHLisheng Hu
Lisheng Hu
The quality of smooth blasting including the volume of over‐/underbreak and blasting‐induced damage of surrounding rocks has been extensively considered to be highly correlated to both the cost and advancement rate of rock tunnelling excavated by the drill‐blast method. A general control strategy for smooth blasting is too difficult to be available due to the uncertainties and complexity of rock masses, as well as the varying blasting operations. As prerequisite for the evaluation of the blasting quality, effective identification of the influential factors affecting smooth blasting usually plays a significant role in the improvement of smooth blasting design. Compared to the expensive and time‐consuming experiments including physical modelling and field tests, numerical modelling, as a cost‐efficient approach, offers an attractive alternative to investigate the influential factors in terms of weight, which might be more applicable and reliable for the optimization of smooth blasting parameters. In this case, the dominant factors and secondary factors can be quantitatively identified. Considering the dominant factors often orient the development of things; in this work, a numerical‐based approach was proposed to quantitatively identify the dominant factors influencing the quality of smooth blasting. Proposed 3‐dimensional blasting modelling was based on LS‐DYNA to simulate the occurrence of smooth blasting in rock masses, and the erosion algorithm was also employed to determine the fracturing of jointed rocks. The orthogonal experimental design method was utilized to optimize the experimental arrangement. Seven factors with 4 levels including the perimeter hole spacing, line of least resistance, charge concentration, charging explosive, type of rock mass, detonation velocity, and drilling deviation were taken into account. The geological setting and project background of a real rock tunnel served for the Chengdu‐Chongqing high‐speed railway were selected as the site conditions to perform the numerical investigation. Calculated area and distance of overbreak as the observed parameters indicating the quality of smooth blasting were utilized to determine sensitivities of factors based on the range analysis of orthogonal experiments. The results suggested that the type of rock mass has the greatest influence on the blasting quality, whereas the charge concentration and detonation velocity can be considered as the secondary factors under the specific site conditions. The proposed numerical approach for assessing influential factors of quality of smooth blasting under specified geological conditions is expected to improve the parameter design and operation of smooth blasting in practical applications.

5 December 2022 in Construction and Building Materials
Verified
Journal Article
Closed access
ZXZhipeng Xu
Zhipeng Xu
XFXuhai Feng
Xuhai Feng
ZCZhenguo Chen
Zhenguo Chen
SLShengsheng Li
Shengsheng Li
CLChangwu Liu
Changwu Liu

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
BZBaoping Zou
Baoping Zou
ZXZhipeng Xu
Zhipeng Xu
JWJianxiu Wang
Jianxiu Wang
ZLZhanyou Luo
Zhanyou Luo
LHLisheng Hu
Lisheng Hu
Full understanding of the total quality of tunnel contour after smooth blasting is quite a valuable task for accurately assessing the cost and construction rate. The traditional evaluation of tunnel contour quality which is always based on a single index such as the over/underbreak might not be rational enough because the contour quality at specific positions cannot completely stand for that of the total contour. Unreasonable evaluation of contour quality might cause construction delay or overbudget, as well as safety‐ and stability‐related issues or even catastrophic accidents under some specific conditions. In this case, evaluating the total quality of tunnel contour considering all influential factors is of significance to smooth tunnelling. The aim of this paper is to develop a multiple indices system which can represent the total quality of the contour from different aspects, and then, the projection pursuit dynamic cluster (PPDC) method is utilized to quantitatively evaluate the total quality of tunnel contour. The multiple indices are screened using the principal component analysis (PCA) and gray correlation analysis (GCA). The selected 9 indices to form the multiple indices system include the maximum overbreak, average overbreak, maximum underbreak, maximum size of step between two guns, area of overbreak, measured area, rate of overbreak, volume of overbreak, and blast hole utilization factor. The total quality of tunnel contour is quantitatively defined with 5 levels by using the dynamic cluster (DC) analysis. With the obtained values of the 9 indices, the total quality of the tunnel contour could be determined quantitatively according to the calculated projection eigenvalues. The result of the total quality of tunnel contour obtained using the proposed method is much more accordant with the site than that based on a single evaluation index. The proposed method will offer a promising alternative to fully understand the total quality of tunnel contour.

2 April 2021 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
BZBaoping Zou
Baoping Zou
DSDi Sun
Di Sun
JMJundong Mu
Jundong Mu
ZXZhipeng Xu
Zhipeng Xu
The reasonable risk evaluation in the long-term operation of urban subway systems is of importance to the public safety and maintenance work of the subway. At present, the risk assessment always depends on a specified single factor which might result in a biased risk result. In order to take more influential factors into account, the multiple indices system is developed for the total risk evaluation in this work. The proposed multiple indices system is established on the basis of the logical structure of the analytic hierarchy process (AHP). It is based on the 7 selected factors in which the value of each factor is defined by its risk level and the corresponding weight is determined by the AHP calculation. The result obtained from the case study showed that the total risk levelgot from the proposed method is more reasonable than the traditional single index-based methods.

4 June 2024 in Buildings
Verified
Journal Article
Open access
PDF file
YCYulin Chen
Yulin Chen
XXXuefei Xiong
Xuefei Xiong
WDWang Ding
Wang Ding
XZXianliang Zhou
Xianliang Zhou
CLChangwu Liu
Changwu Liu
ZXZhipeng Xu
Zhipeng Xu
The alkali–carbonate reaction (ACR) is a type of alkali–aggregate reaction (AAR) that may lead to serious damage in concrete construction. There is sufficient research on the effect of the ACR on dolomite limestone; however, research on the effect of the ACR on pure dolomite is absent, and there are a large number of dolomite resources that cannot be effectively utilized in civil engineering. This study aims to investigate whether the ACR occurs in pure dolomite spoil and to determine the freeze–thaw resistance of pure waste dolomite slag-based concrete (PWDSC). In this study, X-ray diffraction (XRD) and the lithofacies method (LM) confirmed that the tested samples were pure dolomite. The rock cylinder method (RCM) and rapid preliminary screening testing for carbonate aggregates (AAR-5) were employed to determine the alkali activity of pure dolomite: the RCM indicated a variation of −0.09% in length during the 84-day test period, the AAR-5 exhibited a length expansion rate of 0.03% within 28 days, and the expansion rates were less than 0.1%. These findings suggest that pure waste dolomite slag (PWDS) does not possess alkali activity. The freeze–thaw cycle test showed no significant spalling on the concrete surface, the inside of the cement produced few micro-cracks according to scanning electron microscopy (SEM), and the uniaxial compressive strength (UCS) test showed a decrease of approximately 20% after 200 freeze–thaw cycles. The results verified that ACR does not occur in PWDS and that it can withstand freeze–thaw damage, to a certain extent, when used as concrete coarse aggregate.

1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
ZXZhipeng Xu
Zhipeng Xu
XFXuhai Feng
Xuhai Feng
SLShengsheng Li
Shengsheng Li
LFLiming Fan
Liming Fan
CLChangwu Liu
Changwu Liu
In shaft construction, conducting shaft drilling and pregrouting simultaneously is expected to speed up the sinking rate and save the cost. Reasonable determination of the spatial locations of the drilled shaft and grouting holes and proper defining of the start time of each construction work are the crucial techniques. To smoothly execute the simultaneous operations, the bedrock to be grouted is divided into two sections. The upper bedrock is injected first using straight grouting holes to act as a tight cover to protect shaft drilling. Then, the lower formations are grouted using S‐shaped grouting holes, which are performed simultaneously with shaft drilling. The construction time of simultaneous operations of pregrouting for the lower bedrock using S‐shaped holes and shaft drilling is the saved time. The main technical challenges include the stability of grouting holes and safety of shaft walls, as well as the disposal of the contaminative waste drilling mud. The stability of grouting holes which might affect by the shaft drilling‐induced ground vibration could be evaluated according to the penetration of ground vibration caused by TBM tunnelling. If the grouting hole is in the range of ground vibration, protective measures including casing and ground improvement should be utilized to ensure the stability of grouting holes. The stability of unlined walls of the drilled shaft caused by the increased groundwater pressure can be achieved by a tight cover between the drilled shaft and pregrouting holes. The thickness of the cover is actually the length of the straight holes. The cover should have sufficient thickness and impermeability, which can considerably reduce or even completely stop the increased groundwater pressure in vicinity of the drilled shaft. The thickness and permeability of the cover could be determined using Maag’s solution for penetration of grouts in porous media. On the other hand, the waste drilling mud with proper modifications can be reutilized to prepare clay‐cement‐like grouts, which could provide an eco‐friendly and cheap solution to harmlessly treat the huge volume of waste drilling mud. The properties of waste drilling mud and behaviors of grouts prepared using the waste mud should be experimentally investigated before reutilization, owing to uncertainties of geology in various cases. The construction time using the simultaneous operation method is just about 60% of that of the traditional excavation method, and the low value of measured residual water inflow shows the reliability of reusing the waste drilling mud as grouting materials. The proposed method could virtually improve the shaft sinking rate and save the construction cost. The principles developed for these technical challenges have been proved to be applicable in practices, which are believed to strongly support the applicability of this new method in other cases.