Tausif Ahmed Ishtiaque

Mr. Tausif Ahmed Ishtiaque

Civil and Environmental Engineering, NTNU, Trondheim, Sør-Trøndelag, Norway
orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 October 2023 in Buildings
Verified
Journal Article
Open access
PDF file
NMNadina Memic
Nadina Memic
ATAllen Tadayon
Allen Tadayon
Nils OlssonNils Olsson
Nils Olsson
PWPaulos A. Wondimu
Paulos A. Wondimu
Tausif Ahmed IshtiaqueTausif Ahmed Ishtiaque
Tausif Ahmed Ishtiaque
OLOla Lædre
Ola Lædre
The pre-construction phase of public infrastructure projects is characterized by significant uncertainty as crucial decisions are made with limited information. This early stage of project development is influenced by a multitude of factors and input from various stakeholders. While early contractor involvement (ECI) offers potential benefits for both clients and projects, the timing and selection of tasks for involving the contractor are critical to achieving these benefits. This study seeks to identify key pre-construction activities in public infrastructure projects and pinpoint the activities that stand to gain the most from ECI. The research methodology involved conducting semi-structured interviews, organizing seven workshops, and conducting the literature and document studies. Through these efforts, the study identified a total of 20 pre-construction activities, among which 5 activities emerged as the most favorable candidates for ECI, while 5 others were deemed less suitable. The findings underscore a consensus that involving contractor expertise during the Brief Development sub-phase holds significant promise. Notably, activities associated with planning, environmental considerations, and technical aspects related to the scope clarification, were found to be highly amenable to ECI. Activities addressing uncertainty management received particular attention, with clients valuing contractors’ practical experience in risk assessment and mitigation. Additionally, contractors’ insights into planning, activity dependencies, and their contributions to health, safety, and environmental plans were highly regarded. However, activities, categorized under the more technical sub-phases of Concept Development and Detailed Engineering yielded mixed results, while those falling within the predominantly social and political domain and involving political processes and societal impact, were viewed as less suitable for early contractor involvement. These findings emphasize the need to adopt a systematic and consistent approach to pre-construction activities, highlighting that ECI should not be applied as a one-size-fits-all solution. The interview results somewhat contrast with the literature findings, which indicate that the early conceptual phase is most beneficial as the contractor impact is highest. To some extent, the client, contractor, and consultant still see their benefit and strategy before the good of the project.

27 September 2024 in International Journal of Construction Management
Verified
Journal Article
Open access
Tausif Ahmed IshtiaqueTausif Ahmed Ishtiaque
Tausif Ahmed Ishtiaque
PWPaulos Abebe Wondimu
Paulos Abebe Wondimu
OKOle Jonny Klakegg
Ole Jonny Klakegg

21 May 2025 in Built Environment Project and Asset Management
Verified
Journal Article
Closed access
Tausif Ahmed IshtiaqueTausif Ahmed Ishtiaque
Tausif Ahmed Ishtiaque
OKOle Jonny Klakegg
Ole Jonny Klakegg
Purpose: Early contractor involvement (ECI) has been heavily investigated in the context of large infrastructure projects. While there is a growing tendency among Norwegian infrastructure projects to use ECI, there is little evidence regarding the effects of ECI on small projects. This study aims to investigate the potential benefits and challenges of ECI in a small construction project in Norway. Design/methodology/approach: The research design is based on an embedded case study approach with longitudinal evaluation. The empirical data for this research comes from semi-structured interviews, survey questionnaires, focus group discussions and document analysis. Findings: The results show that ECI can benefit small projects requiring out-of-the-box thinking. The strongest arguments favoring ECI are that it promotes innovation, gives better risk adaptability, and allows participation from all client organization levels. In the case project, the onboarding of the operators was found to be especially helpful, which resulted in a more operationally optimized solution. The main challenges with using ECI for the case project were the lack of a standardized contract format, additional stress at the operational level and unfamiliarity with the overall process. Originality/value: This study provides new insights into the effects of ECI and adds to the debate regarding whether ECI can be a viable option for small construction projects in the future. The findings can give practitioners hints on optimizing ECI usage in small projects and avoiding potential pitfalls.