The boom-type roadheader is the foremost mining equipment in coal mines. At present, the automatic cutting technology is still immature for adjusting cutting speed automatically in accordance with rock strength, resulting in energy dissipation. In this study, we put forward a method with respect to detecting the geological strength index of coal seam profile through visual inspection, as well as characterize the geological strength index and control the cutting head for adjusting speed automatically based on inspecting fracture features on coal rock’s surface, aiming at achieving energy conservation control of boom-type roadheader. The image processing algorithm is adopted for detecting joint characteristics of palisades fracture, and a quantitative model of the geological strength index is established. The fractal dimension is used to obtain the distribution of geological strength indicators of a coal seam, and the heading machine’s cutting head is controlled for adjusting speed automatically. A vision control platform of boom-type roadheader is built in the laboratory to perform ground simulation experiments. According to experimental results, the difference between the geological strength index of the coal seam detected through visual inspection and the set value in the geological strength index chart is up to 3.5%, and the results are basically consistent, so the quantification of geological strength index can be performed rapidly and effectively. The average energy consumption of boom-type roadheader decreases by 5.4% after adopting self-adaptation control, realizing energy conservation and consumption reduction as well as intelligent control of coal mine machinery.
The implementation of roof bolt support within a coal mine roadway has the capacity to bolster the stability of the encompassing rock strata and thereby mitigate the potential for accidents. To enhance the automation of support operations, this paper introduces a binocular vision positioning method for drilling holes, which relies on the adaptive adjustment of parameters. Through the establishment of a predictive model, the correlation between the radius of the target circular hole in the image and the shooting distance is ascertained. Based on the structural model of the anchor drilling robot and the related sensing data, the shooting distance range is defined. Exploiting the geometric constraints inherent to adjacent anchor holes, the precise identification of anchor holes is detected by a Hough transformer with an adaptive parameter-adjusted method. On this basis, the matching of the anchor hole contour is realized by using linear slope and geometric constraints, and the spatial coordinates of the anchor hole center in the camera coordinate system are determined based on the binocular vision positioning principle. The outcomes of the experiments reveal that the method attains a positioning accuracy of 95.2%, with an absolute error of around 1.52 mm. When compared with manual operation, this technique distinctly enhances drilling accuracy and augments support efficiency.
Pose measurement of coal mine excavation equipment is an important part of roadway excavation. However, in the underground mining roadway of coal mine, there are some influencing factors such as low illumination, high dust and interference from multiple equipment, which lead to the difficulty in the position and pose measurement of roadheader with low measurement accuracy and poor stability. A combination positioning method based on machine vision and optical fiber inertial navigation is proposed to realize the position and pose measurement of roadheader and improve the accuracy and stability of the position and pose measurement. The visual measurement model of arm roadheader is established, and the optical fiber inertial navigation technology and the spatial coordinate transformation method are used. Finally, the Kalman filter fusion algorithm is used to fuse the two kinds of data to get the accurate roadheader pose data, and the inertia is compensated and corrected. Underground coal mine experiments are designed to verify the performance of the proposed method. The results show that the positioning error of the roadheader body using this method is within 40 mm, which meets the positioning accuracy requirements of roadway construction. This method compensates for the shortcomings of low accuracy and poor reliability of single vision measurement, single inertial navigation measurement and single odometer measurement.
Rock bolting is a commonly used method for stabilizing the surrounding rock in coal-mine roadways. It involves installing rock bolts after drilling, which penetrate unstable rock layers, binding loose rocks together, enhancing the stability of the surrounding rock, and controlling its deformation. Although recent progress in drilling and anchoring equipment has significantly enhanced the efficiency of roof support in coal mines and improved safety measures, how to deal with drilling rigs’ misalignment with the through-hole center remains a big issue, which may potentially compromise the quality of drilling and consequently affect the effectiveness of bolt support or even result in failure. To address this challenge, this article presents a robotic teleoperation system alongside a hybrid visual servo control strategy. Addressing the demand for high precision and efficiency in aligning the drilling rigs with the center of the drilling hole, a hybrid control strategy is introduced combining position-based and image-based visual servo control. The former facilitates an effective approach to the target area, while the latter ensures high-precision alignment with the center of the drilling hole. The robot teleoperation system employs the binocular vision measurement system to accurately determine the position and orientation of the drilling-hole center, which serves as the designated target position for the drilling rig. Leveraging the displacement and angle sensor information installed on each joint of the manipulator, the system utilizes the kinematic model of the manipulator to compute the spatial position of the end-effector. It dynamically adjusts the spatial pose of the end-effector in real time, aligning it with the target position relative to its current location. Additionally, it utilizes monocular vision information to fine-tune the movement speed and direction of the end-effector, ensuring rapid and precise alignment with the target drilling-hole center. Experimental results demonstrate that this method can control the maximum alignment error within 7 mm, significantly enhancing the alignment accuracy compared to manual control. Compared with the manual control method, the average error of this method is reduced by 41.2%, and the average duration is reduced by 4.3 s. This study paves a new path for high-precision drilling and anchoring of tunnel roofs, thereby improving the quality and efficiency of roof support while mitigating the challenges associated with significant errors and compromised safety during manual control processes.
Permanent highway support in deep coal mines now depends on the anchor drilling robot’s drill arm. The drilling arm’s trajectory planning using the conventional RRT (rapid-expanding random tree) algorithm is inefficient and has crooked, rough paths. To improve the accuracy of path planning, we propose an improved RRT algorithm. Firstly, the kinematic model of the drill arm of the drill and anchor robot was established, and the improved DH solution parameters and the positive solution of the drill arm kinematics were solved. The end effector’s attainable working space was calculated using the Monte Carlo approach. Additionally, to address the problem of the slow running speed of the RRT algorithm, an artificial potential field factor was introduced to construct virtual force fields at obstacle and target points and calculate the potential field map for the entire reachable workspace to improve the speed of the sampling points close to the target point. At the same time, the greedy approach and the three-time B-sample curve-fitting method were used simultaneously to remove unnecessary points and carry out smooth path processing in order to improve the quality of the drill arm trajectory. This was carried out in order to solve the issue of rough pathways generated by the RRT algorithm. Finally, 50 time-sampling comparison experiments were conducted on 2D and 3D maps. The experimental results showed that the improved RRT algorithm improved the average sampling speed by 20% and reduced the average path length by 14% compared with the RRT algorithm, which verified the feasibility and effectiveness of this improved RRT algorithm. The improved RRT algorithm generates more efficient and smoother paths, which can improve the intelligence of the support process by integrating and automating drilling and anchoring and providing reliable support for coal mine intelligence.