Yanghe Liu

Yanghe Liu


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 August 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
YLYanghe Liu
Yanghe Liu
HZHairong Zhang
Hairong Zhang
CWChuanfeng Wu
Chuanfeng Wu
MSMengxin Shao
Mengxin Shao
LZLiting Zhou
Liting Zhou
WFWenlong Fu
Wenlong Fu
In line with global carbon-neutral policies, wind power generation has received widespread public attention, which can enhance the security of supply and social sustainability. Since wind with non-stationarity and randomness makes power systems unstable, precise wind speed forecasting is an integral part of wind farm scheduling and management. Therefore, a compound short-term wind speed forecasting framework based on numerical weather prediction (NWP) is proposed coupling a maximum information coefficient (MIC), complete ensemble empirical mode decomposition with adaptive noise (CEEMDAN), shared weight gated memory network (SWGMN) with improved northern goshawk optimization (INGO). Firstly, numerical weather prediction is adopted to acquire the predicted variables with different domains, including the predicted wind speed and other predicted meteorological variables, after which the error is calculated using the predicted and actual wind speeds. Then, the correlation between the predicted variables and the error is obtained using the MIC to select the correlation factors. Subsequently, CEEMDAN is employed to decompose the correlation factors, corresponding the actual factors and the error into a series of subsequences, which are regarded as the input series. After that, the input series is fed into the proposed SWGMN to forecast each subsequent error, respectively, in which the shared gate is proposed to replace the input gate, the forgetting gate and the output gate. Meanwhile, the proposed INGO based on northern goshawk optimization (NGO), the levy flight disturbance strategy and the nonlinear contraction strategy is applied to calibrate the parameters of the SWGMN. Finally, the forecasting values are acquired by summing the forecasted error and the predicted wind speed from the NWP. The experimental results depict that the errors are small among all the models. Compared with the traditional method, the proposed framework achieves higher prediction accuracy and efficiency. The application of this framework not only assists in optimizing the operation and management of wind farms, but also reduces the dependence on fossil fuels, thereby promoting environmental protection and the sustainable use of resources.

1 November 2023 in Atmosphere
Verified
Journal Article
Open access
PDF file
YXYiHeng Xiang
YiHeng Xiang
YLYanghe Liu
Yanghe Liu
XZXiangxi Zou
Xiangxi Zou
TPTao Peng
Tao Peng
ZYZhiyuan Yin
Zhiyuan Yin
YRYufeng Ren
Yufeng Ren
Ensemble precipitation forecasts (EPFs) can help to extend lead times and provide reliable probabilistic forecasts, which have been widely applied for streamflow predictions by driving hydrological models. Nonetheless, inherent biases and under-dispersion in EPFs require post-processing for accurate application. It is imperative to explore the skillful lead time of post-processed EPFs for summer streamflow predictions, particularly in mountainous regions. In this study, four popular EPFs, i.e., the CMA, ECMWF, JMA, and NCEP, were post-processed by two state of art methods, i.e., the Bayesian model averaging (BMA) and generator-based post-processing (GPP) methods. These refined forecasts were subsequently integrated with the Xin’anjiang (XAJ) model for summer streamflow prediction. The performances of precipitation forecasts and streamflow predictions were comprehensively evaluated before and after post-processing. The results reveal that raw EPFs frequently deviate from ensemble mean forecasts, particularly underestimating torrential rain. There are also clear underestimations of uncertainty in their probabilistic forecasts. Among the four EPFs, the ECMWF outperforms its peers, delivering skillful precipitation forecasts for 1–7 lead days and streamflow predictions for 1–4 lead days. The effectiveness of post-processing methods varies, yet both GPP and BMA address the under-dispersion of EPFs effectively. The GPP method, recommended as the superior method, can effectively improve both deterministic and probabilistic forecasting accuracy. Moreover, the ECMWF post-processed by GPP extends the effective lead time to seven days and reduces the underestimation of peak flows. The findings of this study underscore the potential benefits of adeptly post-processed EPFs, providing a reference for streamflow prediction over mountain river basins.