Fei Xue

Dr. Fei Xue


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 March 2023 in Fatigue & Fracture of Engineering Materials & Structures
Verified
Journal Article
Closed access
FXFei Xue
Fei Xue
ZLZhongqin Lin
Zhongqin Lin
TWTianzuo Wang
Tianzuo Wang


15 July 2025 in Theoretical and Applied Fracture Mechanics
Verified
Journal Article
Closed access
FXFei Xue
Fei Xue
XZXin Zhou
Xin Zhou
XWXiaoqing Wang
Xiaoqing Wang
JWJianxing Wu
Jianxing Wu
ZLZhongqin Lin
Zhongqin Lin
SZShishi Zhou
Shishi Zhou

1 January 2019 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
FXFei Xue
Fei Xue
CXCaichu Xia
Caichu Xia
GLGuoliang Li
Guoliang Li
BJBaocheng Jin
Baocheng Jin
YHYongwang He
Yongwang He
YFYapeng Fu
Yapeng Fu
The effects of tunnel blast excavation on the lining structures of adjacent tunnels are comprehensively studied for the Xinling highway tunnel project. First, the LS‐DYNA software is applied to obtain the characteristics of vibration velocities and dynamic stresses at different positions of the tunnel liner. The results indicate that the maximum peak particle velocity (PPV) is located on the haunch of the lining facing the blasting source and that the PPV and peak tensile stress decrease with the increase in the surrounding rock grade. Second, a site test on blasting vibration is conducted to verify the simulation results. By using regression analysis of the measured vibration data, the calculation method of maximum charge per delay for optimizing blasting excavation under different surrounding rock grades is obtained. Finally, based on the statistical relationship between crack alteration and PPV on the lining before and after blasting, the safety thresholds of PPV for different portions of the tunnel are determined. The recommended safety threshold of PPV is 10 cm/s for intact lining and for B‐grade and V‐grade linings of the surrounding rock tunnel. However, if the lining crack grade falls between 1A and B, then the recommended safety thresholds of PPV for the III‐grade and IV‐grade surrounding rock tunnel are 5 cm/s and 6 cm/s, respectively. The threshold PPV proposed in this study has been successfully applied to restrict blast‐induced damage during new tunnel excavation of the Xinling tunnel project.

29 April 2015 in Energies
Verified
Journal Article
Open access
PDF file
NZNong Zhang
Nong Zhang
NZNong Zhang
Nong Zhang
LGLianyuan Gong
Lianyuan Gong
FXFei Xue
Fei Xue
XZXigui Zheng
Xigui Zheng
China, as the largest coal-producing and -consuming country in the world, is highly dependent on its coal industry, or “Black Gold” industry, for the national energy and economy. The consequent environmental crises, however, have persisted for decades, and the most serious effect is surface subsidence induced by underground mining. Underground coal excavation in China has ignored this problem for thousands of years, even though it causes conspicuous damage to the surface ecosystem and construction projects due to the subsidence of overlying strata. This study recommends paste backfilling to replace the space originally occupied by coal resources to avoid such subsidence and proposes backfilling schemes for two mainstream mining methods used in China’s collieries, namely, continuous mining and fully mechanised coal mining. These methodologies have been successfully implemented in some collieries, and the gob area can be backfilled immediately to prevent surface subsidence. To promote an ecological ideology when conflict exists between economic profits and environmental protection, experience from developed countries should be considered, support and appropriate legislation from the government are essential, and the perspective of colliery managers should be taken into account, and further in-depth study on strata subsidence and backfilling material must be pursued.

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
FXFei Xue
Fei Xue
MCMinjun Cai
Minjun Cai
TWTianzuo Wang
Tianzuo Wang
TZTongyang Zhao
Tongyang Zhao
The existence of karst caves poses a large threat to safe tunnel construction in a karst area. This paper presents a synthetic method to evaluate the collapse risk before subway tunnel construction with Yang‐Jian interval tunnel as a case study. The crosshole seismic Computed Tomography (CT) integrated with Geological Drilling (Geo‐D) was first applied to accurately delineate the karst location and its scale. Then, 483 groups of seismic wave CT images were recorded, and 524 karst cave anomalies were found. The height of karst caves in the study area is 1–20 m and mainly concentrated at approximately 5 m. The vertical distance between the karst cave and the tunnel is mainly within 15 m. According to the detection results, a series of numerical models were built and calculated using FLAC3D to investigate the effect of different sizes and locations of karst caves on the displacement and stability of the surrounding rock in tunnels. Afterwards, based on the simulation results, the disturbance degree evaluation index was established to quantitatively evaluate the risk level of karst caves. The evaluation results indicate that the buried depth of the karst cave greatly affects the disturbance degree. No treatment is required for the deeply buried karst cave that is more than 7 m from the tunnel. When the distance between the cave and the tunnel is less than 7 m, there is a critical size of the cave. Karst caves that are larger than that critical value must be filled with a single slurry or binary slurry before tunnel construction to eliminate the risk of tunnel collapse. This study can be used to provide a more efficient and economical program for metro tunnel construction above a karst cave.