Ruipu Dong

Ruipu Dong


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 September 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JLJinghua Li
Jinghua Li
WYWenhao Yin
Wenhao Yin
BYBoxin Yang
Boxin Yang
LCLi Chen
Li Chen
RDRuipu Dong
Ruipu Dong
HYHanchen Yang
Hanchen Yang
In the era of Industry 4.0 to 5.0, the manufacturing industry is dedicated to improving its production efficiency, control capability and competitiveness with intelligent enhancement. As a typical discrete manufacturing industry, it is difficult for ocean engineering (OE) manufacturers to accurately control the entire production process, and the establishment of an integrated system supported by digital twin (DT) technology is a better solution. This paper proposes a comprehensive set of system architectures for the DT workshop. It focuses on planning, which is the main line of control, to establish a model based on graph neural networks (GNNs) and suggests five decision-support approaches associated with the model from a practical application perspective. The utilization of complete twin data for prediction and visual simulation effectively eliminates the problem of unexpected factors interfering with scheduling in enterprise production planning and achieves the goals of rapid processing and just-in-time completion. The planning model is based on the attention mechanism, which characterizes the disjunctive graph, extracts the input GNN, and outputs the scheduling decision by constructing the multi-attention network of operations and machines to deal with the complicated “operation–machine” combination relationship. The proposed method has been verified in the case of structural assembly and welding workshops, has validity and reliability, and is superior to the traditional priority scheduling rules and heuristics in terms of precision rate and rapidity. Furthermore, the DT system completes the production line application, and its proven reliability supports its full-scale application in future smart factories.

27 August 2024 in Biomimetics
Verified
Journal Article
Open access
PDF file
JLJinghua Li
Jinghua Li
RDRuipu Dong
Ruipu Dong
XWXiaoyuan Wu
Xiaoyuan Wu
WHWenhao Huang
Wenhao Huang
PLPengfei Lin
Pengfei Lin
Hyper-heuristic algorithms are known for their flexibility and efficiency, making them suitable for solving engineering optimization problems with complex constraints. This paper introduces a self-learning hyper-heuristic algorithm based on a genetic algorithm (GA-SLHH) designed to tackle the logistics scheduling problem of prefabricated modular cabin units (PMCUs) in cruise ships. This problem can be regarded as a multi-objective fuzzy logistics collaborative scheduling problem. Hyper-heuristic algorithms effectively avoid the extensive evaluation and repair of infeasible solutions during the iterative process, which is a common issue in meta-heuristic algorithms. The GA-SLHH employs a genetic algorithm combined with a self-learning strategy as its high-level strategy (HLS), optimizing low-level heuristics (LLHs) while uncovering potential relationships between adjacent decision-making stages. LLHs utilize classic scheduling rules as solution support. Multiple sets of numerical experiments demonstrate that the GA-SLHH exhibits a stronger comprehensive optimization ability and stability when solving this problem. Finally, the validity of the GA-SLHH in addressing real-world decision-making issues in cruise ship manufacturing companies is validated through practical enterprise cases. The results of a practical enterprise case show that the scheme solved using the proposed GA-SLHH can reduce the transportation time by up to 37%.

1 January 2023 in Computer Modeling in Engineering & Sciences
Verified
Journal Article
Open access
PDF file
QZQi Zhou
Qi Zhou
JLJinghua Li
Jinghua Li
RDRuipu Dong
Ruipu Dong
QZQinghua Zhou
Qinghua Zhou
BYBoxin Yang
Boxin Yang
Offshore engineering construction projects are large and complex, having the characteristics of multiple execution modes and multiple resource constraints. Their complex internal scheduling processes can be regarded as resourceconstrained project scheduling problems (RCPSPs). To solve RCPSP problems in offshore engineering construction more rapidly, a hybrid genetic algorithm was established. To solve the defects of genetic algorithms, which easily fall into the local optimal solution, a local search operation was added to a genetic algorithm to defend the offspring after crossover/mutation. Then, an elitist strategy and adaptive operators were adopted to protect the generated optimal solutions, reduce the computation time and avoid premature convergence. A calibrated function method was used to cater to the roulette rules, and appropriate rules for encoding, decoding and crossover/mutation were designed. Finally, a simple network was designed and validated using the case study of a real offshore project. The performance of the genetic algorithm and a simulated annealing algorithm was compared to validate the feasibility and effectiveness of the approach.

17 February 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JLJinghua Li
Jinghua Li
YCYidong Chen
Yidong Chen
LZLei Zhou
Lei Zhou
RDRuipu Dong
Ruipu Dong
WYWenhao Yin
Wenhao Yin
FZFan Zhang
Fan Zhang
In the context of increasingly competitive shipbuilding, the flexible multi-level picking system, composed of high-rise shelves, Automated Guided Vehicles (AGVs), and picking stations, has been of gradual interest because of its advantages in operation efficiency, system flexibility, and system robustness. Compared with other simple-level systems, the flexible multi-level picking system has a more complex coupling temporal relationship, which makes the scheduling optimization of shipbuilding automated collaborative order picking (SACOP) extremely difficult. In order to avoid the dilemma of finding a feasible and optimal collaborative scheduling scheme under the constraints of a complex temporal relationship, this paper proposed a multi-AGV-driven pallet-picking scheduling optimization (MADPSO) method, which takes the AGV scheduling scheme as the direct solution and modifies it to a feasible solution under the reasonably designed interaction strategy of stacker, AGV, and the interaction strategy of picking station, AGV. Furthermore, taking the minimum energy consumption and operation time as the optimization objectives, a multi-objective optimization mathematical model was established to describe MADPSO, and an improved NSGA-III algorithm was designed to solve the problem. Finally, several experiments were conducted in various scenarios and verified that using MADPSO can achieve a comprehensive optimization index improvement of 52.02–75.66% compared with traditional picking methods, which has a certain reference significance for shipyards.

25 August 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JLJinghua Li
Jinghua Li
WHWenhao Huang
Wenhao Huang
XWXiaoyuan Wu
Xiaoyuan Wu
RDRuipu Dong
Ruipu Dong
PLPengfei Lin
Pengfei Lin
This study examines the challenges related to the storage and distribution of cabin materials on board during the construction of cruise ships. The construction process of cruise ships involves the assembly of various cabin materials, which are temporarily stored and transported in a complex deck environment with multiple obstacles. These processes can be viewed as location-routing problems (LRPs). However, existing solutions for LRPs do not account for the obstacles commonly encountered in deck environments. Therefore, this paper introduces a new variant of LRPs, termed as the BE-LRP (blocking environment location-routing problem). Initially, by considering the optimization objectives of minimizing the distribution distance and the number of vehicles required, the paper develops an optimization model for the location-routing of on-board materials while taking obstacles into consideration. Subsequently, a method for estimating blocked distances is proposed. This method utilizes Gaussian process regression to predict blocked distances and enables the rapid estimation of distances obstructed by obstacles between different destinations. Lastly, a hybrid obstacle blocking distance processing HO-NSGAII algorithm is formulated to address the BE-LRP. Experimental comparisons demonstrate that the distribution scheme derived from this research method does not necessitate modifications to the delivery distance when compared to the traditional NSGAII algorithm, and better aligns with the actual deck conditions. With an equivalent number of delivery vehicles, the scheme results in shorter delivery distances. The delivery distance can be reduced by 3–17% under varying circumstances. These findings are advantageous for enhancing the efficiency of cruise ship construction and mitigating the impact of warehousing and distribution on construction progress.

22 July 2024 in Mathematics
Verified
Journal Article
Open access
PDF file
RDRuipu Dong
Ruipu Dong
JLJinghua Li
Jinghua Li
Dening SONGDening SONG
Dening SONG
BYBoxin Yang
Boxin Yang
LZLei Zhou
Lei Zhou
Prefabricated cabin modular units (PMCUs) are a widespread type of intermediate products used during ship or offshore platform construction. This paper focuses on the scheduling problem of PMCU assembly flow shops, which is summarized as a multi-objective, fuzzy-blocking hybrid flow-shop-scheduling problem based on learning and fatigue effects (FB-HFSP-LF) to minimize the maximum fuzzy makespan and maximize the average fuzzy due-date agreement index. This paper proposes a multi-objective non-dominated sorting gravitational search algorithm (MONSGSA) to solve it. In the proposed MONSGSA, the ranked-order value is used to convert continuous solutions to discrete solutions. Multi-dimensional Latin hypercube sampling is used to enhance initial population diversity. Setting up an external archive to maintain non-dominated solutions while introducing an adaptive inertia factor and a trap avoidance operator to guide individual positional updates. The results of multiple sets of experiments show that Pareto solutions of MONSGSA have better distribution and convergence compared to other competitors. Finally, the instance of PMCU manufacturer is used for validation, and the results show that MONSGSA has better applicability to practical problems.