Yaping Fu

Dr. Yaping Fu


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 October 2024 in Computers and Electrical Engineering
Verified
Journal Article
Closed access
Yaping FuYaping Fu
Yaping Fu
YWYifeng Wang
Yifeng Wang
KGKaizhou Gao
Kaizhou Gao
MHMin Huang
Min Huang

5 January 2024 in Engineering Applications of Artificial Intelligence
Verified
Journal Article
Closed access
PLPei Liang
Pei Liang
Yaping FuYaping Fu
Yaping Fu
KGKaizhou Gao
Kaizhou Gao

10 August 2021 in Complex & Intelligent Systems
Verified
Journal Article
Open access
PDF file
PLPei Liang
Pei Liang
Yaping FuYaping Fu
Yaping Fu
KGKaizhou Gao
Kaizhou Gao
HSHao Sun
Hao Sun
Big data have been widely studied by numerous scholars and enterprises due to its great power in making highly reliable decisions for various complex systems. Remanufacturing systems have recently received much attention, because they play significant roles in end-of-life product recovery, environment protection and resource conservation. Disassembly is treated as a critical step in remanufacturing systems. In practice, it is difficult to know the accurate data of end-of-life products such as disassembly time because of their various usage processes, leading to the great difficulty of making effective and reliable decisions. Thus, it is necessary to model the disassembly process with stochastic programming method where the past collected data are fitted into stochastic distributions of parameters by applying big data technology. Additionally, designing and applying highly efficient intelligent optimization algorithms to handle a variety of complex problems in the disassembly process are urgently needed. To achieve the global optimization of disassembling multiple products simultaneously, this work studies a stochastic multi-product disassembly line balancing problem with maximal disassembly profit while meeting disassembly time requirements. Moreover, a chance-constrained programming model is correspondingly formulated, and then, an enhanced group teaching optimization algorithm incorporating a stochastic simulation method is developed by considering this model’s features. Via performing simulation experiments on real-life cases and comparing it with five popularly known approaches, we verify the excellent performance of the designed method in solving the studied problem.

24 August 2020 in IEEE Systems Journal
Verified
Journal Article
Closed access
Yaping FuYaping Fu
Yaping Fu
Hongfeng WangHongfeng Wang
Hongfeng Wang
JWJunwei Wang
Junwei Wang
XPXujin Pu
Xujin Pu
Currently, manufacturing enterprises attach great importance to improving processing quality and customer satisfaction. Hybrid flow shops have widespread applications in real-world manufacturing systems such as steel production and chemical industry. In a practical production process, uncertainty commonly arises due to the difficulty of knowing exact information of facilities and jobs beforehand. In order to improve processing quality and customer satisfaction of manufacturing systems in uncertain environments, this article proposes a stochastic multiobjective hybrid flow shop scheduling problem aiming at maximizing processing quality and minimizing total tardiness, where the processing time of jobs obeys a known random distribution. To describe jobs’ processing quality mathematically, a quality-based cost function is presented, and further a chance-constrained programming approach is used to formulate this problem. Then, a multiobjective artificial bee colony algorithm incorporating a stochastic simulation approach is designed by considering its characteristics. Simulation experiments are performed on a set of instances and several state-of-the-art multiobjective optimization algorithms are chosen as peer approaches. Experiment results confirm that the proposed algorithm has an excellent performance in handling this problem.

26 February 2025 in IEEE Transactions on Emerging Topics in Computational Intelligence
Verified
Journal Article
Closed access
Yaping FuYaping Fu
Yaping Fu
ZZZhengPei Zhang
ZhengPei Zhang
MHMin Huang
Min Huang
XGxiwang guo
xiwang guo
LQLiang Qi
Liang Qi
Currently, supply chain operations face enormous challenges due to complex manufacturing processes and distribution activities. This work proposes a multi-objective integrated energy-efficient scheduling and routing method for a distributed flexible job shop with multiple vehicles to minimize job completion time, total energy consumption, and workload of factories. Firstly, a mixed integer programming model is formulized. Secondly, a knowledge-and-learning-based hyper-heuristic algorithm is developed to solve the model. It innovatively incorporates a Q-learning method to choose a search method from a pool containing genetic algorithm, artificial bee colony optimizer, brain storm optimizer and Jaya algorithm. Furthermore, it embeds problem-specific knowledge into the devised method, aiming to further refine obtained solutions. Finally, the formulated model and proposed algorithm's performance are verified by exact solver CPLEX. The algorithm is further compared with three state-of-the-art optimization approaches. The results confirm its superiority over them in solving the studied problem.