Power plants based on renewable sources offer environmental, technical and economic advantages. Of particular importance is the reduction in greenhouse gas emissions compared to conventional power plants. Despite the advantages, people are often opposed to the construction of these facilities due to their high visual impact, particularly if they are close to places with a great cultural and/or landscape value. This paper proposes a new methodology for identifying the most suitable geographical areas for the construction of new photovoltaic (PV) power plants in zones of special scenic or cultural interest, helping to keep the environment free from the visual intrusions caused by these facilities. From several repeated analyses, the degree of visibility of the new PV plant, the potential observation time of passing visitors, considering the route they follow and their speed, and the increase in visibility of the plants when seen totally or partially with the sky as background, are determined. The result obtained is a map showing the ranking of the geographical areas based on a variable calculated in such analyses: the Global Accumulated Perception Time (GAPT). The application of this methodology can help the different agents involved in the decision-making process for the installation of new PV plant by providing them with an objective visibility criterion.
The construction of new high voltage overhead power lines (HVOPLs) has become a controversial issue for electricity companies due to social opposition. Citizens are concerned about how these power lines may have an impact on their lives, basically caused by their effects on health and safety. Visual impact is one of the most easily perceived. Although there are several published works that deal with the assessment of the visual impact produced by HVOPLs, no methodology has been proposed to assess this impact from an objective perspective. This work presents an original methodology which helps to identify the optimal routes for a new HVOPL under an objective observability criterion, enabling the selection of those with the lowest visibility in a zone. The application of the proposed methodology achieves a set of routes that links new HVOPL origin and destination points creating a corridor which includes all possible routes with an observability of its towers under a threshold limit. This methodology is illustrated by a real-life use corresponding to the selection of the route with least observability for a new power line in La Rioja (Spain). The results obtained may help to achieve a consensus between key stakeholders since it is focused on the specific issues of the planned HVOPL and its observability from an objective perspective.
The evaluation of high-potential areas for integrating distributed resources is mainly dependent on the geographical characterization of resources, consumptions, energy technologies and infrastructures. The effect of distributed resources on electric distribution could be studied by a spatial evaluation of incremental costs. This paper presents a spatial support system (SSS), based on geographical information system (GIS) methodologies, to evaluate the spatial impact caused by integration of distributed power resources on the power distribution network costs.
This paper presents a multiobjective optimization method, using an enumerative procedure for determining the optimal number and the optimal locations of sectionalizing switches and protective devices, in order to achieve the best ENS (Energy Not Supplied) reliability index with minimal investment cost in distribution network systems with several substations (STR). To achieve this, two objective functions are optimized: one defined by an ENS reliability index and the other defined by the economic investment costs. From all the achieved solutions, the non-dominated solutions are selected, which represent the best results for each economic investment. Thus, the planner can utilize a support tool for decision-making regarding investment and installation of sectionalizing switches and protective devices, taking into account the technical and economic limitations imposed by the electric utility.