Zhichao Wang

Dr. Zhichao Wang


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 August 2024 in Water
Verified
Journal Article
Open access
PDF file
YXYang Xia
Yang Xia
YLYue Liu
Yue Liu
ZWZhichao Wang
Zhichao Wang
ZHZhiwen Huang
Zhiwen Huang
WYWensun You
Wensun You
JZJun Zou
Jun Zou
Due to the joint influence of climate change and human activities, the hydrological rhythm of Poyang Lake has changed in recent years, leading to an increasingly severe drought problem during autumn and winter in this region. Notably, the extreme drought that occurred in 2022 had profound impacts on shipping, water supply and the ecological environment of the wetlands in the Poyang Lake Delta, sparking widespread concern. Based on the historical hydrometeorological data of Poyang Lake, we used statistical models (such as Chow test, correlation analysis, etc.) to analyze the cause of the extreme drought in the Poyang Lake Delta from the perspectives of natural factors and human activity. Through correlation analysis, we found that the water level, discharge, and drought duration of the Poyang Lake Delta were all significantly affected by climate change, particularly rainfall in the Poyang Lake basin. Furthermore, combining the results of Chow test and correlation analysis, we also found that the operation of the Three Gorges Reservoir had a notable impact on the water level of the Poyang Lake Delta. Based on remote sensing images, ecological and environmental sampling monitoring, the damage inflicted by the extreme drought event on the Poyang Lake Delta was analyzed. The results show that the inundated area of the delta wetlands in the extreme-drought year (2022) decreased by 45.75% compared with that in a normal year (2017). In addition, the ecological environment of the wetlands deteriorated significantly. The water quality parameters (TN, TP, NH4+-N) increased by 50.2%, 240% and 64.7%, respectively. The concentrations of TN and TP were 3.8 mg/L and 0.17 mg/L, respectively, while the context values in the delta were 1.2 mg/L and 0.075 mg/L. The density and biomass of algae increased by 87.2% and 557.9%, respectively. In contrast, the density and biomass of benthos decreased by 59.9% and 78.5%, respectively. The control strategy for the Poyang Lake Delta under extreme drought was studied through an experiment on the operation of hydraulic controllers. The results show that under extreme drought conditions, the newly built hydraulic controllers could raise the water level of the delta from 9.1 ± 0.7 m to 14.2 ± 1.8 m, thus effectively solving the water cut-off problem in the four branches of the delta. Furthermore, by adjusting the distributive ratio of the main, north, middle and south branches of the delta to 50%, 4%, 24% and 22% through newly built hydraulic controllers, the water area can be increased by 56%.

12 January 2024 in Water
Verified
Journal Article
Open access
PDF file
SDShupan Deng
Shupan Deng
QWQiuqin Wu
Qiuqin Wu
ZWZhichao Wang
Zhichao Wang
LWLonghua Wu
Longhua Wu
ZHZhiwen Huang
Zhiwen Huang
GZGuangming Zhang
Guangming Zhang
The flow of plain-type river-connected lakes is affected by both upstream and downstream rivers, and the hydrological conditions are very complex. Poyang Lake, situated in Jiangxi Province, is the largest river-connected lake in the Yangtze River Basin. Its unique geographical features and complex hydrological conditions have made it a heavy disaster area and a frequent area of floods since ancient times. As typical mitigation measures of Poyang Lake, semi-restoration polder areas and flood storage and detention areas play a crucial role in the flood control of Poyang Lake. Taking Poyang Lake as an example, this article studies the flood characteristics of Poyang Lake based on the measured hydrological data. Furthermore, by using the weir (gate) outflow formula to construct the hydraulic model of semi-restoration polder areas and DHI MIKE to construct the hydrodynamic model of Kangshan flood storage and detention area, the flood diversion capacity of the two, and the flood diversion effect under the super-historical flood in 2020 are analyzed. The results show that compared with the non-use of mitigation measures, the maximum cumulative reduction in Xingzi water level can be reduced by 0.68 m and 0.48 m when semi-restoration polder areas and Kangshan flood storage and detention areas are used alone. Finally, the article puts forward some thoughts and suggestions on the flood control of Poyang Lake. The research results can offer some reference to the flood risk management of plain-type river-connected lakes.

30 July 2020 in Water Supply
Verified
Journal Article
Closed access
PDF file
ZWZhichao Wang
Zhichao Wang
XXXin-Fa Xu
Xin-Fa Xu
ZHZhi-Wen Huang
Zhi-Wen Huang
NWNian-Hua Wu
Nian-Hua Wu
SZSu-Fen Zhou
Su-Fen Zhou
To alleviate the problem that the water level drops more and more seriously in recent years, Jiangxi province proposes to set up regulation gates at each estuaries of Ganjiang river to raise the water level in Nanchang city during the dry season. The operation of this project will raise the upstream water level, which means the sediment transport rate will decrease and lead to deposition problems. In order to find out the deposition area and development trend, we carried out the suspended sediment deposition test on an existing physical model. The study shows that the upstream sediment is mainly deposited in the reaches near the two deltas. Some special topographic features are more likely to cause siltation, such as the wide and deep thalweg and the backflow areas at the downstream of convex banks. After the operation of the project, the erosion trend of the upper reaches of the central and southern branches will change to siltation, and the siltation of the upper reaches of the Western branch will be further strengthened. 15 years later, with the decrease of the upstream sediment intensity, the sediment siltation phenomenon will gradually move to downstream, however this will be a long process.

19 May 2024 in Water
Verified
Journal Article
Open access
PDF file
QWQiuqin Wu
Qiuqin Wu
ZWZhichao Wang
Zhichao Wang
XXXinfa Xu
Xinfa Xu
ZHZhiwen Huang
Zhiwen Huang
TWTianfu Wen
Tianfu Wen
YXYang Xia
Yang Xia
Plain lakes play a crucial role in the hydrological cycle of a watershed, but their interactions with adjacent rivers and downstream water bodies can create complex river–lake relationships, often leading to frequent flooding disasters. Taking Poyang Lake as an example, this paper delves into its interaction with the Yangtze River, revealing the spatiotemporal patterns of flood propagation within the lake and its impact on surrounding flood control measures. The aim is to provide insights for flood management in similar environments worldwide. This study employs a comprehensive approach combining hydrological statistical analysis and two-dimensional hydrodynamic modeling, based on extensive hydrological, topographic, and socio-economic data. The results indicate that the annual maximum outflow from Poyang Lake is primarily controlled by floods within the watershed, while the highest annual lake water level is predominantly influenced by floods from the Yangtze River. The peak discharge typically reaches the lake outlet within 48 h, with the peak water level taking slightly longer at 54 h. However, water storage in the lake can shorten the time that it takes for the peak discharge to arrive. When converging with floods from the Yangtze River, the peak water level may be delayed by up to 10 days, due to the top-supporting interaction. Furthermore, floods from the “Five Rivers” propagate differently within the lake, affecting various lake regions to differing degrees. Notably, floods from the Fu River cause the most significant rise in the lake’s water level under the same flow rate. The top-supporting effect from the Yangtze River also significantly impacts the water surface slope of Poyang Lake. When the Yangtze River flood discharge significantly exceeds that of the “Five Rivers” (i.e., when the top-supporting intensity value, f, exceeds four), the lake surface becomes as flat as a reservoir. During major floods in the watershed, the water level difference in the lake can increase dramatically, potentially creating a “dynamic storage capacity” of up to 840 million cubic meters.

4 June 2024 in Water, Air, & Soil Pollution
Verified
Journal Article
Closed access
PDF file
YXYang Xia
Yang Xia
ZHZhiwen Huang
Zhiwen Huang
ZWZhichao Wang
Zhichao Wang
ZZZhou Sufen Zhou
Zhou Sufen Zhou

12 February 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
SDShupan Deng
Shupan Deng
ZWZhichao Wang
Zhichao Wang
LWLonghua Wu
Longhua Wu
TWTing Wu
Ting Wu
YXYang Xia
Yang Xia
YLYue Liu
Yue Liu
In recent years, flood hazards have occurred increasingly worldwide, posing significant threats to the safety of life and property in lacustrine and riverine environments. To mitigate the devastating impacts of floods, it is crucial to explore optimal strategies for joint flood diversion of flood diversion and storage measures (FDSM). The FDSM management of Poyang Lake in China focuses on studying semi-restoration polder areas (SR Polders) and flood storage and detention areas (FS Detentions), which are subjects of ongoing research. Existing studies primarily focus on SR Polders or FS Detentions, with limited research on the joint flood diversion potential of these two measures, particularly regarding optimal scheduling. This study takes 185 SR Polders and the Kangshan flood storage and detention area (KS Detention) as the primary research objects. By integrating hydraulic theory, numerical simulation techniques, and survey data, we develop a hydraulic model for the SR Polders and a hydrodynamic model for the KS Detention to carry out flood diversion simulation. The 1998 flood is chosen as a typical case to simulate and analyze their flood diversion processes under various schemes. The results indicate that altering the operation criteria for FDSM influences both the maximum diversion discharge and the timing of the main diversion period. For the SR Polders, under the current flood control scheme, raising the operation water level (OWL) of SR Polders-I by 1.0 m increases the maximum diversion discharge by 894 m3/s. Additionally, raising the OWL of SR Polders-II by 0.37 m delays the main diversion period by one day. For the KS Detention, higher flood diversion water levels correspond to greater discharge capacities. Furthermore, a fuzzy optimization method is applied to optimize nine joint schemes of the SR Polders and KS Detention. The results indicate that the optimal joint flood diversion strategy for Poyang Lake is operating SR Polders-I, SR Polders-II, and KS Detention at a Hukou water level of 21.65 m, 22.05 m, and 22.50 m, respectively. Finally, the study provides insights and recommendations for flood control management at Poyang Lake. The results of this study not only have important guiding significance for flood control management of large plain lakes but also provide references for the joint operation of flood diversion and storage areas in other regions.