Yue Liu

Yue Liu


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 August 2024 in Water
Verified
Journal Article
Open access
PDF file
YXYang Xia
Yang Xia
YLYue Liu
Yue Liu
ZWZhichao Wang
Zhichao Wang
ZHZhiwen Huang
Zhiwen Huang
WYWensun You
Wensun You
JZJun Zou
Jun Zou
Due to the joint influence of climate change and human activities, the hydrological rhythm of Poyang Lake has changed in recent years, leading to an increasingly severe drought problem during autumn and winter in this region. Notably, the extreme drought that occurred in 2022 had profound impacts on shipping, water supply and the ecological environment of the wetlands in the Poyang Lake Delta, sparking widespread concern. Based on the historical hydrometeorological data of Poyang Lake, we used statistical models (such as Chow test, correlation analysis, etc.) to analyze the cause of the extreme drought in the Poyang Lake Delta from the perspectives of natural factors and human activity. Through correlation analysis, we found that the water level, discharge, and drought duration of the Poyang Lake Delta were all significantly affected by climate change, particularly rainfall in the Poyang Lake basin. Furthermore, combining the results of Chow test and correlation analysis, we also found that the operation of the Three Gorges Reservoir had a notable impact on the water level of the Poyang Lake Delta. Based on remote sensing images, ecological and environmental sampling monitoring, the damage inflicted by the extreme drought event on the Poyang Lake Delta was analyzed. The results show that the inundated area of the delta wetlands in the extreme-drought year (2022) decreased by 45.75% compared with that in a normal year (2017). In addition, the ecological environment of the wetlands deteriorated significantly. The water quality parameters (TN, TP, NH4+-N) increased by 50.2%, 240% and 64.7%, respectively. The concentrations of TN and TP were 3.8 mg/L and 0.17 mg/L, respectively, while the context values in the delta were 1.2 mg/L and 0.075 mg/L. The density and biomass of algae increased by 87.2% and 557.9%, respectively. In contrast, the density and biomass of benthos decreased by 59.9% and 78.5%, respectively. The control strategy for the Poyang Lake Delta under extreme drought was studied through an experiment on the operation of hydraulic controllers. The results show that under extreme drought conditions, the newly built hydraulic controllers could raise the water level of the delta from 9.1 ± 0.7 m to 14.2 ± 1.8 m, thus effectively solving the water cut-off problem in the four branches of the delta. Furthermore, by adjusting the distributive ratio of the main, north, middle and south branches of the delta to 50%, 4%, 24% and 22% through newly built hydraulic controllers, the water area can be increased by 56%.

12 February 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
SDShupan Deng
Shupan Deng
ZWZhichao Wang
Zhichao Wang
LWLonghua Wu
Longhua Wu
TWTing Wu
Ting Wu
YXYang Xia
Yang Xia
YLYue Liu
Yue Liu
In recent years, flood hazards have occurred increasingly worldwide, posing significant threats to the safety of life and property in lacustrine and riverine environments. To mitigate the devastating impacts of floods, it is crucial to explore optimal strategies for joint flood diversion of flood diversion and storage measures (FDSM). The FDSM management of Poyang Lake in China focuses on studying semi-restoration polder areas (SR Polders) and flood storage and detention areas (FS Detentions), which are subjects of ongoing research. Existing studies primarily focus on SR Polders or FS Detentions, with limited research on the joint flood diversion potential of these two measures, particularly regarding optimal scheduling. This study takes 185 SR Polders and the Kangshan flood storage and detention area (KS Detention) as the primary research objects. By integrating hydraulic theory, numerical simulation techniques, and survey data, we develop a hydraulic model for the SR Polders and a hydrodynamic model for the KS Detention to carry out flood diversion simulation. The 1998 flood is chosen as a typical case to simulate and analyze their flood diversion processes under various schemes. The results indicate that altering the operation criteria for FDSM influences both the maximum diversion discharge and the timing of the main diversion period. For the SR Polders, under the current flood control scheme, raising the operation water level (OWL) of SR Polders-I by 1.0 m increases the maximum diversion discharge by 894 m3/s. Additionally, raising the OWL of SR Polders-II by 0.37 m delays the main diversion period by one day. For the KS Detention, higher flood diversion water levels correspond to greater discharge capacities. Furthermore, a fuzzy optimization method is applied to optimize nine joint schemes of the SR Polders and KS Detention. The results indicate that the optimal joint flood diversion strategy for Poyang Lake is operating SR Polders-I, SR Polders-II, and KS Detention at a Hukou water level of 21.65 m, 22.05 m, and 22.50 m, respectively. Finally, the study provides insights and recommendations for flood control management at Poyang Lake. The results of this study not only have important guiding significance for flood control management of large plain lakes but also provide references for the joint operation of flood diversion and storage areas in other regions.

19 December 2025 in Water
Verified
Journal Article
Open access
PDF file
YXYang Xia
Yang Xia
YLYue Liu
Yue Liu
ZWZhichao Wang
Zhichao Wang
ZHZhiwen Huang
Zhiwen Huang
WYWensun You
Wensun You
TZTaotao Zhang
Taotao Zhang
The problem of low water level and uneven distribution of flow in the multi-branch channels at the tail of the Ganjiang River (GJRT) during the dry season has been affecting the local water supply, navigation, and aquatic ecological environment. In recent years, water conservancy projects have been built in each branch of the multi-branch channels at the GJRT. Finding a way to utilize the water conservancy project group to carry out joint regulation and meet the water level and discharge requirements of each branch is an important issue that urgently needs to be solved. This paper analyzes the hydrodynamic process and its impact on water supply, navigation, and ecology in multi-branch channels without water conservation projects through hydrological data analysis and numerical simulation. By conducting numerical experiments on joint regulation of water conservation project group, a multi-objective regulation strategy is proposed to meet the water level and discharge of each branch. The results indicate that the discharge at the GJRT has been continuously decreasing from 1 September. Due to the jacking effect of Poyang Lake, the water level plunges at the GJRT from 1 October, which occurred later than the decrease in water level. The disruption of water levels and discharge makes it difficult to meet the regional water demand. The optimal time to initiate regulation is 1 October, and the target water level of Waizhou Station is 15.5 m, located upstream of the Ganjiang River tail. When the water level before each branch project gate is uniform and exceeds 15.5 m, the water level of Waizhou Station satisfies the requirement. However, the discharge of each branch does not meet the demand. In contrast to a scheduling regulation strategy that maintains the same water level in front of each gate, adopting a strategy with different water levels before each gate can effectively adjust the diversion ratio and fulfill the discharge demand of each branch at the tail of the Ganjiang River.