Sundeep Inti

Dr. Sundeep Inti


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2017 in Journal of Infrastructure Systems
Verified
Journal Article
Closed access
SISundeep Inti
Sundeep Inti
VTVivek Tandon
Vivek Tandon
Selection and construction of sustainable infrastructure is a complex process due to multicriteria decision requirements. The analytic hierarchy process (AHP) is a widely used multicriteria decision tool in civil engineering applications. However, the chief drawback of AHP is that it requires a large number of inputs (pairwise comparisons), which frequently leads to inconsistency in decision making. The main objective of this study is to reduce the number of inputs in AHP without compromising consistency. This study proposes to modify AHP with the use of the additive transitivity property of fuzzy preference relations because it significantly reduces the number of inputs, which minimizes inconsistency. The effectiveness of the proposed method was verified through a case study for selecting a contractor from six contractors. Inputs were taken from three decision makers for both traditional and proposed AHP, and the rankings obtained by the proposed method were compared with traditional AHP. The comparison revealed the use of a lesser number of inputs in conjunction with additive transitive fuzzy preference relations generated consistent judgments in minimal time.

1 October 2021 in Geotextiles and Geomembranes
Verified
Journal Article
Closed access
SISundeep Inti
Sundeep Inti
VTVivek Tandon
Vivek Tandon

5 August 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
DBDaniel Emmanuel Bernal
Daniel Emmanuel Bernal
Adeeba RaheemAdeeba Raheem
Adeeba Raheem
SISundeep Inti
Sundeep Inti
HWHongjie Wang
Hongjie Wang
As the global transportation sector increasingly adopts electric vehicles, the demand for advanced and accessible charging infrastructure is rising. In addition to at-home electric vehicle (EV) charging, there is a growing need for the swift development of commercial direct current fast charging (DCFC) stations to meet on-the-go EV charging demands. While government funds are available to support the expansion of the EV charging network in the United States, the establishment of a robust nationwide EV charging infrastructure requires significant private sector investment. This study was conducted to assess the economic feasibility of various business models for fast charging stations in the U.S. using two case studies and exploring different operational strategies including sole ownership and collaborative ventures with public and private entities. The results indicate that based on the current adoption and utilization rates in the U.S., the business model involving an owner-operator collaborating with a public partner ensures profitability and protects the investment in DCFC stations from financial losses. The study also highlights that demand charges and electricity retail prices are the factors that affect the profitability of a DCFC station.

2 October 2023 in International Journal of Pavement Research and Technology
Verified
Journal Article
Closed access
PDF file
DRDona Lavanya Ravikumar
Dona Lavanya Ravikumar
SISundeep Inti
Sundeep Inti
VAVeeraragavan Amirthalingam
Veeraragavan Amirthalingam

1 November 2021 in Journal of Cleaner Production
Verified
Journal Article
Closed access
SISundeep Inti
Sundeep Inti
VTVivek Tandon
Vivek Tandon

5 February 2024 in Buildings
Verified
Journal Article
Open access
PDF file
FJFengchang Jiang
Fengchang Jiang
HXHaiyan Sally Xie
Haiyan Sally Xie
SISundeep Inti
Sundeep Inti
RIRaja R. A. Issa
Raja R. A. Issa
VVVenkata Sai Vikas Vanka
Venkata Sai Vikas Vanka
THTianyi Huang
Tianyi Huang
Equipment costs play a critical role in decision making during design and construction, which requires up-to-date information and data. The design of this study incorporates the inputs from the literature review on the influencing factors of equipment costs and major targeted equipment types to enhance decision support for equipment selection, project construction, and maintenance issues. Two traditional cost estimation methods and five machine-learning methods were compared in this study to identify significant attributes related to the predictions of the costs and residual values of each targeted equipment type. The novelty of this study is that the developed method improves prediction accuracy by establishing a comprehensive and well-structured database framework. A comparison of this method with the existing prediction models reveals that the results and the accuracy of multiple regression analysis are improved in the range of (3% to 33.97%) with the use of a modified decision-tree model combined with support vector machines. The major contribution of this research is the design, implementation, and validation of a machine-learning-based modified decision tree with a support vector machine model for improved accuracy and decision support in construction management. Future research should consider the relationship between geographical variations and value changes.