Fushuan Wen

Fushuan Wen


Research Focus & Metrics

Academic Career Length

33Years (1994-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 November 2012 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
ZLZhipeng Liu
Zhipeng Liu
FWFushuan Wen
Fushuan Wen
GLGerard Ledwich
Gerard Ledwich
With the progressive exhaustion of fossil energy and the enhanced awareness of environmental protection, more attention is being paid to electric vehicles (EVs). Inappropriate siting and sizing of EV charging stations could have negative effects on the development of EVs, the layout of the city traffic network, and the convenience of EVs' drivers, and lead to an increase in network losses and a degradation in voltage profiles at some nodes. Given this background, the optimal sites of EV charging stations are first identified by a two-step screening method with environmental factors and service radius of EV charging stations considered. Then, a mathematical model for the optimal sizing of EV charging stations is developed with the minimization of total cost associated with EV charging stations to be planned as the objective function and solved by a modified primal-dual interior point algorithm (MPDIPA). Finally, simulation results of the IEEE 123-node test feeder have demonstrated that the developed model and method cannot only attain the reasonable planning scheme of EV charging stations, but also reduce the network loss and improve the voltage profile.

13 January 2014 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
WYWeifeng Yao
Weifeng Yao
JZJunhua Zhao
Junhua Zhao
FWFushuan Wen
Fushuan Wen
Zhaoyang DongZhaoyang Dong
Zhaoyang Dong
YXYusheng Xue
Yusheng Xue
KMKe Meng
Ke Meng
An elaborately designed integrated power distribution and electric vehicle (EV) charging system will not only reduce the investment and operation cost of the system concerned, but also promote the popularization of environmentally friendly EVs. In this context, a multi-objective collaborative planning strategy is presented to deal with the optimal planning issue in integrated power distribution and EV charging systems. In the developed model, the overall annual cost of investment and energy losses is minimized simultaneously with the maximization of the annual traffic flow captured by fast charging stations (FCSs). Additionally, the user equilibrium based traffic assignment model (UETAM) is integrated to address the maximal traffic flow capturing problem. Subsequently, a decomposition based multi-objective evolutionary algorithm (MOEA/D) is employed to seek the non-dominated solutions, i.e., the Pareto frontier. Finally, collaborative planning results of two coupled distribution and transportation systems are presented to illustrate the performance of the proposed model and solution method.

9 July 2013 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
GWGuibin Wang
Guibin Wang
ZXZhao Xu
Zhao Xu
FWFushuan Wen
Fushuan Wen
KWKit Po Wong
Kit Po Wong
Smart-grid development calls for effective solutions, such as electric vehicles (EVs), to meet the energy and environmental challenges. To facilitate large-scale EV applications, optimal locating and sizing of charging stations in smart grids have become essential. This paper proposes a multiobjective EV charging station planning method which can ensure charging service while reducing power losses and voltage deviations of distribution systems. A battery capacity-constrained EV flow capturing location model is proposed to maximize the EV traffic flow that can be charged given a candidate construction plan of EV charging stations. The data-envelopment analysis method is employed to obtain the final optimal solution. Subsequently, the well-established cross-entropy method is utilized to solve the planning problem. The simulation results have demonstrated the effectiveness of the proposed method based on a case study consisting of a 33-node distribution system and a 25-node traffic network system.

23 September 2011 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
ZLZhipeng Liu
Zhipeng Liu
FWFushuan Wen
Fushuan Wen
GLGerard Ledwich
Gerard Ledwich
Some uncertainties, such as the uncertain output power of a plug-in electric vehicle (PEV) due to its stochastic charging and discharging schedule, that of a wind generation unit due to the stochastic wind speed, and that of a solar generating source due to the stochastic illumination intensity, volatile fuel prices, and future uncertain load growth could lead to some risks in determining the optimal siting and sizing of distributed generators (DGs) in distribution system planning. Given this background, under the chance constrained programming (CCP) framework, a new method is presented to handle these uncertainties in the optimal siting and sizing of DGs. First, a mathematical model of CCP is developed with the minimization of the DGs' investment cost, operating cost, maintenance cost, network loss cost, as well as the capacity adequacy cost as the objective, security limitations as constraints, and the siting and sizing of DGs as optimization variables. Then, a Monte Carlo simulation-embedded genetic-algorithm-based approach is employed to solve the developed CCP model. Finally, the IEEE 37-node test feeder is used to verify the feasibility and effectiveness of the developed model and method, and the test results have demonstrated that the voltage profile and power-supply reliability for customers can be significantly improved and the network loss substantially reduced.

1 February 2001 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
FWFushuan Wen
Fushuan Wen
ADA.K. David
A.K. David
The emerging electricity market behaves more like an oligopoly than a perfectly competitive market due to special features such as, a limited number of producers, large investment size (barrier to entry), transmission constraints, and transmission losses which discourage purchase from distant suppliers. This makes it practicable for only a few independent power suppliers to service a given geographic region and in this imperfect market each power supplier can increase its own profit through strategic bidding. The profit of each supplier is influenced to varying extents by differences in the degree of imperfection of knowledge of rival suppliers. A new framework to build bidding strategies for power suppliers in an electricity market is presented in this paper. It is assumed that each supplier bids a linear supply function, and that the system is dispatched to minimize customer payments. Each supplier chooses the coefficients in the linear supply function to maximize benefits, subject to expectations about how rival suppliers will bid. A stochastic optimization formulation is developed and two methods proposed for describing and solving this problem. A numerical example serves to illustrate the essential features of the approach and the results are used to investigate the potential market power.

20 June 2012 in IEEE Transactions on Industrial Informatics
Verified
Journal Article
Closed access
JZJunHua Zhao
JunHua Zhao
FWFushuan Wen
Fushuan Wen
Zhaoyang DongZhaoyang Dong
Zhaoyang Dong
YXYusheng Xue
Yusheng Xue
KWKit Po Wong
Kit Po Wong
In this paper, an economic dispatch model, which can take into account the uncertainties of plug-in electric vehicles (PEVs) and wind generators, is developed. A simulation based approach is first employed to study the probability distributions of the charge/discharge behaviors of PEVs. The probability distribution of wind power is also derived based on the assumption that the wind speed follows the Rayleigh distribution. The mathematical expectations of the generation costs of wind power and V2G (vehicle to grid) power are then derived analytically. An optimization algorithm is developed based on the well-established particle swarm optimization (PSO) and interior point method to solve the economic dispatch model. The proposed approach is demonstrated by the IEEE 118-bus test system.