Rifat Sonmez

Prof. Dr. Rifat Sonmez


Research Focus & Metrics

Academic Career Length

29Years (1998-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2013 in Journal of Safety Research
Verified
Journal Article
Closed access
SASaman Aminbakhsh
Saman Aminbakhsh
Murat GunduzMurat Gunduz
Murat Gunduz
RSRifat Sonmez
Rifat Sonmez

1 June 2016 in Expert Systems with Applications
Verified
Journal Article
Closed access
SASaman Aminbakhsh
Saman Aminbakhsh
RSRifat Sonmez
Rifat Sonmez

1 December 1998 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
RSRifat Sonmez
Rifat Sonmez
JRJames E. Rowings
James E. Rowings
Construction labor productivity is affected by several factors. Modeling of construction labor productivity could be challenging when effects of multiple factors are considered simultaneously. In this paper a methodology based on the regression and neural network modeling techniques is presented for quantitative evaluation of the impact of multiple factors on productivity. The methodology is applied to develop productivity models for concrete pouring, formwork, and concrete finishing tasks, using data compiled from eight building projects. The predictive behaviors of the models are compared with the previous productivity studies. Model results, advantages of the methodology, and study limitations are discussed.

1 October 2012 in Expert Systems with Applications
Verified
Journal Article
Closed access
RSRifat Sonmez
Rifat Sonmez
ÖBÖnder Halis Bettemir
Önder Halis Bettemir

1 August 2004 in Canadian Journal of Civil Engineering
Verified
Journal Article
Closed access
RSRifat Sonmez
Rifat Sonmez
Conceptual cost estimates play a crucial role in initial project decisions, although scope is not finalized and very limited design information is available during early project stages. In this paper, the advantages and disadvantages of the current conceptual cost estimation methods are discussed and the use of regression, neural network, and range estimation techniques for conceptual cost estimation of building projects are presented. Historical cost data of continuing care retirement community projects were compiled to develop regression and neural network models. Three linear regression models were considered to identify the significant variables affecting project cost. Two neural network models were developed to examine the possible need for nonlinear or interaction terms in the regression model. Prediction intervals were constructed for the regression model to quantify the level of uncertainty for the estimates. Advantages of simultaneous use of regression analysis, neural networks, and range estimation for conceptual cost estimating are discussed.Key words: conceptual cost estimation, regression analysis, neural networks, range estimation.

1 September 2015 in Journal of Management in Engineering
Verified
Journal Article
Closed access
ÖBÖnder Halis Bettemir
Önder Halis Bettemir
RSRifat Sonmez
Rifat Sonmez