Saman Aminbakhsh

Dr. Saman Aminbakhsh

orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2013 in Journal of Safety Research
Verified
Journal Article
Closed access
SASaman Aminbakhsh
Saman Aminbakhsh
Murat GunduzMurat Gunduz
Murat Gunduz
RSRifat Sonmez
Rifat Sonmez

1 June 2016 in Expert Systems with Applications
Verified
Journal Article
Closed access
SASaman Aminbakhsh
Saman Aminbakhsh
RSRifat Sonmez
Rifat Sonmez

1 January 2017 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
SASaman Aminbakhsh
Saman Aminbakhsh
RSRifat Sonmez
Rifat Sonmez
Intensive heuristic and metaheuristic research efforts have focused on the Pareto front optimization of discrete time-cost trade-off problem (DTCTP). However, very little success has been achieved in solving the problem for medium and large-scale projects. This paper presents a new particle swarm optimization method to achieve an advancement in the Pareto front optimization of medium and large-scale construction projects. The proposed Pareto front particle swarm optimizer (PFPSO) is based on a multiobjective optimization environment with novel particle representation, initialization, and position-updating principles that are specifically designed for simultaneous time-cost optimization of large-scale projects. PFPSO brings several benefits for the discrete time-cost optimization, such as an adequate representation of the discrete search space, fast convergence properties, and improved Pareto front optimization capabilities. The computational experiment results reveal that the new particle swarm op...

1 October 2021 in Structures
Verified
Journal Article
Closed access
SASaeid Kazemzadeh Azad
Saeid Kazemzadeh Azad
SASaman Aminbakhsh
Saman Aminbakhsh

1 August 2020 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
RSRifat Sonmez
Rifat Sonmez
SASaman Aminbakhsh
Saman Aminbakhsh
TATankut Atan
Tankut Atan
Despite intensive research efforts that have been devoted to discrete time-cost optimization of construction projects, the current methods have very limited capabilities for solving the problem for real-life–sized projects. This study presents a new activity uncrashing heuristic with noncritical activity rescheduling method to narrow the gap between the research and practice for time-cost optimization. The uncrashing heuristic searches for new solutions by uncrashing the critical activities with the highest cost-slope. This novel feature of the proposed heuristic enables identification and elimination of the dominated solutions during the search procedure. Hence, the heuristic can determine new high-quality solutions based on the nondominated solutions. Furthermore, the proposed noncritical activity rescheduling method of the heuristic decreases the amount of scheduling calculations, and high-quality solutions are achieved within a short CPU time. Results of the computational experiments reveal that the new heuristic outperforms state-of-the-art methods significantly for large-scale single-objective cost minimization and Pareto front optimization problems. Hence, the primary contribution of the paper is a new heuristic method that can successfully achieve high-quality solutions for large-scale discrete time-cost optimization problems.

1 December 2021 in Structures
Verified
Journal Article
Closed access
SASaeid Kazemzadeh Azad
Saeid Kazemzadeh Azad
SASaman Aminbakhsh
Saman Aminbakhsh
SSSamer S.S. Shaban
Samer S.S. Shaban