David Geisler-Moroder

Dr. David Geisler-Moroder

orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 April 2022 in Energy and Buildings
Verified
Journal Article
Open access
ELEleanor Lee
Eleanor Lee
BMBarbara Szybinska Matusiak
Barbara Szybinska Matusiak
DGDavid Geisler-Moroder
David Geisler-Moroder
SSStephen E. Selkowitz
Stephen E. Selkowitz
LHLisa Heschong
Lisa Heschong

15 March 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Martin HauerMartin Hauer
Martin Hauer
SHSascha Hammes
Sascha Hammes
PZPhilipp Zech
Philipp Zech
DGDavid Geisler-Moroder
David Geisler-Moroder
DPDaniel Plörer
Daniel Plörer
RPRainer Pfluger
Rainer Pfluger
In the architecture, engineering, and construction industries, the integration of Building Information Modeling (BIM) has become instrumental in shaping the design and commissioning of smart buildings. At the center of this development is the pursuit of more intelligent, efficient, and sustainable built environments. The emergence of smart buildings equipped with advanced sensor networks and automation systems increasingly requires the implementation of Digital Twins (DT) for the direct coupling of BIM methods for integral building planning, commissioning, and operational monitoring. While simulation tools and methods exist in the design phase of developing advanced controls, their mapping to construction or post-construction models is less well developed. Through systematic, keyword-based literature research on publisher-independent databases, this review paper gives a comprehensive overview of the state of the research on BIM integration of building control systems with a primary focus on combined controls for daylight and artificial lighting systems. The review, supported by a bibliometric literature analysis, highlights major development fields in HVAC controls, failure detection, and fire-detection systems, while the integration of daylight and artificial lighting controls in Digital Twins is still at an early stage of development. In addition to already existing reviews in the context of BIM and Digital planning methods, this review particularly intends to build the necessary knowledge base to further motivate research activities to integrate simulation-based control methods in the BIM planning process and to further close the gap between planning, implementation, and commissioning.

1 June 2010 in Computer Graphics Forum
Verified
Journal Article
Closed access
PDF file
DGDavid Geisler-Moroder
David Geisler-Moroder
ADArne Dür
Arne Dür

29 February 2024 in Building and Environment
Verified
Journal Article
Open access
SHSascha Hammes
Sascha Hammes
DGDavid Geisler-Moroder
David Geisler-Moroder
Martin HauerMartin Hauer
Martin Hauer
JWJohannes Franz Weninger
Johannes Franz Weninger
MOMaximilian Obleitner
Maximilian Obleitner
RPRainer Pfluger
Rainer Pfluger

1 June 2010 in Solar Energy
Verified
Journal Article
Closed access
Stephen WittkopfStephen Wittkopf
Stephen Wittkopf
Lars Oliver GrobeLars Oliver Grobe
Lars Oliver Grobe
DGDavid Geisler-Moroder
David Geisler-Moroder
RCRaphaël Compagnon
Raphaël Compagnon
JKJerome Kaempf
Jerome Kaempf
JSJean-Louis Scartezzini
Jean-Louis Scartezzini

1 June 2016 in Energy Procedia
Verified
Journal Article
Open access
Marie-Claude DuboisMarie-Claude Dubois
Marie-Claude Dubois
Niko GentileNiko Gentile
Niko Gentile
CACláudia Naves David Amorim
Cláudia Naves David Amorim
WOWerner Osterhaus
Werner Osterhaus
SSSophie Stoffer
Sophie Stoffer
ETEino Tetri
Eino Tetri
This article presents some results from a large monitoring campaign performed in 22 buildings around the world as part of International Energy Agency (IEA) Task 50 “Advanced lighting solutions for retrofitting buildings”. This article mainly addresses the work of Subtask D, which aims to demonstrate sound lighting retrofit solutions in a selection of representative, typical Case Studies. In order to evaluate the Case Studies, a monitoring protocol was developed to assess the overall lighting performance taking into consideration: 1) Energy use, 2) Retrofit costs, 3) Photometric assessment, and 4) User assessment. The monitoring was carried out from June 2014 to December 2015 in 22 non-residential buildings in ten countries. This article presents results from selected Case Studies, drawing conclusions regarding retrofit solutions as well as reflecting on methodological procedures for the measurements and data collection. Measured data as well as key conclusions from Subtask D will be summarized in an electronic web and portable sourcebook at the end of the IEA Task 50 (December 2015), which will be freely available through the Internet.Peer reviewe