8 May 2013 in Construction Management and Economics
Verified
Journal Article
Closed access
GJGustav Jansson
Gustav Jansson
HJHelena Johnsson
Helena Johnsson
DEDan Engström
Dan Engström
The practice of reusing processes and technical solutions leads to the formation of product platforms in house building. Product platforms originate from industries employing a make-to-order production strategy, e.g. the automotive industry. To test how the product platform concept is useful in engineer-to-order production strategies, a case study at two Swedish house-builders was made. Key factors that affect platform use in systems buildings were sought. The smaller company operates a supplier-led platform focusing on commonalities in process knowledge. There is less definition of the product itself to allow for distinctiveness in the product offer. The larger company has a decentralized business and operates a client-driven platform with fragmented standardization. Focus is put on creating commonality through defining the product and handling distinctiveness through an iterative design procedure. Product families were not in use at the case study companies. The companies transform standardized platform solutions into project uniqueness by using support methods. Four platform support methods emerged from the case studies: design planning, collaborative design, design optimization, and requirements iteration. The balance between commonality and distinctiveness in the platform is important to attend to in each house-building project. The engineer-to-order production strategy hinders the implementation of a fully parameterized platform. The product platform concept is therefore expanded with support methods to handle distinctiveness, i.e. project uniqueness. The product platform assets: components, processes, relationships and knowledge, are present also in platforms used in systems building.

28 January 2023 in Buildings
Verified
Journal Article
Open access
PDF file
RHRaafat Hussamadin
Raafat Hussamadin
GJGustav Jansson
Gustav Jansson
JMJani Mukkavaara
Jani Mukkavaara
The construction industry has seen an increase in its complexity. This has meant an increased need for time-consuming and costly quality control. Moreover, the construction industry continues to perform detection-based quality controls with little to no focus on prevention. Quality control documentation is a source of information and data that can support the development of construction processes toward prevention. However, current documentations are ambiguous and subjective, so they remain ineffectual. A case study was performed to explore the causes of the ambiguity and subjectivity of traditional quality control documentation, and to analyze the identified project-variable procedure’s transformation into standardized or even automated documentation. Evaluating the traditional quality control’s preparation, inspection, and documentation phases highlighted unique challenges requiring tailored solutions. This study identifies the challenges of inaccurate data creation and data entry, unusable documentation, and inefficient documentation. Therefore, the usefulness of data structuring and process standardization became apparent. Hence, the study explores two solutions: a digitalized quality control system (DQCS) that ensures one accurate structured data entry method, and a centralized unit that prepares the necessary data for quality control inspections, instead of the unique preparation for each project. The results show the benefits of increased accuracy, usability, and efficiency for reliable on-site inspection and documentation.

21 February 2018 in Buildings
Verified
Journal Article
Open access
PDF file
GJGustav Jansson
Gustav Jansson
EVEmma Viklund
Emma Viklund
Thomas OlofssonThomas Olofsson
Thomas Olofsson
Research on platform-based production systems for house-building has focused on production and manufacturing issues. The aim of this research is to explore how the architectural design process contributes to the industrialised house-building industry from the perspective of creative design work. It also aims to describe how constraints affect architectural design work in the engineer-to-order context, when using platform-based production systems. Architects with experience in using platform-based building systems with different degrees of constraints were interviewed regarding creative aspects of the design work. The interviews, together with documents relating to platform constraints, were then analysed from the perspective of artistic and engineering design theories. The results show the benefits and issues of using platform constraints, both with prefabrication of volumetric modules, as well as prefabricated slab and wall elements. The study highlights a major research gap by describing how architectural work, from both the creative artistic and engineering design perspectives, is affected by constraints in the building platform: (1) the architectural design work goes through a series of divergent and convergent processes where the divergent processes are explorative and the convergent processes are solution-oriented; and (2), there is a trade-off between creativity and efficiency in the design work. Open parameters for layout design are key to architectural creativity, while predefinition supports efficiency. The results also provide an understanding of the potential for creativity in artistic and engineering work tasks through different phases in design, and how they are related to constraints in the platform. The main limitation of the research is the number of interviewed architects who had different background experiences of working with different types of platform constraints. More studies are needed to confirm the observations and to understand how creativity and efficiency interact with divergent and convergent design processes.

30 June 2021 in Buildings
Verified
Journal Article
Open access
PDF file
HEHenrik Eriksson
Henrik Eriksson
Marcus SandbergMarcus Sandberg
Marcus Sandberg
GJGustav Jansson
Gustav Jansson
JLJerker Lessing
Jerker Lessing
This study explores how the logic of product modularity could be useful for the design of complete residential building areas. Previous research has noted that product modularity is usually only applicable if a ‘full modularization’ approach is pursued (i.e., an approach with completely defined modules). This is challenging in Engineer To Order production strategies. Therefore, an approach towards partial product modularity is sought instead. In this approach, the modules are lesser defined to allow flexibility following, e.g., architectural design freedom, as well as per project-specific requirements posed in house-building projects. This study identifies nine (9) ‘modules’ which are denominated as functional spaces. By explaining how unique project requirements affect functional spaces, some integral elements of house-building are detailed. By evaluating the functional spaces in regards to the level of predefinition, as well as the level of relationship, their level of modularity is explored. The usefulness of partial modularity for house-building is suggested to be for coordination of design work and support tools that aides design work. This study suggests that partial modularity can be a feasible approach towards modularity without the need for countermeasures in terms of increasing product predefinition.

14 August 2017
Verified
Conference Paper
Closed access
EVEmma Viklund
Emma Viklund
Marcus SandbergMarcus Sandberg
Marcus Sandberg
HLHelena Lidelöw
Helena Lidelöw
GJGustav Jansson
Gustav Jansson
Some of the requirements governing the design of houses are common between projects. This opens up for using modularization based on product commonalities. Though modularization is well known in the manufacturing industry, its use in house-building contexts is less studied. Even more scarce is research focusing on how requirement commonalities between one-of-a-kind products are found and managed in a modularization process. In this research, modularization from a requirements management perspective is empirically explored using a case study approach. Though the studied modularization process can be described as sequential, the process steps are highly interrelated, with overlaps and iterations. Commonalities are found by functional decomposition of the customer’s portfolio projects, tracing technical solutions back to their initial requirements. These are balanced with the customer’s requirements on the product and on the design automation tool. The requirement list is continuously updated based on portfolio analysis and communication of modularization results to the customer.

1 March 2026 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
GJGustav Jansson
Gustav Jansson
DPDjordje Popovic
Djordje Popovic
FEFredrik Elgh
Fredrik Elgh
RKRohith Areth Koroth
Rohith Areth Koroth
Product realisation process in industrialised house building is often characterized with Engineer-to-order production strategy (ETO). In ETO the design phase is a part of every house building project, and it relies on the combination of process predefinitions and product predefinitions. A challenge with the process part, is to identify, allocate, verify and secure requirements throughout the design process. One set of requirements can be traced to Miljöbyggnad, a climate certification system in Sweden, judged from a third-part evaluation of performance for energy, climate, inner and outer environment. Based on indicators the certification has the purpose for house-building companies to reach the goals for a green transition with climate neutral construction processes before 2050. Requirement management becomes a crucial part of the multi-storey housebuilding design phase, where unique layout and other client choices are present in each project. A prerequisite for the systematic requirement management is the definition of underlying information structures. The aim of this study is therefore to identify and describe how information can be structured for systematic management of Miljöbyggnad requirements in an industrialized house building context. In a qualitative study, with two industrialised house building companies, three representative house-building projects where followed, mapped, analysed and identified for analyses. One interesting analysis result from the study was how requirements were broken down along the design phase and how domains could support the work for each house-building project. Practical contribution, in how information standards could support Miljöbyggnad requirements, was identified align with multi-disciplinary roles in the design phase.