Ecler Mamani

Ms. Ecler Mamani

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
DTDelta Salome Tizon
Delta Salome Tizon
EMEcler Mamani
Ecler Mamani
Alain Jorge Espinoza VigilAlain Jorge Espinoza Vigil
Alain Jorge Espinoza Vigil
Construction projects often exceed budgets and deadlines, evidencing the need for collaborative methodologies such as Integrated Project Delivery (IPD) and Building Information Modeling (BIM). This research evaluates their influence on the design stage of residential buildings through a case study in Peru, managed by an SME. The methodology includes: (1) diagnosis of management through documentary review and interviews, (2) proposal of tools based on BIM and IPD, and (3) validation through statistical analysis and a validation matrix. Nine typical problems were identified, such as deficiencies in plans, measurements and budgets, and poor planning. Eight optimization tools were proposed, including NEC4 ECC contracts, Trimble Connect, Revit, Navis-works, contractor integration, ICE Sessions, 3D, 4D, and 5D BIM models. The 3D model showed 0.48 interferences per m2, the 4D facilitated the monitoring of progress, and the 5D optimized costs by 5.28%. The validation process highlighted the NEC4 ECC Contract, the integration of the contractor, and the 3D and 5D BIM models (Revit and Navisworks) as the most effective tools. This study provides evidence on the implementation of BIM and IPD to optimize the management of residential buildings.

17 January 2025 in Preprints.org
Verified
Preprint
Open access
PDF file
DTDelta Salome Tizon
Delta Salome Tizon
EMEcler Mamani
Ecler Mamani
AVAlain J. Espinoza Vigil
Alain J. Espinoza Vigil
Over the years, the construction sector has used traditional methodologies that often fail to meet established budgets and deadlines, making it imperative to adopt collaborative methodologies such as IPD and BIM. This research evaluates the influence of these methodologies in the design stage of residential buildings, through a case study in Peru managed by an SME. The methodology is divided into three parts: first, a diagnosis of traditional management is carried out through documentary review and semi-structured interviews; second, a proposal for improvement is proposed using tools based on BIM and IPD; third, the proposal is validated through statistical analysis and a validation matrix. Nine typical management problems were identified, such as deficiencies in plans, measurements and budgets, and delays due to inadequate planning. Eight optimization tools are suggested, such as the NEC4 ECC Collaborative Contract, ECD, Revit, Navisworks, early integration of the contractor, ICE Sessions, 3D, 4D and 5D BIM models. The 3D model showed 0.48 interferences per m², the 4D model allowed monitoring the progress of the project, and the 5D model allowed a cost optimization of 5.28%. The profitability analysis showed a return on investment of S/ 3.94 per “sol” invested. The validation of the optimization was demonstrated by the Z Test. The validation matrix highlighted the NEC4 ECC Collaborative Contract and the 3D BIM Model as the most effective tools. In this way, the study contributes to closing the knowledge gap regarding the implementation of BIM and IPD to optimize the management of residential buildings.