Lin Gong

Mr. Lin Gong


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 April 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HGHuang Gang
Huang Gang
LGLin Gong
Lin Gong
YZYuhan Zhang
Yuhan Zhang
ZWZhongmei Wang
Zhongmei Wang
SYSonglin Yuan
Songlin Yuan
In the railway industry, the rail is the basic load-bearing structure of railway tracks. The prediction of the remaining useful life (RUL) for rails is important to avoid unexpected system failures and reduce the cost of maintaining the system. However, the existing detection of rail flaws is difficult, the rail deterioration mechanisms are diverse, and the traditional data-driven methods have insufficient feature extraction. This causes low prediction accuracy. With objectives set in relation to the problems outlined above, a rail RUL prediction approach based on a convolutional bidirectional long- and short-term memory neural network with a residual self-attention (CNNBiLSTM-RSA) mechanism is designed. Firstly, the pre-processed vibration data are taken as the input for the convolutional bi-directional long- and short-term memory neural network (CNNBiLSTM) to extract the forward and backward dependencies and features of the rail data. Secondly, the RSA mechanism is introduced in order to obtain the contributions of the features at different moments during the degradation process of the rail. Finally, an end-to-end RUL prediction implementation based on the convolutional bi-directional long- and short-term memory neural network with the residual self-attention mechanism is established. The experiments were carried out using the full life-cycle data of rails collected at the railway site. The results show that the method achieves a higher accuracy in the RUL prediction of rails.