Adam Stawowy

Prof. Dr. Adam Stawowy

orcid

Research Focus & Metrics

Academic Career Length

34Years (1993-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2008 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
ASAdam Stawowy
Adam Stawowy

31 January 2006 in Omega
Verified
Journal Article
Closed access
ASAdam Stawowy
Adam Stawowy

9 November 2023 in Computers & Operations Research
Verified
Journal Article
Closed access
RPRadosław Puka
Radosław Puka
ISIwona Skalna
Iwona Skalna
JDJerzy Duda
Jerzy Duda
ASAdam Stawowy
Adam Stawowy

1 August 2021 in Applied Soft Computing
Verified
Journal Article
Closed access
RPRadosław Puka
Radosław Puka
ISIwona Skalna
Iwona Skalna
ASAdam Stawowy
Adam Stawowy
JDJerzy Duda
Jerzy Duda
MKMarek Karkula
Marek Karkula

1 September 2017 in Archives of Foundry Engineering
Verified
Journal Article
Open access
PDF file
ASAdam Stawowy
Adam Stawowy
JDJerzy Duda
Jerzy Duda
In the paper, we present a coordinated production planning and scheduling problem for three major shops in a typical alloy casting foundry, i.e. a melting shop, molding shop with automatic line and a core shop. The castings, prepared from different metal, have different weight and different number of cores. Although core preparation does not required as strict coordination with molding plan as metal preparation in furnaces, some cores may have limited shelf life, depending on the material used, or at least it is usually not the best organizational practice to prepare them long in advance. Core shop have limited capacity, so the cores for castings that require multiple cores should be prepared earlier. We present a mixed integer programming model for the coordinated production planning and scheduling problem of the shops. Then we propose a simple Lagrangian relaxation heuristic and evolutionary based heuristic to solve the coordinated problem. The applicability of the proposed solution in industrial practice is verified on large instances of the problem with the data simulating actual production parameters in one of the medium size foundry.

1 April 2018 in Electronic Notes in Discrete Mathematics
Verified
Journal Article
Closed access
JDJerzy Duda
Jerzy Duda
ASAdam Stawowy
Adam Stawowy