The adoption of building information modelling (BIM) enables data-driven decision-making for many participants in the construction process. Building authorities are stakeholders that have not yet benefited from data integration using BIM. In many cases, parts of their processes have already improved through digitisation initiatives. Now they are on the threshold of a major digital transformation enabled by the integration of BIM into their processes. This study examines a building permit process based entirely on BIM, developed at the Vienna Building Authority in Austria. In a series of workshops with all important stakeholders, the current building permit process was captured in detail and transferred to a data-driven, BIM-based process. The study shows that the complete capture and digitisation of the building approval process not only enables the automation of traditional processes such as code compliance checks and neighbourhood hearings but also supports the introduction of innovative sub-processes such as a pre-check of BIM models and augmented reality-based hearings with neighbours (in a pilot phase). The results suggest that the developed process not only significantly increases the efficiency and transparency of building permit procedures, but also represents a decisive step towards integrating the authority into the BIM process of a building.
Building information modeling (BIM) relies on well-defined information requirements to ensure data availability, accurate data exchange, and model consistency. The information delivery specification (IDS) schema has emerged as a standard for structuring alphanumeric information requirements in a computer-interpretable manner. However, current practices primarily define these requirements as entity-based property lists in tabular form, which does not fully exploit the capabilities of the IDS. This research aims to bridge this gap by developing an extended tabular structure that aligns with the IDS while retaining the simplicity and familiarity of classic entity-based property lists. Starting from the way that entities and properties are defined in classical tabular form, the structure is flexibly extended to include definitions of attributes, classifications, materials, and relationships. The resulting table is not bound by a strict structure. The inclusion of the new functionality is optional, and its structure can be customized. In addition, keywords and symbols are introduced to allow the definition of complex restrictions on values. The concept is validated through case studies, including the openBIM building permit of the City of Vienna and the Austrian research project AIA4ALL, demonstrating improved precision in the definition of information requirements. The results show that this method facilitates a gradual transition to the adoption of full IDS functionality.
14 July 2024 in Developments in the Built Environment