Christian Schranz

Prof. Dr. Christian Schranz

Civil and Environmental Engineering, TU Wien, Vienna, Wien, Austria
orcid

Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 June 2022 in Frontiers in Built Environment
Verified
Journal Article
Open access
AAAshtarout Ammar
Ashtarout Ammar
Hala NassereddineHala Nassereddine
Hala Nassereddine
NANadine AbdulBaky
Nadine AbdulBaky
AAAnwar AbouKansour
Anwar AbouKansour
JTJuliano Tannoury
Juliano Tannoury
CSChristian Schranz
Christian Schranz
As the notion of data-driven analytics and turning data into action is becoming more salient in the construction industry, researchers and practitioners have recently devoted considerable effort to investigate the digital transformation of the industry. Along this journey, Digital Twin has been introduced to the industry as a concept that holds the promise to challenge the status-quo and address long standing problems of productivity, efficiency, and value. While this concept is becoming more familiar among practitioners, there is a lack of universal definitions of what the Digital Twin of a construction project is. Additionally, while identifying the purpose of Digital Twin is recognized as the first step in implementing Digital Twins, there is little discussion on the perception of construction practitioners of the extent to which Digital Twin can deliver value. To address these research gaps and building on the existing work on Digital Twins in the context of the construction industry, this paper first proposes a definition of the Digital Twin of a construction project. Next, a series of semi-structured interviews are conducted with nine construction practitioners to understand their perceptions on the use and challenges of Digital Twins. Thematic analysis is then used to analyze interview data and summarize Digital Twins applications, capabilities, and challenges. Forty direct applications were identified and grouped into seven capabilities. Digital Twins capabilities of Increase Transparency of Information and Real-Time Monitoring, Analysis, and Feedback were the most discussed with a total of eight applications each, followed by Better Stakeholder Collaboration which had seven applications. The discussion on challenges led to the identification of 34 challenges to implementing Digital Twin, grouped into six categories coded through thematic analysis. The category on Data Understanding, Preparation, and Usage Challenges was found to be the most critical for the interviewees. Additionally, the paper presents a case study on how building authority can be integrated into Digital Twins and leverage its use throughout the lifecycle of a building. Future work can further investigate the challenges and develop prototypes that can help in quantifying the benefits of implementing Digital Twins on a Construction Project.

16 November 2021 in Frontiers in Built Environment
Verified
Journal Article
Open access
MJMahmoud El Jazzar
Mahmoud El Jazzar
CSChristian Schranz
Christian Schranz
HUHarald Urban
Harald Urban
Hala NassereddineHala Nassereddine
Hala Nassereddine
This research explores the current state of Construction 4.0 and discusses a four-layer implementation of Construction 4.0 in the industry. The research methodology consists of an extensive literature review to gain insights about Construction 4.0 and frame the four-layer implementation plan. A case study is also presented to showcase the proposed implementation plan. Nine Construction 4.0 technologies were discussed, their integration throughout the project lifecycle was presented in a roadmap, their integration and connectivity with one another were outlined in an interaction roadmap, and the requirements necessary for achieving the 4.0 transformation were articulated. However, the proposed implementation plan is focused on nine Construction 4.0 technologies. The research presents a comprehensive plan for integrating Construction 4.0 technologies into the industry and serves as a guideline to help construction companies better understand the implications of Construction 4.0.

26 July 2021 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
CSChristian Schranz
Christian Schranz
HUHarald Urban
Harald Urban
AGAlexander Gerger
Alexander Gerger
The digital transformation in the construction industry, which is also referred to as Construction 4.0, is gaining impact in recent years. BIM as the central point for model-based planning and communication is at the centre of this development. This paves the way for the implementation of further technologies, such as augmented reality (AR) or artificial intelligence (AI) in the construction process. However, the submission process currently receives little attention in the BIM project cycle, even though it has a significant impact on a building project. There is a huge potential for the application of BIM and AR in the building submission process. BIM allows partly automatic compliance checks to be performed. The BIM model and the results of these checks can be used as basis for the AR model. This paper investigates an application for AR in a BIM submission process. Here we show that especially the plan check process and hearings in the approval process can be improved and sped up by combining BIM and the visualization technology of AR. In this process, AR can support the building authority in checking the compliance with building regulations. Additionally, non-experts involved often have problems grasping the planned building project just based on the technical 2D plans. In this case, AR helps them to visualise the impact of the planned project and allows for better judgement. Use-cases are presented, showing strategies to improve the plan check process and assist the building authority as well as the persons involved, for both experts as well as non-experts. Finally, the requirements, technical implementations, and effects of an AR application for the plan check process are described. An AR-supported plan checking process can vastly improve the presentation of technical content. This leads to better understanding and more transparency for non-experts. Because AR is relatively easy to use, it might become ubiquitous not only to experts, but also to the general public.

22 March 2022 in Buildings
Verified
Journal Article
Open access
PDF file
HUHarald Urban
Harald Urban
GPGabriel Pelikan
Gabriel Pelikan
CSChristian Schranz
Christian Schranz
Augmented Reality (AR) is a Construction 4.0 technology that is seen as a site-extension of Building Information Modelling (BIM). In addition to the practical aspect within the design and construction processes AR can be used to support teaching through visualizations and interaction. This article presents a new AR platform called “AR-supported Teaching”, applicable for both Architecture, Engineering and Construction (AEC) education and as a Construction 4.0 technology. The aim of this project is to increase the amount of AEC AR content available for education and to introduce students to the productive use of AR. During its development, special attention was paid to the needs of the AEC industry. Users can employ BIM models to create AR scenes before adding animations and annotations without requiring programming skills. The AR platform enables interaction with remote experts and is therefore also suitable for distance learning. In a pilot study, use cases were defined and students tested the usability of the applications. The results were positive and additional suggestions for improvement were made. The feedback and motivation of the students indicate that AR has a future in education, especially if enough AEC AR content and practical use cases are available. The latter also concerns the application of AR in AEC practice.

21 September 2023 in Automation in Construction
Verified
Journal Article
Open access
SFSimon Fischer
Simon Fischer
CSChristian Schranz
Christian Schranz
HUHarald Urban
Harald Urban
DPDaniel Pfeiffer
Daniel Pfeiffer

1 February 2006 in Computer Methods in Applied Mechanics and Engineering
Verified
Journal Article
Closed access
HMHerbert A. Mang
Herbert A. Mang
CSChristian Schranz
Christian Schranz
PMPeter Mackenzie-Helnwein
Peter Mackenzie-Helnwein