Although the probability of a rollover accident is lower than that of other forms of collision, rollover is a serious accident that can break the symmetry of the vehicle and cause serious loss of life and property. There are many factors affecting rollovers, such as the environment, the vehicle, and the driving control. A coach comprises a complex dynamic system; as such, the accuracy and rationality of the used mathematical model are decisive in the study of coach rollover warning and control. By analogy with the modeling method of an automobile collision accident, the general process of a coach rollover accident is analyzed in this study in combination with the contact form and freedom of motion characteristic of the coach body and external environment. According to the principle of conservation of energy, the mathematical models of critical rollover impact force in a collision between vehicles and obstacles and in a collision between two vehicles are established, allowing for analysis of the relationships between the critical tripped rollover impact forces required for a 90° rollover and the continuous action time and collision point height. During the collision between the vehicle and the obstacle, the occurrence of a vehicle rollover is related not only to the impact force in the collision process but also to the collision duration time. Even if the impact force is relatively small, the collision lasts long enough that a second collision may occur until the vehicle rolls over. In the process of a two-vehicle collision, the critical rollover impact force is not only related to the vehicle mass but also to the vehicle wheelbase and the height of the collision point. Based on the law of conservation of momentum, the mathematic models of 90-degree rollover and 180-degree rollover are established, and the critical rollover velocities are calculated. The purpose of this study is to provide reference and guidance for the research methods of vehicle rollover stability and anti-rollover control in the intelligent vehicle era.
With the development of steel-structure construction technology in high-rise buildings, the design and construction of high-rise steel structures tend to be complicated. Based on the Zhuhai Tiejian Square project, the fluid-structure coupling calculation analysis and on-site monitoring are carried out in view of the wind load of the high-altitude steel-structure connecting bridge in the hoisting stage of the Zhuhai Tiejian Square project. The main structure of the project is four towers and five high-altitude, small-spacing steel structures connecting the four towers. The lifting process of the third zone is taken as the analysis object, and the hoisting idea of “low-altitude hoisting, overall lifting” is adopted. Because the span of the high-altitude steel-structure connecting bridge is small and the installation height is high, the influence of wind load on the hoisting process cannot be ignored. Therefore, the unidirectional fluid-structure coupling model of the high-altitude small-space steel-structure connecting bridge in the third zone was established by using CFD calculation software ANSYS Fluent 2022 R1, and the corresponding flow field and solid calculation results were obtained and analyzed. The analysis results show that the lifting structure still produces a certain deformation when the wind speed is 5 m/s or 10 m/s, and the calculation results show that the stress calculation results are still within the safe range of steel strength for the sensitivity of the lifting structure under wind load. With the increase of wind speed, the local maximum stress of the structure increases greatly, but the overall deformation remains stable, which indicates that the greatest challenge of hoisting steel structures under wind load may be the stability direction rather than the strength, so it is necessary to strictly monitor the displacement deformation of the structure during construction. Then, through the monitoring of the overall lifting process of the high-altitude, large-span, steel-connected structure of Zhuhai Tiejian Square from pre-lifting to formal lifting, real-time monitoring and data analysis show that the lifting process of the high-altitude steel bridge of Zhuhai Tiejian Square is safe and reliable, the force transformation of each component is reasonable, the lifting process is relatively stable, the external environment has little impact, and the expected monitoring effect has been achieved. The calculation simulation and on-site monitoring in this paper can provide theoretical and practical guidance for the construction safety under the influence of wind load in the construction process of high-altitude steel-structure hoisting, and provide an important reference value for similar projects.
This study focuses on the East Channel Project (Xiang’an South Road—Airport Expressway Section). The project is in the South Port Harbor Bay area. The area has highly complex and asymmetrical geology. Construction faces multiple challenges: tight schedule, overlapping pipeline operations, and large-scale foundation treatment needs. To tackle these, the project uses the plastic drainage board surcharge preloading method for ground improvement. This technique needs continuous settlement deformation monitoring. The monitoring aims to spot potential asymmetric trends and fix the best unloading time. Traditional settlement prediction methods have limits. So, this study develops an intelligent prediction model (SSA-BP). It combines the Sparrow Search Algorithm (SSA) with the BP neural network. The model uses SSA’s strong global search ability to optimize the BP network’s initial weights and thresholds. This effectively avoids local minima and improves prediction stability. Comparative experiments with other optimization algorithms (Particle Swarm Optimization PSO, Grey Wolf Optimizer GWO, and Differential Evolution DE) show that the SSA-BP model has better convergence accuracy and robustness. Field monitoring data validation indicates the model’s prediction error is stably between −3.4% and 3.2%. It surpasses traditional methods like the three-point and hyperbolic methods. The study’s key innovation is introducing an asymmetry-aware view. It analyzes settlement’s morphological evolution and predictability under surcharge preloading. The SSA-BP model can identify both symmetric and asymmetric deformation patterns well. It offers a new computational tool to understand asymmetry breaking in geotechnical systems. Moreover, the model can accurately predict settlement behavior in real time. This provides dynamic construction decision-making guidance and effective cost control. This research shows that intelligent algorithms have great potential. They can reveal complex geotechnical systems’ inherent laws and promote foundation engineering’s intelligentization.