Petteri Halli

Dr. Petteri Halli

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2017 in Journal of Cleaner Production
Verified
Journal Article
Closed access
PHPetteri Halli
Petteri Halli
JHJoseph Hamuyuni
Joseph Hamuyuni
HRHannu Revitzer
Hannu Revitzer
MLMari Lundström
Mari Lundström

1 August 2018 in Minerals Engineering
Verified
Journal Article
Closed access
PHPetteri Halli
Petteri Halli
JHJoseph Hamuyuni
Joseph Hamuyuni
MLMaria Leikola
Maria Leikola
MLMari Lundström
Mari Lundström

1 April 2020 in Separation and Purification Technology
Verified
Journal Article
Open access
PHPetteri Halli
Petteri Halli
VAVivek Agarwal
Vivek Agarwal
JPJere Partinen
Jere Partinen
MLMari Lundström
Mari Lundström

1 June 2018 in Journal of Cleaner Production
Verified
Journal Article
Open access
IKIvan Korolev
Ivan Korolev
PAPelin Altınkaya
Pelin Altınkaya
PHPetteri Halli
Petteri Halli
PHPyry-Mikko Hannula
Pyry-Mikko Hannula
KYKirsi Yliniemi
Kirsi Yliniemi
MLMari Lundström
Mari Lundström

20 September 2018 in ACS Sustainable Chemistry & Engineering
Verified
Journal Article
Open access
PHPetteri Halli
Petteri Halli
JHJoonas J. Heikkinen
Joonas J. Heikkinen
HEHeini Elomaa
Heini Elomaa
Benjamin WilsonBenjamin Wilson
Benjamin Wilson
VJVille Jokinen
Ville Jokinen
MLMari Lundström
Mari Lundström
In the current study, platinum - present as a negligible component (below 1 ppb, the detection limit of the HR-ICP-MS at the dilutions used) in real industrial hydrometallurgical process solutions was recovered by an electrodeposition − redox replacement (EDRR) method on pyrolysed carbon (PyC) electrode, a method not earlier applied to metal recovery. The recovery parameters of the EDRR process were initially investigated using a synthetic nickel electrolyte solution ([Ni] = 60 g/L, [Ag] = 10 ppm, [Pt] = 20 ppm, [H2SO4] = 10 g/L) and the results demonstrated an extraordinary increase of 3·105 in the [Pt]/[Ni] on the electrode surface cf. synthetic solution. EDRR recovery of platinum on PyC was also tested with two real industrial process solutions that contained a complex multi-metal solution matrix: Ni as the major component (>140 g/L) and very low contents of Pt, Pd and Ag (i.e. <1 ppb, 117 ppb and 4 ppb, respectively). The selectivity of Pt recovery by EDRR on the PyC electrode was found to be significant – nanoparticles deposited on the electrode surface comprised on average of 90 wt-% platinum and a [Pt]/[Ni] enrichment ratio of 1011 compared to the industrial hydrometallurgical solution. Furthermore, other precious metallic elements like Pd and Ag could also be enriched on the PyC electrode surface using the same methodology. This paper demonstrates a remarkable advance-ment in the recovery of trace amounts of platinum from real industrial solutions that are not currently considered as a source of Pt metal.

8 November 2019 in Journal of Applied Electrochemistry
Verified
Journal Article
Open access
PDF file
PHPetteri Halli
Petteri Halli
Benjamin WilsonBenjamin Wilson
Benjamin Wilson
THTaye Hailemariam
Taye Hailemariam
PLPetri Latostenmaa
Petri Latostenmaa
KYKirsi Yliniemi
Kirsi Yliniemi
MLMari Lundström
Mari Lundström
The current study outlines the electrochemical recovery of tellurium from a metallurgical plant waste fraction, namely Doré slag. In the precious metals plant, tellurium is enriched to the TROF (Tilting, Rotating Oxy Fuel) furnace slag and is therefore considered to be a lost resource—although the slag itself still contains a recoverable amount of tellurium. To recover Te, the slag is first leached in aqua regia, to produce multimetal pregnant leach solution (PLS) with 421 ppm of Te and dominating dissolved elements Na, Ba, Bi, Cu, As, B, Fe and Pb (in the range of 1.4–6.4 g dm−3), as well as trace elements at the ppb to ppm scale. The exposure of slag to chloride-rich solution enables the formation of cuprous chloride complex and consequently, a decrease in the reduction potential of elemental copper. This allows improved selectivity in electrochemical recovery of Te. The results suggest that electrowinning (EW) is a preferred Te recovery method at concentrations above 300 ppm, whereas at lower concentrations EDRR is favoured. The purity of recovered tellurium is investigated with SEM–EDS (scanning electron microscope–energy dispersion spectroscopy). Based on the study, a new, combined two-stage electrochemical recovery process of tellurium from Doré slag PLS is proposed: EW followed by EDRR. Graphic