Edward Godfrey Ochieng

Prof. Edward Godfrey Ochieng


Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 March 2017 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
BMBekithemba Mpofu
Bekithemba Mpofu
Edward Godfrey OchiengEdward Godfrey Ochieng
Edward Godfrey Ochieng
CMCletus Moobela
Cletus Moobela
APAdriaan Pretorius
Adriaan Pretorius
Purpose: A voluminous amount of research has been conducted on project delay in the recent past; however, the persistence of the problem demands that a relentless quest for solutions is upheld. It can be argued that the problem is likely to be more pronounced in areas where development pressure is the highest. One such area is the United Arab Emirates (UAE) where the construction industry is said to have reached an unparalleled position in the last decade. The purpose of this paper is to identify the most significant causes of delays in the UAE construction industry. Design/methodology/approach: A survey was conducted targeting three key types of stakeholders, namely clients, contractors and consultants. Validity and reliability were achieved by first assessing the plausibility of construction delay variables in UAE. The verification took place after the interpretation of quantitative data, this involved presenting the findings to the main participants. The validation took place after the verification process. Rigour was achieved by engaging participants previously engaged in UAE and focussing on verification and validation, this included responsiveness of the researchers during group discussions, methodological coherence, appropriate sampling frame and data analysis. Findings: From the analysis, the study unveiled a number of important causes of construction delays in the UAE, ranging from unrealistic contract durations to poor labour productivity, with consultants and clients seemingly shouldering the bulk of the “blame game”. It was evident that all the three main stakeholders in a construction project (clients, consultants and contractors) need to change their existing practices in order to ensure timely delivery of projects. The research also confirms that delays are country specific and appear to be time related hence they should be viewed within the social, economic and cultural settings of the UAE. Research limitations/implications: A major limitation of the current study was the use of a single approach to facilitate data collection. Practical implications: It was evident that practitioners need to change their existing practices in order to ensure timely delivery of projects. Continuous coordination and relationship between practitioners are required through the project life cycle in order to solve problems and develop project performance. Originality/value: As suggested in this study methods should be put in place to reduce long and bureaucratic processes within the client’s organisations, not only to fulfil the requirements of the contract but also to suite fast-track projects.

1 January 2012 in Construction Management and Economics
Verified
Journal Article
Closed access
XRXiming Ruan
Ximing Ruan
Edward Godfrey OchiengEdward Godfrey Ochieng
Edward Godfrey Ochieng
APAndrew D.F. Price
Andrew D.F. Price
CECharles O. Egbu
Charles O. Egbu
Research on knowledge integration across organizational boundaries is still very limited because of the assumption that knowledge is a critical asset, which should be secured within organizational boundaries. A variety of knowledge management frameworks have presented the same common characteristics, including information sharing as the basis for knowledge management, a supportive culture, trust and proximity. Social network analysis is used to examine the knowledge integration process in collaborative and competitive working systems on four case study projects based on public sector organizations. This involved shadowing participants and conducting interviews. Participants were selected from a set of functional teams according to their role. Five participants were interviewed from each project in order to check the validity and reliability of the data. The knowledge integration patterns are presented by quantitative methods using the social network analysis approach.

15 November 2022 in Building Research & Information
Verified
Journal Article
Closed access
Tarila ZuofaTarila Zuofa
Tarila Zuofa
Edward Godfrey OchiengEdward Godfrey Ochieng
Edward Godfrey Ochieng
IOInalegwu Ode-Ichakpa
Inalegwu Ode-Ichakpa
Recent global-wide events including the COVID-19 pandemic have triggered further concerns for construction organizations and policy makers to rethink their resource utilization particularly as most nations gradually return to normalcy. Thus, the primary aim of this study was to appraise the current barriers and drivers of circular economy (CE) concept implementation among construction small and medium-sized enterprises (SMEs) in developing countries. Focus groups were used to answer the overarching question on the determinants influencing CE implementation within construction SMEs. The focus groups revealed a wealth of CE practice detailed information and insights into emerging CE research themes. The study found that the CE concept makes strong arguments for achieving value in economies by reusing, repairing and recycling of constrained resources during operational activities especially within the built environment. Moreover, the findings of this study provide a basis for the research community and practitioners to recognize how various determinants can be coalesced to influence CE adoption and to potentially yield sustainably organizationally valued outputs.

11 September 2024 in Technology in Society
Verified
Journal Article
Closed access
Edward Godfrey OchiengEdward Godfrey Ochieng
Edward Godfrey Ochieng
DODiana Ominde
Diana Ominde
TZTarila Zuofa
Tarila Zuofa

2 November 2015 in Production Planning & Control
Verified
Journal Article
Open access
Edward Godfrey OchiengEdward Godfrey Ochieng
Edward Godfrey Ochieng
APAndrew David Freeman Price
Andrew David Freeman Price
Tarila ZuofaTarila Zuofa
Tarila Zuofa
CECharles Egbu
Charles Egbu
XRXiming Ruan
Ximing Ruan
This study sought to examine project delivery challenges currently being faced by energy clients and to determine how they could achieve value creation through better alignment of project delivery processes. There are important lessons to be learned from the energy sector on how to deal with the unique operational and project challenges. Four exploratory focus groups were held with twenty senior project management practitioners, to better understand the greatest needs and project management processes in the energy sector. A formal deductive approach was used to examine and evaluate existing and future energy project delivery processes. From the qualitative data, participants recognised the need to introduce science-based project techniques such as system dynamics and project predictive analytics in project management processes. Participants further noted that comprehensive innovative project delivery processes and analytical approaches are required to cope with the increasing scale and complexity of energy capital projects.

12 June 2018 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
AAAmbisisi Ambituuni
Ambisisi Ambituuni
Edward Godfrey OchiengEdward Godfrey Ochieng
Edward Godfrey Ochieng
JAJaime M. Amezaga
Jaime M. Amezaga
The failure of safety critical petroleum assets (SCPA) is often accompanied by devastating safety consequences. The conceptualization, design, and construction of SCPA need to integrate factors that will maintain the asset's lifecycle integrity. In this paper, a risk-based assessment of a case petroleum pipeline asset in Nigeria was used to examine the project conceptualization phase of an asset. The paper adopts a case study method, semistructured interviews, and field observations, and drew on pipeline failure data. Key managerial issues that need to be considered in project conceptualization for SCPA were identified. These issues include consideration for risk receptors and the need to assess organizational capabilities with respect to owning, operating, and regulating SCPA. This paper contributes theoretically by providing a performance-based learning framework for the conceptualization of new SCPA.