Cletus Moobela

Cletus Moobela

Auto-generated profile, based on publicly available information

Cletus Moobela

School of Computing, Engineering and the Built Environment, Edinburgh Napier University, Edinburgh, UK

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 March 2017 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
BMBekithemba Mpofu
Bekithemba Mpofu
Edward Godfrey OchiengEdward Godfrey Ochieng
Edward Godfrey Ochieng
CMCletus Moobela
Cletus Moobela
APAdriaan Pretorius
Adriaan Pretorius
Purpose: A voluminous amount of research has been conducted on project delay in the recent past; however, the persistence of the problem demands that a relentless quest for solutions is upheld. It can be argued that the problem is likely to be more pronounced in areas where development pressure is the highest. One such area is the United Arab Emirates (UAE) where the construction industry is said to have reached an unparalleled position in the last decade. The purpose of this paper is to identify the most significant causes of delays in the UAE construction industry. Design/methodology/approach: A survey was conducted targeting three key types of stakeholders, namely clients, contractors and consultants. Validity and reliability were achieved by first assessing the plausibility of construction delay variables in UAE. The verification took place after the interpretation of quantitative data, this involved presenting the findings to the main participants. The validation took place after the verification process. Rigour was achieved by engaging participants previously engaged in UAE and focussing on verification and validation, this included responsiveness of the researchers during group discussions, methodological coherence, appropriate sampling frame and data analysis. Findings: From the analysis, the study unveiled a number of important causes of construction delays in the UAE, ranging from unrealistic contract durations to poor labour productivity, with consultants and clients seemingly shouldering the bulk of the “blame game”. It was evident that all the three main stakeholders in a construction project (clients, consultants and contractors) need to change their existing practices in order to ensure timely delivery of projects. The research also confirms that delays are country specific and appear to be time related hence they should be viewed within the social, economic and cultural settings of the UAE. Research limitations/implications: A major limitation of the current study was the use of a single approach to facilitate data collection. Practical implications: It was evident that practitioners need to change their existing practices in order to ensure timely delivery of projects. Continuous coordination and relationship between practitioners are required through the project life cycle in order to solve problems and develop project performance. Originality/value: As suggested in this study methods should be put in place to reduce long and bureaucratic processes within the client’s organisations, not only to fulfil the requirements of the contract but also to suite fast-track projects.

1 October 2019 in Landscape and Urban Planning
Verified
Journal Article
Open access
JWJ.B. Williams
J.B. Williams
RJR. Jose
R. Jose
CMC. Moobela
C. Moobela
DHDavid Hutchinson
David Hutchinson
RWR. Wise
R. Wise
MGMark Gaterell
Mark Gaterell

1 December 2013 in Computers in Industry
Verified
Journal Article
Closed access
LMLamine Mahdjoubi
Lamine Mahdjoubi
CMCletus Moobela
Cletus Moobela
RLRichard Laing
Richard Laing

1 January 2007 in The International Journal of Environmental, Cultural, Economic, and Social Sustainability: Annual Review
Verified
Journal Article
Closed access
HCHerb Castillo
Herb Castillo
CMCletus Moobela
Cletus Moobela
APAndrew D. F. Price
Andrew D. F. Price
VMVivek Narain Mathur
Vivek Narain Mathur

1 January 2014 in Computer-Aided Civil and Infrastructure Engineering
Verified
Journal Article
Open access
PDF file
Lamine MahdjoubiLamine Mahdjoubi
Lamine Mahdjoubi
JKJing Hao Koh
Jing Hao Koh
CMCletus Moobela
Cletus Moobela

23 January 2023 in Journal of Property Investment & Finance
Verified
Journal Article
Closed access
BMBekithemba Mpofu
Bekithemba Mpofu
CMCletus Moobela
Cletus Moobela
PSPrisca Simbanegavi
Prisca Simbanegavi
Purpose: This research aims to ascertain the extent to which the coronavirus disease 2019 (COVID-19) epidemic affected the relationship between inflation and real estate investment trusts (REITs) returns in South Africa.Design/methodology/approach: This research used the Johansen cointegration test and effective test in establishing if there is a long-run cointegrating equation between the variables. To ascertain if COVID-19 resulted in a different relationship regime between inflation and REITs returns, the sequential Bai–Perron method was used.Findings: Between December 2013 and July 2022, there was no evidence of a long-run relationship between inflation and REITs returns, and a restricted vector autoregressive (VAR) model with a period lag for each variable best describing the relationship. Using the sequential Bai–Perron method, for one break, the results show February 2020 as a structural break in the relationship. A cointegrating equation is also found for the period before the structural break and another after the break. Interestingly, the relationship is negative before the break and a new positive relationship (regime) is confirmed after the noted break.Practical implications: This research helps REITs stakeholders to position themselves in light of any changes to macroeconomic activity within South Africa.Originality/value: This is one of the first studies to test inflation relationship with REITs returns in South Africa and the effects of COVID-19 thereof. This research helps REITs stakeholders to position themselves in light of any changes to macroeconomic activity within South Africa.