Hamed Olfat

Dr. Hamed Olfat

ePlan Team Lead, Centre for SDIs and Land Administration, The University of Melbourne, Parkville, VIC 3010, Australia
orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
Verified
Journal Article
Open access
PDF file
Hamed OlfatHamed Olfat
Hamed Olfat
Behnam AtazadehBehnam Atazadeh
Behnam Atazadeh
DSDavood Shojaei
Davood Shojaei
 Abbas  Rajabifard Abbas Rajabifard
Abbas Rajabifard
Cities are facing dramatic challenges due to population growth and the massive development of high-rises and complex structures, both above and below the ground surface. Decision-makers require access to an efficient land and property information system, which is digital, three-dimensional (3D), spatially accurate, and dynamic containing interests in land (rights, restrictions and responsibilities—RRRs) to manage the legal and physical complexities of urban environments. However, at present, building subdivision workflows only support the two-dimensional (2D) building subdivision plans in PDF or image formats. These workflows result in a number of issues, such as the plan preparation being complex, the examination process being labor intensive and requiring technical expertise, information not being easily reusable by all subdivision stakeholders, queries, analyses, and decision-making being inefficient, and the RRRs interpretation being difficult. The aim of this research is to explore the potential of using Building Information Modelling (BIM) and its open standards to support the building subdivision workflows. The research that is presented in this paper proposes a BIM-driven building subdivision workflow, evaluated through a case study in the state of Victoria, Australia. The results of the study confirmed that the proposed workflow could provide a feasible integrated mechanism for stakeholders to share, document, visualize, analyze, interpret, and reuse 3D digital cadastral data over the lifespan of a building subdivision project.

3 July 2021 in Geo-spatial Information Science
Verified
Journal Article
Open access
Behnam AtazadehBehnam Atazadeh
Behnam Atazadeh
LMLeila Halalkhor Mirkalaei
Leila Halalkhor Mirkalaei
Hamed OlfatHamed Olfat
Hamed Olfat
 Abbas  Rajabifard Abbas Rajabifard
Abbas Rajabifard
DSDavood Shojaei
Davood Shojaei
Cadastral surveying plays an important role in defining legal boundaries of land and property. The current practice for recording cadastral survey data mainly relies on 2D digital or analog documents. This practice is efficient for simple land parcels but can be challenged in complex building developments. To address the issues stemmed from 2D methods of representing cadastral survey data, 3D spatial information models can be considered as a viable solution for managing cadastral survey data. Building Information Modeling (BIM) enables colsslaborative 3D management of the design, construction, and operation of buildings. There have been extensive studies conducted to investigate the connectivity between BIM and 3D cadaster. Most of these studies focus on managing legal information, such as ownership boundaries and attributes, in BIM-based environments. However, there is limited investigation on how surveying measurements can be mapped into BIM. In this study, the proposed method for integrating the cadastral survey data into the BIM environment includes identifying cadastral survey requirements, using BIM entities relevant to cadastral survey data, enrichment of a BIM prototype, and evaluation of the prototype. The major contribution of this study is to demonstrate the storage of cadastral survey data such as survey marks and traverse lines in the BIM environment. Therefore, this research contributes to the further enrichment of BIM with incorporating data elements related to cadastral surveying practices. It is confirmed that current BIM-based tools provide restricted capabilities for explicit management and visualization of cadastral survey data. This limitation can be addressed in the future enhancements of BIM in terms of supporting important elements for cadastral survey data.

Verified
Journal Article
Open access
PDF file
DSDavood Shojaei
Davood Shojaei
Hamed OlfatHamed Olfat
Hamed Olfat
 Abbas  Rajabifard Abbas Rajabifard
Abbas Rajabifard
MBMark Briffa
Mark Briffa
The massive property development of high-rises and complex structures above and below the ground surface in cities indicates the lack of land and high demand to use spaces. However, the existing land and property administration systems are mainly two dimensional and not capable of efficiently managing these complex spaces. As ownership rights on plans are recorded in paper or PDF, understanding these rights and making effective decisions and analyses can be difficult without having experience in the art of reading and interpreting plan information. This paper attempts to address these issues by presenting a prototype for visualizing three-dimensional land and property information. The aim of this prototype is to illustrate and communicate the requirements and benefits of a 3D digital cadastre platform. The prototype is a web-based application and includes functionality to display both legal and physical data, interact with 3D models, display administrative data, identify objects and search objects, visualize cross-sections, and undertake measurements in 3D. For this prototype, a multi-story building was selected as a case study and its 3D model was imported into the prototype to display ownership rights. The prototype was then evaluated by various stakeholders and their feedback was considered for future enhancement.

16 June 2021 in Land
Verified
Journal Article
Open access
PDF file
Hamed OlfatHamed Olfat
Hamed Olfat
Behnam AtazadehBehnam Atazadeh
Behnam Atazadeh
FBFarshad Badiee
Farshad Badiee
Yiqun ChenYiqun Chen
Yiqun Chen
DSDavood Shojaei
Davood Shojaei
 Abbas  Rajabifard Abbas Rajabifard
Abbas Rajabifard
In urban areas, managing the lifecycle of land and property data related to interlocked and intertwined structures and infrastructure services is a grand challenge for cadastral systems. Addressing the physical and legal complexities of vertically stratified ownership arrangements is a major step towards the modernization of cadastral systems. The research problem that this study addresses is the lack of a simplified and effective approach for modelling, storing, visualizing, and querying 3D cadastral data for multi-story buildings. This research primarily leads to the development of an approach based on Building Information Modelling (BIM), as well as state-of-the-art ETL (extract, transform, load), database and visualization technologies for 3D cadastral data lifecycle management in current practices. The proposed steps for recording, preserving, and disseminating 3D cadastral data are crucial in shifting current 2D cadastral systems towards 3D digital information systems. The results showed improvements in data creation, storage, conversion, and communication when upgrading from a 2D to 3D digital cadastre. Therefore, this study confirmed that streamlining the lifecycle of cadastral data using 3D environments would mitigate issues associated with the current fragmented 2D cadastral datasets used in the multi-story developments.

Verified
Journal Article
Open access
PDF file
Hamed OlfatHamed Olfat
Hamed Olfat
DSDavood Shojaei
Davood Shojaei
MBMark Briffa
Mark Briffa
SMSusannah Maley
Susannah Maley
 Abbas  Rajabifard Abbas Rajabifard
Abbas Rajabifard
EPlan, as a digital cadastral data initiative, is a collaborative program between the land authorities and the surveying industry which aims to replace paper and PDF cadastral plans and surveys with digital data. ePlan is currently operational in Australia, New Zealand and Singapore. ePlan was introduced in the State of Victoria in 2011 and has been operational in this jurisdiction for 2D plans since 2013. On average, one ePlan application is currently submitted to a digital plan lodgment portal every two weeks. The low uptake of ePlan is caused by several technical and non-technical challenges. This paper provides an overview of cadastral information transitioning from paper to digital in Victoria. The research methodology to identify the challenges in Victoria for the adoption of ePlan is then described. This is followed by a discussion on the identified challenges. The paper then proposes a generic framework of strategic actions to increase the uptake of digital cadastral data based on the lessons learned from Victoria. The initiatives suggested by this framework to address the ePlan challenges in Victoria and increase its uptake are also introduced. The paper concludes with a direction for future research.

1 November 2019 in Electronics
Verified
Journal Article
Open access
PDF file
Behnam AtazadehBehnam Atazadeh
Behnam Atazadeh
Hamed OlfatHamed Olfat
Hamed Olfat
Behzad RismanchiBehzad Rismanchi
Behzad Rismanchi
DSDavood Shojaei
Davood Shojaei
 Abbas  Rajabifard Abbas Rajabifard
Abbas Rajabifard
In multi-owned buildings, a community of residents live in their private properties while they use and share communal spaces and facilities. Proper management of multi-owned buildings is underpinned by rules related to health, safety, and security of the residents and visitors. Utilizing Internet of Things (IoT) devices to collect information about the livable space has become a significant trend since the introduction of first smart home appliances back in 2000. The question about who owns the IoT generated data and under what terms it can be shared with others is still unclear. IoT devices, such as security camera and occupancy sensors, can provide safety for their owners, while these devices may capture private data from the neighborhood. In fact, the residents are sometimes not aware of regulations that can prevent them from installing and collecting data from shared spaces that could breach other individuals’ privacy. On the other hand, Building Information Modelling (BIM) provides a rich 3D digital data environment to manage the physical, functional, and ownership aspects of buildings over their entire lifecycle. This study aims to propose a methodology to utilize BIM for defining the legal ownership of the IoT generated data. A case study has been used to discuss key challenges related to the ownership of IoT data in a multi-owned building. This study confirmed that BIM environment can facilitate the understanding of legal ownership of IoT datasets and supports the interpretation of who has the entitlement to use the IoT datasets in multi-owned buildings.