Landslide susceptibility assessment is critical for hazard mitigation and land-use planning. This study evaluates the impact of two different non-landslide sampling methods—random sampling and sampling constrained by the Global Landslide Hazard Map (GLHM)—on the performance of various machine learning and deep learning models, including Naïve Bayes (NB), Support Vector Machine (SVM), SVM-Random Forest hybrid (SVM-RF), and XGBoost. The study area is a 2 km buffer zone along the Duku Highway in Xinjiang, China, with 102 landslide and 102 non-landslide points extracted by aforementioned sampling methods. Models were tested using ROC curves and non-parametric significance tests based on 20 repetitions of 5-fold spatial cross-validation data. GLHM sampling consistently improved AUROC and accuracy across all models (e.g., AUROC gains: NB +8.44, SVM +7.11, SVM–RF +3.45, XGBoost +3.04; accuracy gains: NB +11.30%, SVM +8.33%, SVM–RF +7.40%, XGBoost +8.31%). XGBoost delivered the best performance under both sampling strategies, reaching 94.61% AUROC and 84.30% accuracy with GLHM sampling. SHAP analysis showed that GLHM sampling stabilized feature importance rankings, highlighting STI, TWI, and NDVI as the main controlling factors for landslides in the study area. These results highlight the importance of hazard-informed sampling to enhance landslide susceptibility modeling accuracy and interpretability.
Snowdrift, as a natural disaster, constantly compromises railway traffic by affecting how snow accumulates on the subgrade. This paper establishes a unified set of similarity criteria for wind tunnel testing, using viscous silica sand to simulate snow particles. By employing a geometric scale model (1:30) and similarity criteria (size, motion, dynamics, accumulation patterns, and time scales), it systematically investigates the evolution patterns of wind-induced snow accumulation on two types of roadbed structures: embankments and excavations. This study also evaluates the effectiveness of snow fences, proposing optimized placement distances and quantifying the effects of snow accumulation platform width. The results showed the following: (1) Snow on embankments has a “U”-shaped distribution, with the lowest wind speed (<0.5 m/s) and maximum accumulation at the leeward slope’s foot. In excavations, snow forms an “M”-shaped distribution, with significantly reduced wind speeds (<1 m/s) on the accumulation platform. (2) Snow fences effectively manage snow placement by lowering wind speed (below 1 m/s). A single-row snow fence with a porosity of 50% and a height of 3 m performs best when placed at seven times its height (7 H) from the slope’s toe. (3) A 5 m snow accumulation platform in excavations reduces surface snow accumulation (distribution coefficient drops to 1.6), outperforming scenarios without a platform (coefficient of 2.0). These findings contribute to the prevention and control of snowdrift disasters along railway lines in cold regions. They offer practical guidance for optimizing snow fence configurations, while also laying a foundation for future improvements in experimental accuracy through advanced techniques such as PIV and real-snow testing.
Landslides represent the most destructive and prevalent geological hazards along mountainous highways, severely imperiling the construction and maintenance of road infrastructure. To mitigate risks associated with high slopes during construction, a systematic evaluation of landslide susceptibility is imperative. This study introduces an assessment method developed over three years of engineering practice, integrating ten parameters that are intricately linked to construction scale, geological conditions, and engineering design. The method innovatively employs the Index Complexity Algorithm (ICA) to ascertain the weight distribution of the parameters, thereby diminishing the impact of subjective biases in qualitative assessments and enhancing the objectivity and precision of the evaluation. Utilizing the slope in China as a case study, the paper meticulously demonstrates the application of the assessment method. A comprehensive evaluation of the slope’s geological context, construction scale, and design rationality by the ICA algorithm yields a quantified risk score for the slope’s potential hazards. The findings indicate that the slope is classified as high risk (Grade III) during highway construction, necessitating the implementation of risk mitigation measures such as prestressed anchor cables and grouting anchorage. Beyond offering a novel methodological approach to landslide risk assessment, the method significantly contributes to the sustainable construction and operation of mountainous highways. Anticipated refinements in the assessment process and the parameter are poised to augment the method’s efficacy in slope engineering safety management, thereby bolstering the long-term stability and environmental sustainability of mountain highways.
Snowdrift is a major natural hazard, endangering basic installation and human life in cold regions. Drifting snow can cause snow grains to accumulate on the road, blocking transportation, reducing visibility, and even leading to fatal traffic accidents. Field measurements and numerical simulations of roadbed snow characteristics were carried out along the railway in snowy weather to study the effect of snowdrift on railway subgrade. The influence of a typical roadbed structure is considered, and the basic model of a typical subgrade structure under the action of snowdrift is proposed. Snow particles that accumulate on the embankment present a U-shaped distribution along the inflow direction. Within the increase of embankment height, wind velocity on the roadbed surface is accelerated, and snow cover is reduced, thus mitigating the snow drift disaster of the embankment. Snow covers at embankment heights of 1 and 2 m are considerably greater than those at 3 and 5 m, and identical with those at roadbed heights of 3 and 5 m. Along the inflow direction, the snow cover on the cutting presents an M-shaped distribution. As cutting depth is reduced, wind velocity inside the cutting is decelerated, and snow cover is increased, which aggravates the snow drift disaster of the cutting. The snow depths of roadbed parts at 1-, 2-, and 3-m depths of the cutting are nearly the same, and that at a 5-m depth of the cutting is relatively small but still larger than that on the embankment. Numerically simulating the snow-driving wind via computational fluid dynamics, which can consider the motion characteristics of snow particles and their influence on flow field, is feasible. Simulation results agree with the measured results. Thus, this research provides a path for the further prediction of snow cover pattern.
The construction of tunnels can easily trigger the reactivation of old landslide bodies, posing a threat to the transportation safety. In this study, using methods such as engineering geological investigation, slope deformation monitoring, deep displacement monitoring, and numerical simulation, the interaction between landslides and tunnels was investigated from the perspective of landslide deformation and failure characteristics. The Walibie Tunnel (WLBT) of Shangri-La to Lijiang (XL) expressway was taken as an example. The results showed that there were two unstable slopes developed in the upper part of the tunnel, with the new active landslides. Shallow and deep creeping deformation zones also exist within the landslide area. Combining the position of the deformation zones of the unstable slopes and the actual tunnel damage observed, it was determined that the failure mode of the tunnel was longitudinal tensile fracture in the traction section-tunnel. Numerical simulation and field investigation revealed the mechanism of interaction between the WLBT and landslides: the traction section of the tunnel passed through the unstable slope parallelly, and during the continuous opening and expansion process at the rear edge of the unstable slope, a significant tensile force was exerted on the tunnel, resulting in initial tensile fracture damage.