Young Suk Kim

Prof. Young Suk Kim


Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2016 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
HYHyun-Seok Yoo
Hyun-Seok Yoo
YKYoung Suk Kim
Young Suk Kim
Road pavements require periodic maintenance and repair, which as a national infrastructure facility requires an enormous annual. The crack sealing method has been widely used in the implementation of pavement repair and maintenance. Developed countries have recognized the importance of the crack sealing method and have continuously pursued research on the development of automated crack sealing equipment such as ARMM(Automated Road Maintenance Machine), OCCSM(Operator Controlled Crack Sealing Machine), and TTLS(Transfer Tank Longitudinal Sealer) since the early 1990s. In 2004, APCS(Automated Pavement Crack Sealer), which seals routed cracks on the road, was developed in Korea, and since 2009, the development of ACSTM(Automated Crack Sealer with Telescopic Manipulator) for the sealing of non-routed cracks has been underway. Because the non-routed crack is characterized by a very narrow width of 2~3 mm, in comparison to the routed crack, it is necessary to use high-resolution pavement images of over five million pixels in order to detect non-routed cracks. Moreover, it is very effective to employ intelligent algorithms that can distinguish cracks and noise from the high-resolution images using the morphological characteristics of non-routed crack. The purpose of this study is to develop an intelligent algorithm, which can distinguish crack and noise by eliminating the noise, to enable the ACSTM equipment in easy detection of the non-routed cracks. This study subjects the binary high-resolution images of the non-routed cracks to artificial neural network and binary logistic regression analysis for this purpose of intelligently discerning the crack images from the noise. Actual pavement images have been used to compare and verify the accuracy of the proposed algorithm in identifying cracks.

24 May 2018 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
PDF file
DYDong-Jun Yeom
Dong-Jun Yeom
HSHae-Mi Seo
Hae-Mi Seo
YKYoo-Jun Kim
Yoo-Jun Kim
CCChung-Suk Cho
Chung-Suk Cho
YKYoung Suk Kim
Young Suk Kim
Accurate prediction of the construction duration is imperative to the reliable cash flow analysis during the project planning phase when feasibility analysis is carried out. However, lack of information and frequent changes that occur as a result of a negotiation process between the owner and the designer in defining the project scope make it difficult to compute real-time construction duration. Domestic and foreign models for calculating the construction durations cannot be readily applied to computation of construction duration for general office buildings in Korea specifically during the project planning phase as there is a limit in its applicability due to numerous restrictions. Moreover, there are no preceding studies suggesting different computational approaches to predict the entire construction duration for office buildings with the approximate construction duration concept during planning phase. Therefore, based on the collected performance data, this study proposes a multiple linear regression model that facilitates reliable prediction of approximate construction duration for office buildings in the project planning phase. The model will allow the owner and other stakeholders to predict the real-time construction duration using the basic information on office buildings and to assess the construction durations incorporating frequent changes during the project planning phase.

30 August 2016 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
HYHyun-Seok Yoo
Hyun-Seok Yoo
YKYoung Suk Kim
Young Suk Kim
In Korea, an intelligent excavation robot has been recently developed in an effort to reduce fuel consumption by improving the work efficiency and automating operation of conventional excavator in earthwork. It is a fully automated excavation robot based on a new paradigm of being able to manage and perform self-driving, three-dimensional (3D) modeling of the local terrain, automated excavation, loading, and 3D global modeling of the entire earthwork site, as well as adopt an intelligent task plan system. The intelligent excavation robot scans the 3D terrain of the excavation site through a sensor and processes the virtual scan image to implement the earthwork plan in the same manner as a human worker would. The purpose of this study is to develop a 3D local terrain modeling system with a 2D laser scanner that can rapidly and economically model the 3D local terrain for the intelligent excavation robot. The developed sensor system is installed in the intelligent excavation robot to test its performance in an actual earthwork site, and its field test result is also presented in this study as well. Finally, conclusions are made concerning the value of implementing and practically using the proposed 3D local terrain modeling system in earthwork.

3 September 2019 in Journal of Asian Architecture and Building Engineering
Verified
Journal Article
Open access
DYDong-Jun Yeom
Dong-Jun Yeom
HYHyun-Seok Yoo
Hyun-Seok Yoo
YKYoung Suk Kim
Young Suk Kim
The recently developed intelligent excavation robot in Korea is a fully automated excavator equipped with global 3D modeling capabilities for an entire earthwork site and an intelligent task planning system. The intelligent excavation robot includes features such as autonomous driving, 3D surround modeling, autonomous excavation, loading, etc. An intelligent excavation robot features technology that allows for accurate recognition of objects near the excavator, including the terrain of surrounding environments, location of obstacles in the excavator’s path, and any approaching trucks and moving people. Such technology is critical to ensuring work quality and safety. In this study, we develop the hardware for a 3D surround laser sensing system that enables 3D image modeling of the terrain surrounding an intelligent excavation robot. By mounting a sensor onto an intelligent excavation robot, we conducted performance tests to determine the robot’s 3D modeling capabilities of the terrains and obstacles at an actual earthwork site. The experimental results are applied to an object recognition system for detecting the properties of the terrain of the workspace around the excavator, any approaching people, trucks, obstacles, etc. The proposed hardware includes a wide range of applications in the development of future automated construction equipment.

2 November 2019 in Journal of Asian Architecture and Building Engineering
Verified
Journal Article
Open access
YKYoo-Jun Kim
Yoo-Jun Kim
DYDong-Jun Yeom
Dong-Jun Yeom
YKYoung Suk Kim
Young Suk Kim
The nature of mixed-use building’s characteristics should be considered to calculate a proper construction duration for mixed-use buildings in project planning phase. However, the existing construction duration prediction models are incapable to reflect the nature as they were developed mainly for single-use buildings such as apartment buildings or office buildings. Therefore, the purpose of this study was to suggest a multiple linear regression model for mixed-use buildings that can help the owner and contractor predict a proper construction duration in the project planning phase. To do so, 1,969 mixed-use building project data were collected: 1,182 project data (60% of the total data) were used to develop the prediction model while the remaining 787 project data (40% of the total data) were used for validation. The final prediction model for mixed-use buildings with 5 independent variables was suggested in this study. Its R2 was 0.637 and Ra2 was 0.635. In addition, the results of the validation showed that the prediction model’s average prediction accuracy, MAPE and RMSE were 88.51%, 75.94, and 11.49% respectively. Given that the prediction model is applied in the project planning phase when there is insufficient information on the project, the results are believed to be at a considerably reliable level. This prediction model will allow the end user to make simple and quick predictions of a construction duration of a mixed-use building based only on the basic information in the project planning phase.

1 March 2010 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
SHSe Joon Hong
Se Joon Hong
Jongwon SeoJongwon Seo
Jongwon Seo
YKYoung Suk Kim
Young Suk Kim
SKSang Hyeok Kang
Sang Hyeok Kang
Technology valuation is a very important prerequisite for technology transaction which, in turn, boosts the development and the commercialization of new technologies. Valuation of construction technologies has challenges caused by unique characteristics of the industry that differ from the manufacturing industry where technology valuation has been established and used frequently. This paper presents a review of the technology valuation methodology, identifies the important factors that should be considered in the valuation of construction technology, and proposes a guideline for construction technology valuation. A real-world case study on a new construction technology for construction and/or maintenance of bridge piers is also presented based on the proposed valuation methodology.