Onur Gölbaşı

Onur Gölbaşı

orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2022 in Transportation Research Part D: Transport and Environment
Verified
Journal Article
Closed access
OGOnur Gölbaşı
Onur Gölbaşı
EKElif Kina
Elif Kina

5 May 2020 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
OGOnur Gölbaşı
Onur Gölbaşı
MTMerve Olmez Turan
Merve Olmez Turan

1 November 2017 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
OGOnur Gölbaşı
Onur Gölbaşı
NDNuray Demirel
Nuray Demirel

30 May 2016 in Minerals
Verified
Journal Article
Open access
PDF file
NDNuray Demirel
Nuray Demirel
OGOnur Gölbaşı
Onur Gölbaşı
Reliability-based maintenance policies allow qualitative and quantitative evaluation of system downtimes via revealing main causes of breakdowns and discussing required preventive activities against failures. Application of preventive maintenance is especially important for mining machineries since production is highly affected from machinery breakdowns. Overburden stripping operations are one of the integral parts in surface coal mine productions. Draglines are extensively utilized in overburden stripping operations and they achieve earthmoving activities with bucket capacities up to 168 m3. The massive structure and operational severity of these machines increase the importance of performance awareness for individual working components. Research on draglines is rarely observed in the literature and maintenance studies for these earthmovers have been generally ignored. On this basis, this paper offered a comprehensive reliability assessment for two draglines currently operating in the Tunçbilek coal mine and discussed preventive replacement for wear-out components of the draglines considering cost factors.

11 January 2024 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
OGOnur Gölbaşı
Onur Gölbaşı
Sahin Furkan SahinerSahin Furkan Sahiner
Sahin Furkan Sahiner

20 June 2017 in International Journal of Mining, Reclamation and Environment
Verified
Journal Article
Closed access
OGOnur Gölbaşı
Onur Gölbaşı
NDNuray Demirel
Nuray Demirel
This research study proposed a novel algorithm, called time-counter, to optimise inspection intervals of production systems. The developed algorithm was applied to two active draglines. The algorithm evaluated random uptime/downtime characteristics of the draglines and the planned dragline halts in the mine. Physical and random non-physical costs were included and annual maintenance cost minimisation was achieved. Dragline-1 and Dragline-2 inspection intervals were optimised as 232 and 184 h and their maintenance costs were reduced by 5.9 and 6.2% compared to the current interval, respectively. This study is the first initiative in cost-effective inspection interval optimisation of a mining machinery.