Stéphane Morin Pépin

Prof. Stéphane Morin Pépin

Construction Engineering, École de Technologie Supérieure, Montréal, Quebec, Canada
orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2017 in Procedia Engineering
Verified
Journal Article
Open access
Adel FrancisAdel Francis
Adel Francis
Stéphane Morin PépinStéphane Morin Pépin
Stéphane Morin Pépin

30 May 2024 in Frontiers in Built Environment
Verified
Journal Article
Open access
Stéphane Morin PépinStéphane Morin Pépin
Stéphane Morin Pépin
AFAdel Francis
Adel Francis
The new trend in planning building projects involves incorporating space management on the construction site. Failing to consider the management of site operations can lead to either relaxed or congested construction sites. This is because labor, tools, equipment, and materials all require space. It is important to plan for the circulation and temporary storage of materials, including recycling, reuse, and disposal. Temporary installations and finished products also take up space and can impact traffic flow. For example, partitions can impair traffic flow, while finished flooring can restrict it. The occupation of spaces also changes as the work progresses, so it is important to monitor and accommodate these changes. Therefore, space management needs to be coordinated throughout the construction phase. Traditional planning methods do not consider the analysis of critical spaces or their evolution over time. As a result, they produce schedules that do not reflect the reality of the construction site. Dynamic space-time planning means modelling the operational flow in different sectors of the construction site to optimize the construction process. Efficient space occupation allows for more effective utilization of available resources. This paper aims to analyze the spatial requirements of various construction operations and develop standardized artifacts that integrate spatial information into the schedule. To achieve this objective, the methodology aims to: (i) Conduct site surveys to collect data and analyze construction operations and their spatial needs; (ii) Define the necessary parameters for determining the occupancy rate (OR); (iii) Develop the needed artifacts for representing the static models based on the survey results and the developed occupancy parameters to visually depict and compute various types of occupancy and operations; (iv) Conduct workshops with the professionals in the construction industry. The participants were asked to provide feedback on whether the artifacts effectively captured the various aspects of construction work, such as equipment, tools, materials, and safety protocols. The aim is to validate that the artifacts as reliable representations of real-life construction scenarios. The feedback and input provided by the professionals helped to ensure that the artifacts were accurate, informative, and valuable for training purposes in the construction industry.

1 October 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Stéphane Morin PépinStéphane Morin Pépin
Stéphane Morin Pépin
Adel FrancisAdel Francis
Adel Francis
For building projects, the manager is responsible for coordinating the work of subcontractors at the construction site. This includes operations, material flows, and storage. In summary, one of their main roles is to ensure smooth team rotation, maintain fluid circulation, and avoid congestion or relaxation on the site. However, traditional tools lack the ability to consider the planning and management of worksite spaces when calculating the execution schedule and critical path. Consequently, three-week planning is usually carried out separately on independent plans, often using spreadsheets. In addition, a construction site is highly dynamic and mobile in nature, and the positioning of resources and workers can change daily. This makes the management of available space even more complex, and effective space management becomes an imperative. To address this challenge, this paper develops visual dynamic artifacts that present different operation types. The methodology and the conceptual framework facilitate the calculation of the Occupancy Rate (OR) that enables construction project managers to create simple yet dynamic spatiotemporal models of the construction schedule. By incorporating factors such as crew turnover and occupancy evolution, managers can simplify the calculation process and effectively optimize construction work by utilizing site occupancy rates. In summary, this paper presents the Dynamic Model of the Occupancy Rate Schedule (DMORS), a methodology developed through design science. This model utilizes created artifacts representing various operation types to ensure accurate calculations of dynamic occupancy by floor and sector in a site. Consequently, it enables the construction of a more realistic schedule based on critical space ideologies. The DMORS enables managers to use the OR for different floors and sectors of a site, allowing for better space management. A proof of concept demonstrates that this tool can enhance the efficiency and productivity of construction projects by optimizing crew schedules and resource allocation based on site OR.

23 January 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
Stéphane Morin PépinStéphane Morin Pépin
Stéphane Morin Pépin
Effective space management remains a fundamental yet frequently underestimated determinant of construction project success, as inadequate spatial planning leads to reduced productivity, congested work areas, inefficient resource movements, and elevated safety risks. This paper addresses the limitations of traditional static space-planning approaches by introducing the Dynamic Location Breakdown Structure (DLBS), a flexible, layered methodology for systematically organizing and dynamically updating construction sectors throughout project execution. The DLBS enables project managers to use architectural drawings and construction schedules to create structured representations of both interior and exterior sectors, organized into sequential layers that correspond to major construction stages—including preparatory work, excavation, structural erection, MEP installations, space division, finishing, and closure. Unlike conventional location breakdown structures that remain fixed throughout construction, the DLBS adapts to the evolving spatial configuration of the site as new areas emerge and existing sectors transform in response to structural progress, temporary installations, and resource deployments. For each defined sector, the methodology establishes four essential parameters: accessibility status (open, restricted access, temporary closure, or not accessible), maximum available area, occupied area, and remaining area. These parameters provide the informational foundation necessary for dynamic spatiotemporal calculations of occupancy rates within the broader Dynamic Modeling of Occupancy Rate Scheduling (DMORS) framework. By integrating DLBS with Chronographic Modeling \citep{Francis2004,Francis2016a, Francis2019a} principles, this research establishes a comprehensive approach to construction space management that enables proactive decision-making, resource optimization, congestion identification, and improved coordination among work crews throughout the construction lifecycle.

13 June 2025 in The Open Civil Engineering Journal
Verified
Journal Article
Open access
PDF file
Stéphane Morin PépinStéphane Morin Pépin
Stéphane Morin Pépin
AFAdel Francis
Adel Francis
Introduction: Efficiently updating construction schedules is vital for managing dynamic workflows. Traditional methods like Gantt charts rely on manual updates, but newer approaches, such as Chronographic Modelling and Dynamic Modelling of Occupancy Rate Scheduling (DMORS), require tracking spatial positioning and occupancy rates of teams and resources. Given the complexity of these tasks, emerging technologies are being adopted to enhance data collection. Methods: This study reviews recent advancements in tracking construction site occupancy and spatial positioning. It categorizes these technologies into three main types: image and video capture, 3D point cloud generation, and sensor-based tracking systems. Each method is evaluated based on seven essential criteria: data collection speed, portability, accuracy, worksite impact, post-processing time, accessibility, and technology maturity. Results: The research provides a selection framework for contractors, helping them choose the most suitable tools based on project size and complexity. High-precision tools like LiDAR and laser scanning are ideal for large contractors requiring detailed modelling, while smaller firms may prefer cost-effective solutions such as manual data collection with photos or videos. Discussion: This research highlights that no single technology meets all needs for tracking construction site occupancy. High-precision tools offer accuracy but may disrupt work, while simpler methods are easier to use but less detailed. So, depending on the size of the contractor or the project, the best technology may vary. Conclusion: Ultimately, this paper supports the integration of space planning schedules in construction management by offering a structured approach to implementing modern data capture technologies. The study also highlights future trends, advocating for multi-technology integration to improve accuracy and exploring the potential of artificial intelligence for automated data analysis.