Pham Van Kien

Dr. Pham Van Kien


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 August 2017 in Energies
Verified
Journal Article
Open access
PDF file
VNVan Duong Ngo
Van Duong Ngo
DLDinh Duong Le
Dinh Duong Le
Le Kim-HungLe Kim-Hung
Le Kim-Hung
PKPham Van Kien
Pham Van Kien
ABAlberto Berizzi
Alberto Berizzi
For power systems with long-distance ultra-high-voltage (UHV) transmission lines, power transmission limits are often determined by static stability limits. Therefore, the assessment of stability and finding solutions to improve the stability reserve are essential for the operation of the system. This article presents an analytical approach to construct limit characteristics according to static stability conditions on a power plane. Based on the approach proposed, a program is developed and tested on a system with long-distance UHV transmission lines, showing a good performance.

2 August 2024 in Electronics
Verified
Journal Article
Open access
PDF file
NNNhi Thi Ai Nguyen
Nhi Thi Ai Nguyen
DLDinh Duong Le
Dinh Duong Le
VNVan Duong Ngo
Van Duong Ngo
PKPham Van Kien
Pham Van Kien
VHVan Ky Huynh
Van Ky Huynh
Today, renewable energy sources (RESs) are increasingly being integrated into power systems. This means adding more sources of uncertainty to the power system. To deal with the uncertainty of input random variables (RVs) in power system calculation and analysis problems, probabilistic power flow (PPF) techniques have been introduced and proven to be effective. Currently, although there are many techniques proposed for solving the PPF problem, the Monte Carlo simulation (MCS) method is still considered as the method with the highest accuracy and its results are used as a reference for the evaluation of other methods. However, MCS often requires very high computational intensity, and this makes practical application difficult, especially with large-scale power systems. In the current paper, an advanced data clustering technique is proposed to process input RV data in order to the decrease computational burden of solving the PPF problem while upholding an acceptable level of accuracy. The proposed method can be effectively applied to solve practical problems in the operating time horizon of power systems. The developed approach is tested on the modified IEEE-300 bus system, indicating good performance in reducing computation time.

8 July 2026 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
PKPham Van Kien
Pham Van Kien
TNThanh Dang Nhat
Thanh Dang Nhat
KAKiet Mai Van Anh
Kiet Mai Van Anh
THTri Phan Hien
Tri Phan Hien
VQViet Ho Quoc
Viet Ho Quoc
Commercial synchronism-check relays are routinely used for generator synchronization and medium-voltage paralleling, but they are not specifically intended for low-voltage transformer loop-closing, where loop impedances are typically as low as 50–150 mΩ. This paper presents a safety and reliability assessment of a mobile low-voltage load-transfer device applied to the Cam Le distribution network of Da Nang Power Company. A phasor-domain analytical model shows that the minimum 6° relay setting can produce circulating currents of 311–414 A for typical 250–400 kVA transformer pairs, equivalent to as much as 2.76 times the 150 A thermal limit of the prototype transfer chain. Consequently, safe short-distance operation must be characterized by a coupled ΔV–Δφ–Z loop –I max constraint envelope with post-close current interlocking, rather than by phase-angle permissive alone. The analysis further shows that increasing cable cross-section may reduce loop impedance and increase loop-closing current, although it improves voltage drop during load transfer. For reliability quantification, 19 actual outage events from the Cam Le network are evaluated using Monte Carlo simulation and deterministic sensitivity analysis. For one device, the estimated benefit is ΔSAIDI=0.054 min/customer/year and ΔENS=996 kWh/year, with a P5–P95 interval of 0.027–0.096. Because the assumed deployment time is approximately 20 min, the device primarily reduces interruption duration and energy not supplied, rather than directly reducing IEEE SAIFI or MAIFI. Extended-distance cases for L=450–500 m reveal a transition from circulating-current constraints to voltage-drop constraints.