On the basis of the Fengqi Chaoming project in Hangzhou City, Zhejiang Province, China, this paper investigates the influence of pile foundation construction on the existing tunnels in a metro protection area to ensure the stability and safety of the pile foundation construction in the area of Hangzhou Metro Line 2 through in situ pile tests and numerical simulations. The test results show that the pile foundation construction has a certain influence on the existing metro tunnels, and the degree of influence gradually decreases as the distance between the pile foundation and the metro tunnel increases. The corresponding impact level for the pile foundation at 12 m from the tunnel is 1.06 mm, and that for the pile foundation at 4.9 m from the tunnel is 1.18 mm. Different types of pile foundations also lead to different degrees of influence. The maximum settlement corresponding to triaxial cement mixing piles is 1.89 mm, while the hard-method occlusal piles is 1.18 mm. The monitoring point of the metro tunnel with the smallest distance from the pile foundation experiences the largest deformation, but several sets of deformation data meet the requirements of the deformation control index, indicating that the pile foundation construction is safe and controllable.
Metro foundation pits are important components of urban infrastructure projects. Dewatering and excavation are essential stages in foundation pit construction; however, this process can significantly induce groundwater drawdown, as well as diaphragm wall deformation and surface settlement. Based on a subway station foundation pit project, in this study, we employ three-dimensional numerical software to simulate the process of dewatering and excavation. A refined model is used to investigate groundwater seepage, the deformation of the retaining structure, and surface settlement under spatial effects. The finite element model accounts for stratified excavation and applied prestress conditions for the support system within the foundation pit. Its accuracy is validated through a comparison and analysis with measured data from the actual foundation pit. The results indicate that foundation pit excavation leads to significant groundwater drawdown around the pit and the formation of a characteristic “funnel-shaped” drawdown curve. Moreover, extending the diaphragm wall length contributes to maintaining a higher external groundwater level surrounding the foundation pit. The horizontal displacement of the diaphragm wall increases progressively during dewatering and excavation, and the bending moment of the diaphragm wall exhibits a trend consistent with its horizontal displacement. Surface settlement decreases as the length of the diaphragm wall increases.