The electrification of public transport, particularly Bus Rapid Transits (BRT), is a significant step toward achieving sustainable urban mobility and reducing dependency on fossil fuels. However, rapid adoption of Electric Vehicles Smart Charging (EVSC) infrastructure presents grid stability, economic and environmental concerns. The rising demand for electric cars, particularly in developing nations such as Nigeria, highlights the urgent need for a sustainable hybrid renewable energy charging infrastructure for BRT systems. This study presents a techno-economic assessment of an off-grid hybrid systems that use photovoltaic (PV), wind turbines (WTs), hydrogen (H2), fuel cell (FC) and battery technologies to power Electric Vehicles Smart Charging within Bus Rapid Transits networks. The Lagos BRT charging system at City Mall Station (CMS) serves as a case study, with hourly renewable resources obtained from National Aeronautics and Space Administration database (NASA). Using the HOMER pro-optimization tool, a multi-criteria analysis is performed to evaluate system viability, with special focus on key metrics such as levelized cost of energy (LCOE), net present cost (NPC), renewable energy fraction (REF), and greenhouse gas (GHG) emissions. The simulation results demonstrate that the hybrid PV/wind/FC/battery configuration is exceptionally economical, with an LCOE as low as $0.222/kWh, $2.03M NPC, 51.3% REF, and 159,209 kg of carbon dioxide emissions per year compared to grid-dependent charging. The study shows that integrated renewable-hydrogen systems are not only financially feasible, but also provide significant insights for policymakers, transportation authorities, and energy planners seeking to accelerate the transition to green public transportation infrastructure through innovative hybrid energy schemes.