Hacı Abdullah Uçan

Dr. Hacı Abdullah Uçan

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 November 2025 in Engineering Computations
Verified
Journal Article
Closed access
Tayfun DedeTayfun Dede
Tayfun Dede
TSTheint Shwe Sin
Theint Shwe Sin
MYMehmet Yılmaz
Mehmet Yılmaz
HUHacı Abdullah Uçan
Hacı Abdullah Uçan
RRRavipudi Venkata Rao
Ravipudi Venkata Rao
Purpose: This research introduces novel algorithms (NDS-II-BMR and NDS-II-BWR) that combine the simplicity of best-mean-random (BMR) and best-worst-random (BWR) approaches with the opting mechanisms of NDS-II. Design/methodology/approach: This study expands on earlier comparison assessments by adding a broader range of algorithms, including MOPSO, NSGAII, PESA2 and WOA, to provide a more comprehensive evaluation approach for the proposed NDSII-BMR and NDSII-BWR algorithms. In addition to typical performance measurements, this study utilizes sophisticated statistical validation through the Wilcoxon signed-rank test to determine the statistical significance of performance differences across this varied range of multi-objective optimization approaches. Findings: The results demonstrate the effectiveness of NDSII-BMR and NDSII-BWR in optimizing costs and decreasing safety risks while minimizing time efficiency. These outcomes underscore the applicability of these models for managing complex construction projects in real-world scenarios. Originality/value: This study employs multi-objective functions to minimize the total project time and cost while reducing overall safety risks. The proposed model integrates the NDS-II framework with innovative strategies, best-mean-random (BMR) and best-worst-random (BWR).


10 November 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
HUHacı Abdullah Uçan
Hacı Abdullah Uçan
EOEmrah Ozdemir
Emrah Ozdemir
SSSerhun Saglam
Serhun Saglam
GÖGafura Aylak Özdemir
Gafura Aylak Özdemir
EMEnder Makineci
Ender Makineci
Open-grown trees in cities can improve environmental conditions by providing sustainable ecosystem services. Reliable data are necessary for assessing the functions of urban trees. The diameter at breast height (DBH), diameter increment, and annual ring measurements are the main parameters in the development of reliable models. To model periodic mean diameter increments calculated for different time periods (5, 10, 15, 20, and 25 years), a total of 43 open-grown stone pines (Pinus pinea L.) of different diameter classes were sampled in several urban parks in Istanbul, Türkiye. The DBH was measured, and increment cores were extracted from each tree at 1.30 m stem height using an increment borer. Tree age at breast height was determined by counting annual rings, and periodic mean diameter increments were calculated for different periods based on the measured tree-ring widths. The periodic mean increments of different periods were related to the inside-bark diameter at breast height and tree age. Since there was no significant relationship between tree age and periodic mean increments for each period’s length, as shown in the correlation analysis, models used to estimate the periodic mean increments of inside-bark DBH were developed using the least squares regression and quantile regression (QR) techniques. As the period length increased, the estimation success of the diameter increment models increased while the mean absolute percentage error (MAE) values decreased from 40 to 32%. The best model was the one used for the last 25-year period with the quantile value q = 0.50 which estimated the diameter increment with an RMSE = 1.391 mm/year and MAE = 32.27%.

16 February 2026 in Biological Diversity and Conservation
Verified
Journal Article
Closed access
AEAlper Evcen
Alper Evcen
HUHacı Abdullah Uçan
Hacı Abdullah Uçan
BGBulent Gozcelioglu
Bulent Gozcelioglu
Sea caves are exceptional yet highly vulnerable marine habitats, harboring rich and specialized biodiversity. Recognized as priority habitats under the EU Habitats Directive (92/43/EEC) and the Barcelona Convention, they play a critical role in supporting unique species assemblages. Despite their ecological importance and widespread presence throughout the Mediterranean, quantitative data on the biodiversity and ecological functioning of sea caves particularly in the Eastern Mediterranean remain scarce. This study aims to document the biodiversity of Kaynak Sea Cave, located in the Aydıncık district of Mersin (Türkiye), and to contribute to a scientific framework for the conservation of sensitive species and key habitats in the region. Biodiversity assessments were conducted through scuba diving surveys and photographic documentation by experienced divers. A total of 119 species belonging to 12 major taxonomic groups (Phaeophyceae, Rhodophyta, Chlorophyta, Porifera, Cnidaria, Polychaeta, Crustacea, Mollusca, Bryozoa, Echinodermata, Tunicata, Pisces) were identified from photographic records. However, it is presumed that the actual species richness is significantly higher. This baseline inventory underscores the ecological value of Kaynak Cave and highlights the need for future comprehensive studies focusing on cryptic fauna, soft-bottom habitats, and seasonal-spatial dynamics of benthic communities.

22 October 2026 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
HUHacı Abdullah Uçan
Hacı Abdullah Uçan
Purpose: This study develops and evaluates an integrated framework for modular construction and Just-in-Time (JIT) logistics under narrow street and constrained site conditions in urban regeneration areas. Design/methodology/approach: A simulation-based optimization approach is proposed by integrating discrete event simulation (DES) (SimPy), genetic algorithm optimization and Monte Carlo analysis. Three construction strategies, namely conventional construction, modular bulk delivery and modular JIT delivery, are comparatively analyzed under stochastic uncertainties. Findings: Results show that modular construction significantly reduces project duration, cost, and urban externalities compared to conventional construction. Modular bulk delivery consistently outperforms JIT delivery on duration, cost, street closure and noise exposure; JIT’s sole measurable advantage is the elimination of on-site storage requirements. Accordingly, JIT should be regarded as a constraint-driven fallback strategy, appropriate when staging space is unavailable, rather than a performance-superior alternative to bulk delivery. Under the JIT configuration, optimal parameters are identified as a 10-hour buffer time and a 6-module (minimum feasible) storage capacity, though this configuration still yields an 18.75% late-delivery rate, reflecting an inherent reliability trade-off in space-constrained JIT operations. Originality/value: Rather than proposing new simulation or optimization techniques, the study’s contribution lies in applying and calibrating established methods, namely DES, genetic algorithms and Monte Carlo analysis, to the previously under-examined problem of JIT logistics parameter tuning under severe narrow-street spatial constraints, and in providing empirical evidence that JIT delivery functions as a constraint-driven fallback strategy rather than a generally preferable alternative to bulk delivery.