Mehmet Yılmaz

Mehmet Yılmaz

Auto-generated profile, based on publicly available information

Mehmet Yılmaz

Erzincan Binali Yildirim University Department of Construction Technology

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 November 2024 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
MYMehmet Yılmaz
Mehmet Yılmaz
TDTayfun Dede
Tayfun Dede
Purpose: The purpose of this study is to enable the planning of construction projects with simultaneous consideration of time, cost and safety risks. It also aims to improve the decision-making process by evaluating the effectiveness of the Rao-2 algorithm in solving multi-objective time-cost-safety risk problems. In the end, this model is designed to support project managers in enhancing management approaches by addressing project challenges and constraints more efficiently. Design/methodology/approach: In this study, the Rao-2 algorithm, along with Grey Wolf Optimization (GWO) and Whale Optimization algorithm (WOA), were improved using the crowding distance-based non-dominated sorting method. Rao-2 was first compared to GWO and WOA. Subsequently, it was compared with well-established algorithms in the literature, including genetic algorithm (GA), particle swarm optimization (PSO) and differential evolution (DE). The C-metric, hypervolume and spread metrics were employed for performance measurement. The performance of the algorithms was evaluated on four case studies consisting of 11, 13, 18 and 25 activities. Findings: The results revealed that Rao-2 performs better than other algorithms as the number of activities increases, when compared using the Hypervolume, Spread and C-metric measures. In terms of performance measures, the GWO algorithm outperformed Rao-2 in some evaluation metrics for the instance involving 11 activities. However, as the number of activities grew, the Rao-2 method consistently generated higher-quality Pareto fronts and outperformed GWO and WOA in all evaluation metrics. The solutions generated by Rao-2 were also superior to those obtained from GA, PSO and DE in all case studies, further demonstrating the capability of our framework to produce a wide range of optimal solutions with high diversity across different case studies. Originality/value: This research demonstrates that Rao-2 not only improves solution quality when generating Pareto fronts but also achieves better results with fewer function evaluations compared to GA, PSO and DE. The algorithm's efficiency makes it particularly well-suited for optimizing time, cost and safety risks in large-scale construction projects, which in turn positions Rao-2 as a better choice for such projects by producing superior results compared to other algorithms. By providing high-quality solutions with reduced computational demands, Rao-2 offers a faster and more resource-efficient tool for decision-making, contributing to advancements in both the theory and practice of construction project management.

1 May 2025 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
MYMehmet Yılmaz
Mehmet Yılmaz
Tayfun DedeTayfun Dede
Tayfun Dede


18 November 2025 in Engineering Computations
Verified
Journal Article
Closed access
Tayfun DedeTayfun Dede
Tayfun Dede
TSTheint Shwe Sin
Theint Shwe Sin
MYMehmet Yılmaz
Mehmet Yılmaz
HUHacı Abdullah Uçan
Hacı Abdullah Uçan
RRRavipudi Venkata Rao
Ravipudi Venkata Rao
Purpose: This research introduces novel algorithms (NDS-II-BMR and NDS-II-BWR) that combine the simplicity of best-mean-random (BMR) and best-worst-random (BWR) approaches with the opting mechanisms of NDS-II. Design/methodology/approach: This study expands on earlier comparison assessments by adding a broader range of algorithms, including MOPSO, NSGAII, PESA2 and WOA, to provide a more comprehensive evaluation approach for the proposed NDSII-BMR and NDSII-BWR algorithms. In addition to typical performance measurements, this study utilizes sophisticated statistical validation through the Wilcoxon signed-rank test to determine the statistical significance of performance differences across this varied range of multi-objective optimization approaches. Findings: The results demonstrate the effectiveness of NDSII-BMR and NDSII-BWR in optimizing costs and decreasing safety risks while minimizing time efficiency. These outcomes underscore the applicability of these models for managing complex construction projects in real-world scenarios. Originality/value: This study employs multi-objective functions to minimize the total project time and cost while reducing overall safety risks. The proposed model integrates the NDS-II framework with innovative strategies, best-mean-random (BMR) and best-worst-random (BWR).

8 April 2023
Verified
Book Chapter
Closed access
PDF file
MYMehmet Yılmaz
Mehmet Yılmaz
TDTayfun Dede
Tayfun Dede
RRRavipudi Venkata Rao
Ravipudi Venkata Rao